100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
logo-home
CTS Exam Prep Questions and answers 100 Accurate Verified $12.49   Add to cart

Exam (elaborations)

CTS Exam Prep Questions and answers 100 Accurate Verified

 0 view  0 purchase
  • Course
  • Institution

CTS Exam Prep Questions and answers, 100% Accurate. Verified. What are the four teams that comprise the overall Project Team? Who would belong to the Design team? Which groups make up the Management Team? The End-User, Facility Manager and Building Committee comprise which team within the Proje...

[Show more]

Preview 4 out of 31  pages

  • March 24, 2024
  • 31
  • 2023/2024
  • Exam (elaborations)
  • Questions & answers
avatar-seller
CTS Exam Prep Questions and answers, 100%
Accurate. Verified.

1). What are the four teams that comprise the overall project team?

 Ans: Owner, Design, Installation, and Management


2). Who would belong to the design team?

 Ans: Anyone with Consultant in their title except the moving consultant


3). Which groups make up the management team?

 Ans: Developer, Construction Manager, and Building Management Agency


4). The end-user, facility manager and building committee comprise which team within the
project team?

 Ans: Owner


5). Which group represent the generic roles that are important to the project process?

 Ans: Project Managers, Designers and Installers


6). Which project characteristics must be considered in order to determine which method is
best suited for a particular project?

 Ans: Schedule, Size, Type, Complexity, and Procurement Requirements


7). What is an important aspect of funding that has a direct impact on the project process and
design/installation?

 Ans: Technical Support Funding


8). Whether a construction project is large or small, which milestones must be achieved in a
typical schedule?




PaperStoc.com Page 1 of 31

,  Ans: Programming, Building Design, AV Bid, and Move-In


9). What type of project is a typical consultant-led design-bid-build contract structure good
for?

 Ans: Long term projects with extended project cycles


10). What is the risk in using an ofe/integrator installed contract structure?

 Ans: System and infrastructure design and facility functionality may suffer


11). What are some of the important project scope and size considerations in selecting an av
provider?

 Ans: Financial Stability, Current Workload, and Company Credentials


12). What type of document typically includes project size requirements, corporate profile,
team personnel, and warranty response time?

 Ans: RFQ


13). A significant difference between the two-envelope bid
method and the qualifications- based selection method?

 Ans: Negotiate with the highest ranking firm to finalize the contract


14). What is one of the disadvantages of contracting the av integrator to the electrical
subcontractor?

 Ans: More layers of responsibility and communication


15). When conducting a complete project bid process, what milestone follows the issuing of
the rfp?

 Ans: Pre-Bid Meeting


16). Under what circumstances would you likely use an a305-1986 form?

 Ans: Scoring responses to an RFQ




PaperStoc.com Page 2 of 31

, 17). What is the ideal way to contract an av integrator?

 Ans: Directly to the Owner


18). The process of identifying the activities that end-users need to perform, and developing
the functional descriptions of your systems is referred to as:?

 Ans: Needs Analysis


19). What is the main task of the third step of the program phase of a project?

 Ans: Conducting program meetings


20). What should be included in the written program report?

 Ans: ...A conceptual and functional system description


21). The more accurate means to estimate dimensions of a commercial space during a site
inspection would be to?

 Ans: Count Ceiling Tiles in a drop tile instalation


22). A client requires a new boardroom. the sales person and engineer are sent to the premises
to measure the facility and talk to the client. at this stage they should be performing a _

 Ans: Needs Analysis


23). Sightlines for audience viewing in a given presentation space can be improved by:

 Ans: Providing a sloped, or stepped, seating arrangement


24). After presenting a proposal, what is the correct plan of action for following up with the
client?

 Ans: Regularly, until a decision is made


25). Av professionals determine the end user's needs by examining three things: the required
applications, the tasks, and the:

 Ans: Functions to support the applications




PaperStoc.com Page 3 of 31

, 26). When working with a client to design an av solution for a new conference center, the client
requests a detailed budget for the equipment and installation. what phase is the project
in?

 Ans: Design phase


27). The hdtv aspect ratio is equal to which of the following?

 Ans: 1.78:1


28). Please select the appropriate resolution for sxga.

 Ans: 1280 x 1024


29). The brightness control adjusts which level?

 Ans: Black Level


30). For what purpose would the av technician designate a loopback internet protocol address
in the 127.0.0.1 to 127.255.255.254 range in a network configuration?

 Ans: To test the local device to see if TCP/IP is working on your system


31). It is important to consider polar patterns when____

 Ans: Selecting Microphones for use at live events


32). When training a new user how to operate the solution that has been provided, which of the
following is a best practice?

 Ans: Provide complete user documentation prior to training


33). What is a benefit of offering a free training session for a client with new equipment?

 Ans: It is a positive approach for a long-term partnership


34). Which phase comes first in a project?

 Ans: The Program Phase




PaperStoc.com Page 4 of 31

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller Academik001. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $12.49. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

79373 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
$12.49
  • (0)
  Add to cart