100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
logo-home
IMSA Workzone Questions and answers latest update $14.99   Add to cart

Exam (elaborations)

IMSA Workzone Questions and answers latest update

 4 views  0 purchase
  • Course
  • IMSA Workzone Safety
  • Institution
  • IMSA Workzone Safety

IMSA Workzone Questions and answers latest update

Preview 2 out of 12  pages

  • March 15, 2024
  • 12
  • 2023/2024
  • Exam (elaborations)
  • Questions & answers
  • IMSA Workzone Safety
  • IMSA Workzone Safety
avatar-seller
Schoolflix
IMSA Workzone On the shoulder adjacent to traffic being controlled - correct answer The work zone starts at the first advance warning sign; therefore, where should the flagger stand when directing traffic in a TTC zone? three - correct answer How many orange and black TTC signs should there be in each direction on a 2 -
way, 2 -lane rural roadway? 500 ft. - correct answer What should the sign spacing be on a two -lane, two -way rural highway? 350 ft - correct answer How many feet apart should the advanced warning signs be on a high speed urban roadway? on the left hand side of the highway - correct answer For additional emphasis on a high speed urban roadway, signs may be posted: _________ The distance required to safely route traffic from one lane to another - correct answer Taper length refers to: speed and width of lane closed - correct answer taper length is based on: equal in feet to the speed limit - correct answer in a taper, the maximum distance between channelizing devices should be: traffic should pass to the left - correct answer on a barricade, if the stripes start at the upper right side and angle down to the lower left side: ________ at least 28" tall and retroreflectorized with at least two white bands and two orange bands - correct answer at night and/or on high speed roads greater than 45 mph, cones shall be: __________ at the beginning of the taper - correct answer one a rural two -lane road, where would you place the flagger in respect to the beginning of the taper for a closed lane? 1) Type of work to be done 2) traffic volume 3) traffic speed 4) school bus routes - correct answer What are some factors that should be considered in formulating a TTC plan? diversion - correct answer the rerouting of traffic onto a temporary bypass road is known as a: __________ removed by grinding - correct answer pavement markings no longer needed should be: routinely - correct answer a TTC zone should be checked: Standard Statement - correct answer in the MUTCD a mandatory condition is a: a statement of a permissive condition - correct answer in the mutcd an option is: temporary traffic control plan - correct answer A TTC plan is a: typical application drawings - correct answer A TTC plan should include: be trained and/or certified - correct answer The MUTCD states that individuals responsible for the implementation of TTC measures should: 1) traffic safety, movement, and guidance 2) TTC zone inspection 3) TTC zone maintenance - correct answer TTC principles and procedures should include: during both day and night - correct answer work zones should be inspected:

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller Schoolflix. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $14.99. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

76449 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
$14.99
  • (0)
  Add to cart