100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
logo-home
Lean Six Sigma exam $5.76   Add to cart

Exam (elaborations)

Lean Six Sigma exam

 11 views  0 purchase
  • Course
  • Institution
  • Book

The documents cover the exam (chapter 6) of Lean Six Sigma GreenBelt of the Minor Supply Chain Management.

Preview 2 out of 8  pages

  • February 16, 2024
  • 8
  • 2023/2024
  • Exam (elaborations)
  • Questions & answers
avatar-seller
1h30p

QUESTION 1

During which phase of DMAIC is a SIPOC usually applied according to Theisens?
A Impro
ve
b Contr
ol
c Analy
sis
D Defin
e


QUESTION 2
1. In the context of lean, the company plans to introduce self-managing teams. Given is an
assembly line with the following 5 operations and capacities per employee.
● Operation 1: 20 units per hour per employee

● Operation 2: 40 units per hour per employee

● Operation 3: 12 units per hour per employee

● Operation 4: 16 units per hour per employee

● Operation 5: 20 units per hour per employee
An LSS GB wants to apply line balancing to achieve maximum flow and resource efficiency.
Several employees (also part-time) can be deployed for one operation. It may also happen that
an employee performs multiple operations.
How many employees are at least needed in the self-managing team if the takt time is 2
minutes?
The basic principle is that every employee can perform all operations.
Round to the nearest whole number.
Total processing time
= (60/20) +(60/40) +(60/12) +(60/16) +(60/20)
=16,25 = sum of cycle time
Number of resource = Sum of cycle time/ Task time = 16,25/2 = 8
employee


10 points
QUESTION 3
1. At which station is the bottleneck?
Lathe
Robot
Assembly
Package

10 points
QUESTION 4
1. A factory works for 480 minutes every day (excluding maintenance and breakdowns). When
production planning, they take into account a downtime of 30 minutes per day due to
disruptions and planned maintenance. The machine runs for a total of 450 minutes.

, The factory produces three products with the following forecast average daily demand: 9 A's,
6 B's, and 3 C's. The processing time for each product is 15 minutes and the setup time for the
start of each batch is unknown. These are the same for all products A, B and C. So a new setup
is required to start each batch. You can assume that the batch of a product can be finished the
next day without any additional setup.

What is the setup time per batch in hours for an EPE of 4 days?




Capacity of machine (total available working time) = 450 minutes 20 points
Processing time a day for 3 products = 15*(9+6+3) = 270 min QUESTION 5
The remaining time = 450-270 = 180 m 1. It is stated
The set-up time for 4 products = EPE *Remaining time = 4 days * 180 = that when
720m
The set-up time for 1 product = 720/3=240m ====240/60 = 4 hours

manufacturing a toaster, 20 possible defects can occur per product. 2500 toasters were
produced. 50 defects were found during the inspections of the toasters.
Calculate DPU to two decimal places (e.g., 0.43). 0.02
DPU = Amount of Defects/ Number of Units
= 50/2500 = 0,02
10 points
QUESTION 6
1. A Sperta service technician receives electric bicycles from dealers every day that need to be
repaired. It is given that an electric bicycle can have 100 possible defects. The number of
opportunities is therefore 100 per product.
He discovered yesterday that 8 out of 10 bicycles had 1 or more faults. So 2 electric bicycles
were correct. A total of 20 defects were found.
Calculate the DPMO.
20,000 (use the comma)
DPMO = (Number of defects*1,000,000)/ (Opportunities*Number of Units)
Number of units = 10
10 points
QUESTION 7
1. Which of the following best describes the difference between ppm and DPMO?
DPMO assumes that each part/process can have only one defect possibility unlike ppm where
each unit can have multiple defects.
PPM considers the defective unit as a whole, while DPMO refers to multiple opportunities per
part / process.
Opportunite in the object and area
Ppm is determined by dividing the number of defective units by the number of non-defective
units.
DPMO ignores the number of "defective opportunities" per product, while ppm distinguishes
between products with many "defective opportunities" and those with few "defective
opportunities".

10 points
QUESTION 8

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller trangphan. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $5.76. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

79064 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
$5.76
  • (0)
  Add to cart