MN Boilers test practice (special) The dial on a steam gauge on a low-pressure boiler must be graduated from _ to _ times the maximum allowable working pressure - correct answer 1 1/2 to 2 What is the minimum size of pipe diameter that may be used to attach a steam gauge to a steam boiler? - co...

[Show more]

Preview 2 out of 7  pages

  • February 11, 2024
  • 7
  • 2023/2024
  • Exam (elaborations)
  • Questions & answers
  • MN Boiler License
  • MN Boiler License
avatar-seller
Studyclass
MN Boilers test practice (special)

The dial on a steam gauge on a low-pressure boiler must be graduated from _ to _ times the maximum
allowable working pressure - correct answer 1 1/2 to 2



What is the minimum size of pipe diameter that may be used to attach a steam gauge to a steam boiler?
- correct answer 1/4 inch



Steam boilers are designed to operate at or below what PSI? - correct answer 15



Liquid Boilers are designed to operate at or below what PSI? - correct answer 160



What is the term of the area of the boiler that has water/liquid on one side and the heat source on the
other? - correct answer Heating Surface



What type of safety valve is required on a steam boiler? - correct answer Spring-Loaded



When the heating surface of a _____-pressure boiler exceeds ____ square feet, the minimum number of
safety valves is what? - correct answer High, 500, 2 or more



4 1/2 inches is the maximum size safety valve that may be installed on on a _________ boiler - correct
answer low-pressure



The maximum size safety relief valve on a low-pressure boiler is what? - correct answer 4 1/2 inches



How many Kw equals 1 boiler horsepower? - correct answer 10



10 Kw is equal to how much boiler horesepower? - correct answer 1

, What does ASME stand for? - correct answer American Society of Mechanical Engineers



What does NBIC stand for? - correct answer National Board Inspection Code



What kind of stamp is needed in order to legally be able to weld on a boiler? - correct answer "R"



In the state of Minnesota, how often do Boilers get inspected by an insurance company or a State Boiler
Inspector? - correct answer Yearly



How many square feet is considered equivalent to 1 boiler horsepower? - correct answer 10



What must be easily accessible/in view in the boiler room? - correct answer Boiler log, certificates of all
employees qualified to work on boiler



What is the minimum size pipe that may be used to connect a water column to high pressure boilers?
(other than miniature boilers) - correct answer 1 inch



Water columns of steel must be used if pressure is over _____ psi - correct answer 350



An outside _____ and ______ _______ valve may be used between a high-pressure steam boiler and the
water column - correct answer screw, yolk, gate



How must water column connections be at right angle turns to enable cleaning and inspections? -
correct answer Must be a cross instead of an elbow.



_____ is the minimum size drain required on a water column - correct answer 3/4 inch



If the water gauge glass became plugged or broken on a steam boiler, the boiler could temporarily
operate using the _____? - correct answer gauge-cocks(try-cocks)



A ______ cock used on a steam gauge must be a _ or ____ valve - correct answer Stop, T, lever

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller Studyclass. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $17.99. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

67096 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
$17.99  2x  sold
  • (0)
  Add to cart