100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
logo-home
SOS NERC PREP - RELIABILITY EXAM LATEST 2024 ACTUAL EXAM 200 QUESTIONS AND CORRECT DETAILED ANSWERS (|ALREADY GRADED A+ $20.71   Add to cart

Exam (elaborations)

SOS NERC PREP - RELIABILITY EXAM LATEST 2024 ACTUAL EXAM 200 QUESTIONS AND CORRECT DETAILED ANSWERS (|ALREADY GRADED A+

 1 view  0 purchase
  • Course
  • Institution

SOS NERC PREP - RELIABILITY EXAM LATEST 2024 ACTUAL EXAM 200 QUESTIONS AND CORRECT DETAILED ANSWERS (|ALREADY GRADED A+ SOS NERC PREP - RELIABILITY EXAM LATEST 2024 ACTUAL EXAM 200 QUESTIONS AND CORRECT DETAILED ANSWERS (|ALREADY GRADED A+

Preview 4 out of 104  pages

  • January 23, 2024
  • 104
  • 2023/2024
  • Exam (elaborations)
  • Questions & answers
avatar-seller
SOS NERC PREP - RELIABILITY EXAM LATEST 2024
ACTUAL EXAM 200 QUESTIONS AND CORRECT DETAILED
ANSWERS (|ALREADY GRADED A+

A Balancing Authority has a 200 MW/0.1 Hz frequency bias with zero schedules.
Frequency is 60.00 Hz and ACE is 0, what should the sum of all the Balancing
Authorities Interconnection ties equal?


A) Small MW amount out of the BA
B) System Load
C) Zero
D) Total Generation - ANSWER-C) Zero


A simple power system is composed of three transmission lines that connect the
generation area to the load area. The three lines are different lengths, but each
line has the same impedance. Each line is initially loaded at 200 MW. The SOL of
each line is 400 MW. If one of the three lines trips, what will be the loading on the
shortest remaining line and will the SOL of either remaining line be violated?


A) 400 MW/Yes
B) 400 MW/No
C) 300 MW/Yes
D) 300 MW/No - ANSWER-D) 300 MW/No


During a lightning storm, a fault on a transmission line results in the transmission
relay operating and locking-out. The transmission line cannot be returned to
service. After running a contingency analysis, the Transmission Operator realizes
that if another transmission line relays, there could be cascading outages into a

, SOS NERC PREP - RELIABILITY EXAM LATEST 2024
ACTUAL EXAM 200 QUESTIONS AND CORRECT DETAILED
ANSWERS (|ALREADY GRADED A+

neighboring system. Which of the following actions is appropriate for the
Transmission Operator?


A) Reduce transmission voltages by 5% to reduce customer demand.


B) Notify others in the Interconnection of the situation via an Interconnection-
wide telecommunications system.


C) Continue operations without notifying anyone but try to reduce system
loading.


D) Prepare a disturbance report and forward it to the Reliability Coordinator. -
ANSWER-B) Notify others in the Interconnection of the situation via an
Interconnection-wide telecommunications system.


A Generator Operator has some vibration problems with a 500MW coal fired
steam generator. As the result of the vibration problems the Generator Operator
has to set the maximum reactive power production for that unit at 25 Megavar
instead of the normal 200 Megavar. Who should the generator operator notify as
the result of this problem?


A) Transmission Operator
B) System Coordinator
C) Department of Energy (DOE)
D) Regional Reliability Organization - ANSWER-A) Transmission Operator

, SOS NERC PREP - RELIABILITY EXAM LATEST 2024
ACTUAL EXAM 200 QUESTIONS AND CORRECT DETAILED
ANSWERS (|ALREADY GRADED A+


A high voltage transmission line was scheduled out for routine maintenance
several weeks in advance. On the scheduled outage date, field personnel call to
inform the system operator that they will be taking the line out of service. Bad
weather the previous day has forced other outages. What should the system
operator do?


A) Wait until peak is over to make a decision


B) Run a power flow study to determine the effects of this line outage


C) Do not allow the outage


D) Allow the outage because it was scheduled in advanced - ANSWER-B) Run a
power flow study to determine the effects of this line outage


Interconnection frequency is 60.20 Hz. Your ACE is a large positive value and your
AGC is pulsing your units down. What should you do?


A) Suspend AGC and investigate.
B) Place AGC in flat tie line control.
C) Leave AGC in operation as your units respond.
D) Place AGC in constant frequency control. - ANSWER-C) Leave AGC in operation
as your units respond.

, SOS NERC PREP - RELIABILITY EXAM LATEST 2024
ACTUAL EXAM 200 QUESTIONS AND CORRECT DETAILED
ANSWERS (|ALREADY GRADED A+


Which of the following is the most common effect of a Geomagnetic Disturbance
on the power system?


A) Increase static electricity
B) Transformer cores becoming saturated
C) Generator output varies
D) Abnormal VAR direction - ANSWER-B) Transformer cores becoming saturated


In a power system, which type of power provides indication of voltage problems,
is critical for support of heavily loaded transmission lines, and is necessary to have
sufficient dynamic reserves in preparation for a contingency?


A) Solar Power
B) Real Power
C) Reactive Power
D) Apparent Power - ANSWER-C) Reactive Power


You are a transmission operator and you have several large generators operating
at full load on the western portion of your transmission system with 34 kV and
230 kV transmission lines connecting the generators to the larger metropolitan
and Industrial areas in the eastern portion of your transmission system. You
realize by SCADA indications that there is a large power angle approaching 88
degrees between some of the sending busses at the generation sites and the
receiving buses around the load areas. You realize that the slightest contingency

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller erickarimi. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $20.71. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

76669 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
$20.71
  • (0)
  Add to cart