100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
logo-home
ATI RN MATERNAL NEWBORN WITH NGN PROCTORED 2024 TEST BANK ACTUAL EXAM WITH COMPLETE QUESTIONS ,CORRECT AND VERIFIED ANSWERS ALREADY GRADED A+ $21.99   Add to cart

Exam (elaborations)

ATI RN MATERNAL NEWBORN WITH NGN PROCTORED 2024 TEST BANK ACTUAL EXAM WITH COMPLETE QUESTIONS ,CORRECT AND VERIFIED ANSWERS ALREADY GRADED A+

 0 view  0 purchase
  • Course
  • Institution

When does the CGP apply? - ANSWER- Any construction or demolition of one acre or more Activities under the CGP include: A. Routine maintenance to maintain original line and grade, hydraulic capacity, or original purpose of the facility. B. Disturbances to land surfaces solely related to agric...

[Show more]

Preview 3 out of 19  pages

  • January 21, 2024
  • 19
  • 2023/2024
  • Exam (elaborations)
  • Questions & answers
avatar-seller
ATI RN MATERNAL NEWBORN WITH NGN
PROCTORED 2024 TEST BANK ACTUAL EXAM
WITH COMPLETE QUESTIONS ,CORRECT AND
VERIFIED ANSWERS ALREADY GRADED A+

When does the CGP apply? - ANSWER- Any construction or demolition of one acre or
more
Activities under the CGP include:
A. Routine maintenance to maintain original line and grade, hydraulic capacity, or
original purpose of the facility.
B. Disturbances to land surfaces solely related to agricultural operations.
C. Clearing and grading 2 acres of land
D. Discharges of storm water from areas on tribal lands. - ANSWER- C

Risk Level 2 monitoring requirements include:
A. Effluent sampling where applicable
B. Sampling for pH and turbidity
C. Sampling for pH, turbidity, and suspended sediments - ANSWER- B

All NAL data must be uploaded within ___ after NAL exceedance has been identified
A. 24 hours
B. 1 week
C. 10 days
C. 2 weeks - ANSWER- C

Who must file Permit Registration Documents (PRDs) prior to the commencement of
construction activity?
A. Qualified SWPPP Developer (QSD)
B. Legally Responsible Person (LRP) or the LRP's Approved Signatory
C. Qualified SWPPP Practitioner (QSP)
D. The CEO - ANSWER- B

Which regulation establishes a framework for regulating municipal and industrial storm
water discharges to waters of the United States:
A. Clean Water Act (CWA)
B. Porter-Cologne Water Quality Control Act
C. Endangered Species Act
D. U.S. Environmental Protection Agency (USEPA)
E. California Environmental Quality Act (CEQA) - ANSWER- A

,Certain non-storm water discharges may be necessary for the completion of
construction projects. Therefore the General Permit authorizes such discharges
provided they meet the following conditions except:
A. Meet the NALs for pH and turbidity
B. Not cause or contribute to a violation of water quality standards
C. Comply with BMPs as described in the SWPPP
D. Be infeasible to eliminate
E. Causes or threatens to cause pollution, contamination, or nuisance - ANSWER- E

When possible, use erosion controls as the ___ protection, with sediment controls as a
___system.
A. primary, secondary
B. secondary, primary - ANSWER- A

A temporary or permanent structural BMP that directs concentrated flows away from
disturbed areas and prevents erosion is...
A. erosion control
B. run on/ run off control
C. sediment control - ANSWER- B

The amount of eroded soil that settles out at a point in the watershed that is remote
from the origin of the detached soil particles is...
A. Rainfall Erosivity Factor
B. Slope Length and Steepness Factors
C. Soil Cover Factor
D. Sediment Yield - ANSWER- D

What is turbidity?
A. The degree to which the water loses its transparency due to the presence of
suspended particulates
B. the acidity or alkalinity of a solution
C. the degree to which a chemical substance or a particular mixture of substances can
damage an organism - ANSWER- A

The removal of a uniform thin layer of soil by raindrop splash or water run-off is...
A. Splash Erosion
B. Rill Erosion
C. Sheet Erosion
D. Wind Erosion - ANSWER- C

What elements of RUSLE are independent of location?
A. K
B. R
C. LS
D. C & P - ANSWER- D

, What does the "P" stand for in the Revised Universal Soil Loss Equation (RUSLE)?
A. Soil erodibility factor
B. Management operations and support practices (sediment controls)
C. Rainfall-runoff erosivity factor
D. Length-slope factor
E. Cover factor (erosion controls) - ANSWER- B

What is the difference of an LUP project in comparison to traditional projects?
A. Erosion control is not needed.
B. "Run-On/Run-Off" is not an objective.
C. Sampling is not required. - ANSWER- B
Stockpiles require a linear sediment barrier at all times, and must be covered prior to a
rain event or when inactive. A stockpile is inactive after __days of inactivity.
A. 3
B. 7
C. 10
D. 14 - ANSWER- D

Once identified, dischargers shall begin implementing repairs or design changes to
BMPs:
A. Immediately
B. Within24 hours
C. Within48 hours
D. ASAP, but not more than 72 hours - ANSWER- D

The discharger shall ensure a QSP develop a Rain Event Action Plan (REAP) __ hours
prior to any likely precipitation event.
A. Immediately
B. 24 hours
C. 48 hours
D. ASAP but not more than 72 hours - ANSWER- C

A likely precipitation event is any weather pattern that is forecasted to have a __% or
greater probability of producing precipitation in the project area.
a. 10
b. 25
c. 50
d. 75
e. 99 - ANSWER- C
TRUE OR FALSE: At Risk Level 2 & 3 sites, receiving water monitoring is required if the
receiving water monitoring trigger exceeded pH, turbidity and SSC. Bioassessment for
sites 30 acres or larger. - ANSWER- False (Risk level 3 only)
Visual monitoring is required for non-storm water, pre-rain and post-rain at what Risk
Levels?
a. Risk Level 1
b. Risk Level 2

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller bilhahmbanya3. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $21.99. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

76658 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
$21.99
  • (0)
  Add to cart