Garantie de satisfaction à 100% Disponible immédiatement après paiement En ligne et en PDF Tu n'es attaché à rien
logo-home
SOS NERC Prep - RElIABILITY Exam| 200 QUESTIONS AND ANSWERS (VERIFIED ANSWERS)| GRADED A $23.99   Ajouter au panier

Examen

SOS NERC Prep - RElIABILITY Exam| 200 QUESTIONS AND ANSWERS (VERIFIED ANSWERS)| GRADED A

 2 vues  0 fois vendu
  • Cours
  • Établissement

SOS NERC Prep - RElIABILITY Exam| 200 QUESTIONS AND ANSWERS (VERIFIED ANSWERS)| GRADED A SOS NERC Prep - RElIABILITY Exam| 200 QUESTIONS AND ANSWERS (VERIFIED ANSWERS)| GRADED A

Aperçu 4 sur 107  pages

  • 13 janvier 2024
  • 107
  • 2023/2024
  • Examen
  • Questions et réponses
avatar-seller
SOS NERC Prep - RElIABILITY Exam| 200
QUESTIONS AND ANSWERS (VERIFIED
ANSWERS)| GRADED A

The Reliability Coordinator just informed you of a slow time error correction
which will begin at the top of the next hour. Your EMS system will not let you
change your scheduled frequency. Your Frequency Bias Setting is -100 MW/.1Hz.
What action should you take?


A) Increase Net Interchange Schedule by 20 MWs.


B) Inform the Reliability Coordinator that you cannot participate in the time error
correction.


C) Decrease Net Interchange Schedule by 20 MWs.


D) Increase Net Interchange Schedule by 10 MWs. - ANSWER--A) Increase Net
Interchange Schedule by 20 MWs.


A Balancing Authority has a sudden loss of a large block of load in its area. This
loss will be seen instantaneously in the change of which of the following values?


1. Actual Net Interchange
2. Scheduled Frequency
3. Scheduled Net Interchange
4. Area Control Error

, SOS NERC Prep - RElIABILITY Exam| 200
QUESTIONS AND ANSWERS (VERIFIED
ANSWERS)| GRADED A

A) 4 only
B) 1 & 3
C) 1 & 4
D) 3 & 4 - ANSWER--C) 1 & 4


Metered Data included in the calculation of ACE are: dynamic schedules, pseudo
ties, actual frequency, and all __________.


A) Tie lines readings
B) Generators output
C) Scheduled frequency indications
D) Transformer load - ANSWER--A) Tie lines readings


Balancing Authority A is currently reading a system frequency of 60.00 Hz. Its Net
Actual Interchange is +100 MW and its Net Scheduled Interchange is +200 MW. If
Balancing Authority A's frequency bias setting is 100 MW/0.1 Hz, what is ACE?


A) -100
B) 0
C) 10
D) 100 - ANSWER--A) -100

, SOS NERC Prep - RElIABILITY Exam| 200
QUESTIONS AND ANSWERS (VERIFIED
ANSWERS)| GRADED A

A Balancing Authority has a Net Interchange Schedule of -250 MWs from 1200 to
1600 on a summer day. The Net Interchange Actual for those same hours
respectively were -230 MW, -275 MW, -250 MW and -270 MW. What was the
Balancing Authority's Inadvertent Interchange for the 4-hour period?


A) 6 MWs out
B) 25 MWs in
C) 25 MWs out
D) 6 MWs in - ANSWER--B) 25 MWs in


For the ACE equation to work properly, dynamic schedules, pseudo ties,
frequency, and all ________________ must be metered.


A) Generation
B) Communications
C) Transformers
D) Tie lines - ANSWER--D) Tie lines


If the frequency bias setting is set to a less negative value than the frequency
response of a Balancing Authority and a frequency increase is caused by a sudden
loss of load in an external balancing area, what will be the result?


A) The ACE will be zero and will take no AGC action

, SOS NERC Prep - RElIABILITY Exam| 200
QUESTIONS AND ANSWERS (VERIFIED
ANSWERS)| GRADED A


B) The ACE will be a negative value and AGC will increase generation


C) The ACE will be a positive value and AGC will lower generation


D)This will not affect the ACE - ANSWER--B) The ACE will be a negative value and
AGC will increase generation


If the frequency bias setting is less negative than the frequency response of a
Balancing Authority and a frequency decline is caused by a sudden loss of
generation in an external balancing area, what will be the result?


A) The ACE will be a negative value and AGC will increase generation.


B) This will not affect the ACE.


C) The ACE will be a positive value and AGC will lower generation.


D) The ACE will be zero and will take no AGC action. - ANSWER--C) The ACE will be
a positive value and AGC will lower generation.


It is the responsibility of which entity/entities to develop, maintain, and
implement load shedding plans?

Les avantages d'acheter des résumés chez Stuvia:

Qualité garantie par les avis des clients

Qualité garantie par les avis des clients

Les clients de Stuvia ont évalués plus de 700 000 résumés. C'est comme ça que vous savez que vous achetez les meilleurs documents.

L’achat facile et rapide

L’achat facile et rapide

Vous pouvez payer rapidement avec iDeal, carte de crédit ou Stuvia-crédit pour les résumés. Il n'y a pas d'adhésion nécessaire.

Focus sur l’essentiel

Focus sur l’essentiel

Vos camarades écrivent eux-mêmes les notes d’étude, c’est pourquoi les documents sont toujours fiables et à jour. Cela garantit que vous arrivez rapidement au coeur du matériel.

Foire aux questions

Qu'est-ce que j'obtiens en achetant ce document ?

Vous obtenez un PDF, disponible immédiatement après votre achat. Le document acheté est accessible à tout moment, n'importe où et indéfiniment via votre profil.

Garantie de remboursement : comment ça marche ?

Notre garantie de satisfaction garantit que vous trouverez toujours un document d'étude qui vous convient. Vous remplissez un formulaire et notre équipe du service client s'occupe du reste.

Auprès de qui est-ce que j'achète ce résumé ?

Stuvia est une place de marché. Alors, vous n'achetez donc pas ce document chez nous, mais auprès du vendeur erickarimi. Stuvia facilite les paiements au vendeur.

Est-ce que j'aurai un abonnement?

Non, vous n'achetez ce résumé que pour $23.99. Vous n'êtes lié à rien après votre achat.

Peut-on faire confiance à Stuvia ?

4.6 étoiles sur Google & Trustpilot (+1000 avis)

80364 résumés ont été vendus ces 30 derniers jours

Fondée en 2010, la référence pour acheter des résumés depuis déjà 14 ans

Commencez à vendre!
$23.99
  • (0)
  Ajouter