100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
logo-home
PJM Generation Dispatch Exam Flash Cards Questions & Answers 2024 $12.49   Add to cart

Exam (elaborations)

PJM Generation Dispatch Exam Flash Cards Questions & Answers 2024

 8 views  0 purchase
  • Course
  • PJM Generation Dispatch
  • Institution
  • PJM Generation Dispatch

PJM Generation Dispatch Exam Flash Cards Questions & Answers 2024 Which of the following statements is correct concerning PJM assuming frequency control of the restoration process? A) PJM assumes control once an external transmission tie has been established. B) Once an Area Control Error ...

[Show more]

Preview 4 out of 61  pages

  • January 3, 2024
  • 61
  • 2023/2024
  • Exam (elaborations)
  • Questions & answers
  • PJM Generation Dispatch
  • PJM Generation Dispatch
avatar-seller
Bensuda
PJM Generation Dispatch Exam Flash
Cards Questions & Answers 2024

Which of the following statements is correct concerning PJM assuming frequency control of the
restoration process?



A) PJM assumes control once an external transmission tie has been established.

B) Once an Area Control Error can be calculated, PJM will assume control.

C) Whenever it becomes too much of a burden for any one Transmission Owner within the RTO

D) Whenever the Transmission Owners within the RTO agree to let PJM control the process. - ANSWER-C)
Whenever it becomes too much of a burden for any one Transmission Owner within the RTO



During black start restoration, priority access to cranking power should be given to:



A) Hot units that can return to service immediately.

B) Combustion turbines in areas where the initial disturbance occurred

C)Units with black start capability

D) Hydro Units - ANSWER-A) Hot units that can return to service immediately.



During a restoration, if you are presented with the opportunity to re-connect with the Eastern
Interconnection, you should:



A)Not pursue this opportunity because you may cause the Eastern Interconnection to become unstable.

B) Pursue this opportunity only when you have adequate Dynamic Reserves on your system

C) Pursue this opportunity as quickly as possible

D) Pursue this opportunity only if you need cranking power for your generating unity - ANSWER-C)
Pursue this opportunity as quickly as possible



Complete (Total System) Blackouts are characterized by which of the following?

,1 - Most common type of blackout

2 - May require coordinating multiple islands

3 - Likely to result in Transmission overloads or other issues

4 - Affects a very large geographical area, and many customers

5 - Most commonly caused by human or switching errors



A) 1 & 3

B) 2 & 4

C) 3 & 5

D) 1 - ANSWER-B) 2 & 4



The first step in a system restoration would be to:



A) Immediately notify the media of the event

B) Restore as much of the area load as possible

C) Restore as much under-frequency load as possible

D) Verify that communication is functional with your neighbors - ANSWER-D) Verify that communication
is functional with your neighbors



Why would an offsite power to generating facilities be a priority during the restoration process?



A) To provide safe shutdown power for the units

B) To meet FERC requirements

C) To provide adequate lighting for the plant operators to attempt a restart

D) To prepare and expedite the return of the unit - ANSWER-D) To prepare and expedite the return of the
unit



Factors that help determine the sequence of restoration of off-line generation include (Pick 2):

,-Generation Type

-Unloaded Capacity

-Unit Availability

-Stability of the Generator - ANSWER--Generation Type

-Unit Availability



How often should a Transmission company file an updated restoration report with PJM?



1 - Every 30 minutes

2 - Every hour

3 - Every 10 lines that have been restored

4 - Every 5 lines that have been restored



A) 1 & 4

B) 2 & 3

C) 1 & 3

D) 2 & 4 - ANSWER-C) 1 & 3



Which of the following statements are true concerning delays in restoring auxiliary power to off-line
generation?



1 - The unit could suffer turbine shaft damage

2 - The fuel oil for the unit could congeal

3 - The startup time for the unit will be reduced

4 - The battery life used to maintain critical systems may run out



A) 1, 2 and 3

B) 1, 2 and 4

, C) 1, 3 and 4

D) 2, 3 and 4 - ANSWER-B) 1, 2 and 4



During system restoration, the two categories of reserves are:



A) dynamic and secondary

B) spinning and quick start

C) dynamic and spinning

D) spinning and primary - ANSWER-C) dynamic and spinning



During a system restoration you have 400MW of Steam capacity, 350MW of CT capacity and 300MW of
Hydro capacity restored. Your largest contingency is a 200MW Steam Unit. You have also restored
150MW of under-frequency load. What is your total dynamic reserve? (Load pick-up factors are 5% for
steam, 15% for hydro and 25% for CT)



A) 142.5MW

B) 152.5MW

C) 285MW

D) 292.5MW - ANSWER-C) 285MW



What is the most critical communication path when restoring large load blocks early in a system
restoration?



A) Between the Generating Unit and the Transmission Owner

B) Between PJM and the generating plant

C) Between the Generator Owner (or MOC) and the generating unit

D) Between the transmission owner and the MOC - ANSWER-A) Between the Generating Unit and the
Transmission Owner

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller Bensuda. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $12.49. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

67866 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
$12.49
  • (0)
  Add to cart