100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
logo-home
4th TSSA Part B Unit 4 Exam Questions and Answers. $9.89   Add to cart

Exam (elaborations)

4th TSSA Part B Unit 4 Exam Questions and Answers.

 1 view  0 purchase
  • Course
  • Institution

4th TSSA Part B Unit 4 Exam Questions and Answers.

Preview 2 out of 7  pages

  • December 21, 2023
  • 7
  • 2023/2024
  • Exam (elaborations)
  • Questions & answers
avatar-seller
4th TSSA Part B Unit 4
Exam Questions and
Answers
Larger capacity, high pressure fuel trains are - Answer-more complex

The main burner test firing valve should be opened - Answer-before starting the main
burner

What is the recommended boiler water pH for wet layup? - Answer-10

R4B04-03-03-07 Failure to _____ the furnace thoroughly before light-up can cause a
furnace explosion. - Answer-purge

R4B04-05-02-01 When cooling down a steam boiler that has been taken out of service,
a vent valve on a steam drum should be opened to: - Answer-Prevent a vacuum from
forming in the boiler

How often should operator rounds be performed? - Answer-1 to 3 times per shift

What should Power Engineers carry at all times? - Answer-a flashlight

When a power failure occurs, control valves - Answer-go to a fail-safe position.

When a combustion air opening is equipped with dampers, the dampers must be -
Answer-interlocked with the burner, and fully open before starting the boiler.

New boilers require a _____________ and a _____________ dry-out before entering
operation. - Answer-boil-out, refractory

R4B04-03-03-11 If a steam boiler is in service and no water level shows in the gauge
glass, the first action would be to: - Answer-determine whether the gauge glass is
completely full or completely empty.

Because natural gas is colourless and odourless, ___________ is added to the gas so
that it is easier to detect a leak. - Answer-mercaptan

, In a multiple boiler high pressure steam plant, when starting an entire system from cold
- Answer-The entire system warms and pressurizes as one boiler warms, except for the
boilers being left off line.

On a semi-automatic ignition system, the switch on the supervised cock - Answer-keeps
the boiler from pre-purging if the main test firing valve is open.

Which code contains information on safety valves for high pressure steam boilers? -
Answer-ASME Section I

R4B04-01-02-04 New refractory in a boiler must be thoroughly dried on low fire -
Answer-to dry the refractory slowly and keep it from cracking.

What is the recommended test frequency for flame safeguard devices? - Answer-weekly

If the safety relief valve of a hot water heating boiler is set to open at 207 kPa, the
operating pressure should not exceed - Answer-138 kPa.

R4B04-03-03-06 Furnace explosions may be caused by: - Answer-The accumulation of
fuel-air mixture in the furnace

When preparing to start a steam boiler with a fully modulating firing rate control, set the
manual/automatic switch to _________ and the flame control switch to the __________
position. - Answer-manual, low-fire

Who should verify a steam boiler lockout? - Answer-A second qualified operator.

When closing up a boiler, - Answer-new handhole and manhole gaskets must be used,
to prevent dangerous blowouts and costly unplanned boiler outages.

R4B04-03-02-01 A wide and rapid fluctuation of the water level in a boiler gauge glass
may be the result of: - Answer-High dissolved solids concentration in the boiler water

Which of the following is NOT done when preparing a steam boiler feedwater system? -
Answer-Open the feedwater control bypass valve.

In the event of a power failure, which of the following will likely require a manual restart
when power is restored? - Answer-large air compressors

R4B04-03-03-02 If the water level in the boiler gauge glass cannot be seen, the first
thing to do is: - Answer-Open the gauge glass drain to determine whether the glass is
full or empty.

When warming up a steam boiler, open the boiler drum vent to - Answer-permit the
release of corrosive dissolved gases, such as oxygen and carbon dioxide, from the
boiler water.

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller WisdomLogic. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $9.89. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

82871 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
$9.89
  • (0)
  Add to cart