Order of inspections - 1: forms, basement and crawlspace
2: Plumbing, dampproofing, foundation drainage , sanitary sewer, storm sewer, sump, water service
3: plumbing, electrical, mechanical, gas
4: framing inspection
5: insulation and vapour barrier
6: rainscreen/exterior finishs, drywall
7:...
BC Owner Builder Exam Order of inspections - ✔✔ 1: forms, basement and crawlspace 2: Plumbing, dampproofing, foundation drainage , sanitary sewer, storm sewer, sump, water service 3: plumbing, electrical, mechanical, gas 4: framing inspection 5: insulation and vapour barrier 6: rainscreen/exterior finishs, drywall 7: building envelop in spection 8: final inspection Which is not an acceptable method for determining the correct grading for a trench? - ✔✔ An experienced excavator says it's ok At what depth is shoring required? - ✔✔ 1.2m/4ft Which best describes the principle of rain waterte rm-0 deflection? - ✔✔ Design and construction that prevents water from ever entering What lighting safety certifications are required in Canada? - ✔✔ CSA safety certification What grit of sandpaper would get the smoothest result? - ✔✔ Higher grit with get a smoother finish What is the maximum rise in a flight of stairs? - ✔✔ The vertical height of any flight of stairs should not exceed 3.7m What is the minimum distance that a ladder must extend above a parapet wall or landing? - ✔✔ 3ft What heights are end dams to be on windows and door flashings? - ✔✔ 25mm/1 inch End dam use - ✔✔ Stop water from coming in When should you call for inspectors to make them efficient as possible? - ✔✔ Group inspectors together when possible and call when work is complete When is an HRV required? - ✔✔ Almost always What can you build under the owner -builder HPO process? - ✔✔ Single detached home under a single title. Single dwelling attached to pre -existing building older than 10 years. Single dwelling attached to a new non -residential building. Who issues permits for a gas fireplace? - ✔✔ Safety Authority (call Technical Safe BC) Can an owner builder take out their own electrical permit? - ✔✔ Yes, up to 200A What is the best way to apply asphalt waterproofing on a foundatio n? - ✔✔ Spray -on or roll on dry foundation with 2in. below grade When is the appropriate time to backfill a foundation? - ✔✔ After damp -proofing What do you need to do when applying a peel and stick waterproof membrane foundation? - ✔✔ Use an approved prime r before installing What are gas meter installation requirements? - ✔✔ The distance from the gas vent to the roof must be greater than the overhang of the roof, nothing can be with in 1m either side or 4.5m above a gas meter When do you need to install a handrail or have fall protection? - ✔✔ 10ft, 4ft if no fall protection How high does a construction fence around a site need to be? - ✔✔ 6ft When installing the footer, it was dug down 2in. deeper than what the elevation should be. What needs to happen? - ✔✔ Install the footing form at proper elevation and fill with extra concrete When installing flashing for a roof valley how much do the asphalt shingles need to overlap? - ✔✔ 6in. What would cause a blister on a flat roof? - ✔✔ Moisture trapped under roof Water is backing up in a skylight, what do you do to fix it? - ✔✔ Clear drainage What needs to be done first when starting to install asphalt shingles on a roof? - ✔✔ Install eve protection What kind of fastener can you use in a wood that has been treated with chromated copper arsenate? - ✔✔ Lumber manufacturer approved fastener When should there be insulation under a basement slab? - ✔✔ When there is in floor heating How deep should the control joint be in a concrete slab? - ✔✔ 1/4 of the slab What kind of insulation should be installed under slab? - ✔✔ XPS What kind of insulation has the least moisture permeability? - ✔✔ XPS When framing a header of a staircase where does the framer get the nailing pattern? - ✔✔ Use the BC code section 9 nailing pattern What document must the owner submit to WorkSafe BC prior to starting construction? - ✔✔ Notice of project
The benefits of buying summaries with Stuvia:
Guaranteed quality through customer reviews
Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.
Quick and easy check-out
You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.
Focus on what matters
Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!
Frequently asked questions
What do I get when I buy this document?
You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.
Satisfaction guarantee: how does it work?
Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.
Who am I buying these notes from?
Stuvia is a marketplace, so you are not buying this document from us, but from seller PatrickKaylian. Stuvia facilitates payment to the seller.
Will I be stuck with a subscription?
No, you only buy these notes for $8.49. You're not tied to anything after your purchase.