EPA 608 (TYPE II) | 70 Questions and Answers with complete solution
- Course
- Institution
When a new system has been assembled, the first thing to do is? - Pressurize the system with an inert gas & leak check. After installation of a field-piped R-410A split heat pulp, the unit should first be? - Pressurized with nitrogen then leak checked. The EPA regulations require that any appli...