Crane practice test #3 exam 2023 with 100% correct answers
- Course
- Institution
If the operator is setting up the crane alone, which of the following is required? A. Overhead power lines must be at least 10ft over the boom B. Wind speed cannot exceed on the Beaufort C. The red cones designating the work zone must be set up D. Stabilizers shall be visible to the operator wh...