A configuration management program should focus on ensuring designs are traceable to capability needs, developmental changes are controlled and documented, interfaces are well-defined and understood, and _______________________________. - Answer All product documentation is consistent with its su...

[Show more]

Preview 2 out of 10  pages

  • June 30, 2023
  • 10
  • 2022/2023
  • Exam (elaborations)
  • Questions & answers
  • ACQ 202
  • ACQ 202
avatar-seller
cracker
ACQ 202 Module 4 Exam: Part 1 questions
with correct answers
A configuration management program should focus on ensuring designs are
traceable to capability needs, developmental changes are controlled and
documented, interfaces are well-defined and understood, and
_______________________________. - Answer All product documentation is
consistent with its supporting information.


Which technical review is held during the Technology Maturation and Risk
Reduction phase to ascertain progress in defining system technical requirements? -
Answer System Requirements Review (SRR)


Program cost increases and schedules slips are most likely caused by
__________________, changes to the design, and changes to the production
processes. - Answer Changes to user capability needs.


What group is used to help control the configuration of external interfaces for a
system? - Answer Interface Control Working Group


Your new-start program was approved this year's Authorization Bill and you are
currently operating under Continuing Resolution Authority. To avoid losing a top
engineering from your program, you authorial the Contractor to begin work since
you expect the Appointment Bill to be signed next week. You are now in conflict
with the _____. - Answer Anti-Deficiency Act


Cost, schedule, and performance parameters are interrelated and a change in one
parameters can affect the others. Therefore it is important to involve all the key
stakeholders when considering changes to Acquisition Program Baseline (APB). -
Answer True

, The Joint Interoperability Test Command (JITC) verifies ________________
through the field assessment of systems during exercises and contingencies, and
provides certificates of _____________ upon validation. - Answer
Interoperability performance/ interoperability.


Which of the following configuration baselines provides the details from which a
contractor can transition from design to production of a system? - Answer
Product Baseline


In the interest of independent reporting, Developmental Test and Evaluation
(DT&E) and Operational Test and Evaluation (OT&E) activities may NOT be
integrated. - Answer False


Changes are typical in acquisition programs; therefore, it is important to develop a
sound configuration management strategy, place the Government in control of each
element of the baselines, and design enough flexibility into the system to handle
enhancements. - Answer False.


The _____________ includes details of processes, procedures, and materials used
in fabrication and is usually controlled by the contractor. - Answer Product
Baseline.


A new capability need has surfaced to modify an existing U.S. command and
control system so that it can exchange information with a system operated by a
European ally. Which of the following software best practices must be followed in
order to successfully make this modification? - Answer Define and control
interfaces


When using the cause-and-effect (Fishbone) diagram to resolve an acquisition
problem, after you draw the fishbone diagram, the next step is to
____________________. - Answer Define the problem

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller cracker. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $13.99. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

79064 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
$13.99
  • (0)
  Add to cart