Construction Management Final Exam Over 60 Questions and Answers 100% Verified Why are the MSDS so important for workers to read at the job site? Material Safety Data Sheet provide important knowledge on how to work with toxic materials at the job site. Quality assurance includes all of the fo...

[Show more]

Preview 2 out of 11  pages

  • May 9, 2023
  • 11
  • 2022/2023
  • Exam (elaborations)
  • Questions & answers
avatar-seller
Construction Management Final Exam Over 60 Questions
and Answers 100% Verified
Why are the MSDS so important for workers to read at the job site?
Material Safety Data Sheet provide important knowledge on how to work with toxic
materials at the job site.
Quality assurance includes all of the following practices EXCEPT:
Testing standards
Which of the following is NOT an item of personal protective equipment that
might be used by workers on the jobsite?
Hardhat, Gloves
Which of the following is NOT a type of personal protection equipment?
Skin Protection
Which of the following does NOT describe preparatory inspections?
Preparatory inspections are never done by personnel employed by the contractor
Which of the following are primary cause of injuries in the construction industry?
Slips Trips and Falls, Being crushed or trapped, Electrical shocks
Which of the following are primary component of an effective safety management
plan?
Substance abuse, Hazardous material communications, Personal protection
Which Federal agency is responsible for establishing safety standards and
enforcing them through inspections conducted at construction jobsites?
OSHA
Which quality control mechanism are mandated by the construction contract and
used to check for conformance to the plans and specifications?
submittals, mock ups, shop drawings
Which of the following shows the general relationship between the level of quality
and cost?
when quality increases, cost increases
All of the following are fundamental objectives of a quality management plan:
Do things right the first time, Prevent things from going wrong, Continually improve the
process
What is an FOR?
A report used to track questionable quality and safety performance on the jobsite
Which of the following is a difference between quality control and quality
assurance?
Quality control happens at the project level while quality assurance happens at the
process level
The name of the testing agency for construction in the United States is:
ASTM
What is not the concept behind a zero-punch list?
Complete the final walk-through with as many of the punch items noted on the list, To
have no change orders on the project, Please every expectation of the owner
What is the cost code chart usually made up of?
activity, code, project number

, What is the riskiest element of the project control and project planning?
estimating productivity
Periodic predictions stated in reports as to the final cost and schedule outcomes
on a project while the work is still going on are known as:
forecasts
What is an example of a factor that can impact project performance?
Defective Material, Hurricane in your project area,
Overcrowded Job sites
What is NOT an escalation clause?
It is a clause that covers when the truck can deliver building materials,

It is the same thing as a contingency and tries to account for unforeseen conditions,

It is a clause that covers risks associated with underground utilities, grading, and
excavation
What is the essential(s) of an effective project control system?
Quality Information , Good Reporting system
What does it mean to crash the schedule?
To compress the overall schedule by accelerating certain activities within it so that they
finish sooner
What does it mean to forecast in project management?
To predict the final cost and schedule outcomes on a project while the work is still in
progress
What are the three primary tracking elements when monitoring project
performance?
Quality, Cost, and Time
What is not one of the fundamental steps that is included in the project control
cycle?
update technology
The cost or time difference between the actual project performance and the
planned project performance is the definition of what?
variance
What is NOT an example of a source where you might gather field information
needed to develop your project controls?
requests for information
All of the following are TRUE regarding project activities except?
Used to keep track of your progress on the job
The two types of schedules introduced in this chapter are?
Gantt charts and Network Diagrams
Long lead items that fall into procurement activities include all of the following ?
Custom Lighting Fixtures,
Custom Cabinets ,
Custom Carpets
Gantt Charts are used to:
Show overall length of the project and each activity
What is one type of Network Diagram?

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller magdamwikash23. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $11.49. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

83750 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
$11.49
  • (0)
  Add to cart