ACG Guideline 2023 with complete solution
What are the five phases of commissioning?
1.) Pre-Design
2.) Design
3.) Construction
4.) Acceptance
5.) Post-Acceptance
Studies indicate _ to _% savings in building operating costs when comparing a comissioned building to a non-commissioned buildi...
acg guideline 2023 with complete solution what are the five phases of commissioning 1 pre design 2 design 3 construction 4 acceptance 5 post acceptance studies indicate to savings in
Written for
ACG
All documents for this subject (104)
Seller
Follow
magdamwikash23
Reviews received
Content preview
ACG Guideline 2023 with complete solution
What are the five phases of commissioning?
1.) Pre-Design
2.) Design
3.) Construction
4.) Acceptance
5.) Post-Acceptance
Studies indicate _ to _% savings in building operating costs when comparing a
comissioned building to a non-commissioned building.
8 to 20%
What is commissioning?
A process of documentation, adjustment, testing, verification, and training performed
specifically to ensure that the finished facility operates in accordance with the owner's
documented project requirements and the construction documents. Commissioning
serves the owner's best interests by delivering a facility with systems that perform as
specified, intended, and paid for.
What does DID mean and provide a brief definition?
Design Intent Document - Details functional requirements and Owner's expectations of
how a building will be used and operated - Owner's Project Requirements
What does BOD mean and provide a brief definition?
Basis of Design - The concepts, calculations, decisions, and product selections used to
meet the Owner's Project Requirements.
Designer's (A/E) services typically (do or do not) include field verification that their
design works as intended.
Do NOT
Construction Manager's services typically (do or do not) include functional verification
that the installed systems meet design intent.
Do NOT
The CxA has a distinct responsibility to who?
The Owner
The CxA is not just another layer of inspection, but a catalyst for?
Communication that makes quality solutions possible.
The CxA (is or is not) an inspector.
Is NOT
The commissioning process provides verification that the ____ ____ ____ are
implemented in both the ____ and ____.
Owner's Project Requirements; Design and Construction
New construction commissioning costs _ to _% of total construction cost.
0.5 to 1.5%
Retrocommissioning costs _ to _% of total operation cost.
3 to 5%
New construction commissioning costs _ to _% of total mechanical system construction
cost.
2 to 3%
, New construction commissioning costs _ to _% of total electrical system construction
cost.
1 to 2%
New construction commissioning costs _ to _% of total comprehensive HVAC
construction cost.
2 to 5%
List 7 benefits of commissioning.
1.) Better bid documents
2.) More accurate budgets
3.) More "control" of project
4.) Projects delivered on time
5.) Fewer change orders
6.) Fewer warranty issues
7.) Satisfied client
What is ASHRAE Guideline 1 - 1996 titled?
The HVAC Commissioning Process
What is ASHRAE Guideline 1.1 - 2007 titled?
HVAC&R Technical Requirements for the Commissioning Process
What is ASHRAE Guideline 0 - 2005 titled?
The Commissioning Process
What is the ACG Commissioning Guideline?
Developed by the Associated Air Balance Council (AABC). It is useful for owners,
designers, and constructors but is intended for training Cx providers. It defines the five
(5) phases of the commissioning process. It educates about the Cx process, provides
standard methodologies for Cx, and introduces a program for certifying qualified Cx
providers.
What is the purpose of ASHRAE Guideline 0?
To describe the commissioning process capable of verifying that a facility and its
systems meet the Owner's Project Requirements.
What is the purpose of ASHRAE Guideline 1.1?
To describe the technical requirements for the application of the commissioning process
described in ASHRAE Guideline 0 that will verify that the HVAC&R systems achieve the
Owner's Project Requirements.
Indicate a few items that the OPR would address (10 listed).
1.) Program requirements
2.) Community context
3.) Codes and regulations
4.) Site and climate
5.) Facility context and function
6.) Facility technology
7.) Sustainability
8.) Cost
9.) Schedule
10.) Client's needs and capabilities
What does CxA mean and what is the CxA's job function?
The benefits of buying summaries with Stuvia:
Guaranteed quality through customer reviews
Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.
Quick and easy check-out
You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.
Focus on what matters
Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!
Frequently asked questions
What do I get when I buy this document?
You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.
Satisfaction guarantee: how does it work?
Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.
Who am I buying these notes from?
Stuvia is a marketplace, so you are not buying this document from us, but from seller magdamwikash23. Stuvia facilitates payment to the seller.
Will I be stuck with a subscription?
No, you only buy these notes for $10.39. You're not tied to anything after your purchase.