Exam (elaborations)
My NERC (with solutions)
- Course
- Institution
A misoperation occurred when an overhead ground wire on a 230KV transmission line between two substations broke and fell across A phase of the line. One of the line circuit breakers failed to open causing the breaker failure relay to pick up and as a result tripped the entire substation bus off lin...