100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
logo-home
Exam (elaborations) TEST BANK FOR Analysis, Synthesis and Design of Chemical Processes 3rd Edition By Richard Turton, Richard C. Bailie, Wallace B. Whiting and Joseph A. Shaeiwitz (Solution Manual) $15.49   Add to cart

Exam (elaborations)

Exam (elaborations) TEST BANK FOR Analysis, Synthesis and Design of Chemical Processes 3rd Edition By Richard Turton, Richard C. Bailie, Wallace B. Whiting and Joseph A. Shaeiwitz (Solution Manual)

1 review
 45 views  2 purchases

Exam (elaborations) TEST BANK FOR Analysis, Synthesis and Design of Chemical Processes 3rd Edition By Richard Turton, Richard C. Bailie, Wallace B. Whiting and Joseph A. Shaeiwitz (Solution Manual) Chapter 1 1.1 Block Flow Diagram (BFD) Process Flow Diagram (PFD) Piping and Instrument Diagrams...

[Show more]

Preview 4 out of 578  pages

  • November 7, 2021
  • 578
  • 2021/2022
  • Exam (elaborations)
  • Questions & answers
book image

Book Title:

Author(s):

  • Edition:
  • ISBN:
  • Edition:
All documents for this subject (1)

1  review

review-writer-avatar

By: joeweldon8 • 1 year ago

reply-writer-avatar

By: Expert001 • 1 year ago

Thank you for the review. It helps us gauge the quality of the document and make necessary edits for maximum student satisfaction. Any requests can be made via message.

avatar-seller
Expert001
,
, Chapter 1

1.1 Block Flow Diagram (BFD)
Process Flow Diagram (PFD)
Piping and Instrument Diagrams (P&ID)

(a) PFD
(b) BFD
(c) PFD or P&ID
(d) P&ID
(e) P&ID


1.2 P&ID


1.3 It is important for a process engineer to be able to review a 3-dimensional model prior to
the construction phase to check for clearance, accessibility, and layout of equipment,
piping, and instrumentation.


1.4 (1) Clearance for tube bundle removal on a heat exchanger.
(2) NPSH on a pump – affects the vertical separation of feed vessel and pump inlet.
(3) Accessibility of an instrument for an operator – must be able to read a PI or
change/move a valve.
(4) Separation between equipment for safety reasons – reactors and compressors.
(5) Crane access for removing equipment.
(6) Vertical positioning of equipment to allow for gravity flow of liquid.
(7) Hydrostatic head for thermosiphon reboiler – affects height of column skirt.


1.5 Plastic models are no longer made because they are too expensive and difficult to
change/revise. These models have been replaced with virtual/E-model using 3-D CAD.
Both types of model allow revision of critical equipment and instrument placement to
ensure access, operability, and safety.


1.6 Another reason to elevate the bottom of a tower is to provide enough hydrostatic head
driving force to operate a thermosiphon reboiler.




1-1

, 1.7 (a) PFD or P&ID
(b) PFD
(c) PFD
(d) P&ID
(e) BFD (or all PFDs)


1.8 A pipe rack provides a clear path for piping within and between processes. It keeps piping
off the ground to eliminate tripping hazards and elevates it above roads to allow vehicle
access.


1.9 A structure – mounted vertical plant layout is preferred when land is at a premium and the
process must have a small foot print. The disadvantage is that it is more costly because of
the additional structural steel.


1.10 (a) BFD – No change
PFD – Efficiency changed on fired heater, resize any heat exchanger used to extract
heat from the flue gas (economizer)
P&ID – Resize fuel and combustion air lines and instrumentation for utilities to fired
heater. Changes for design changed of economizer (if present)
(b) BFD – Change flow of waste stream in overall material balance
PFD – Change stream table
P&ID – Change pipe size and any instrumentation for this process line
(c) BFD – No change
PFD – Add a spare drive, e.g. D-301 → D-301 A/B
P&ID – Add parallel drive
(d) BFD – No change
PFD – No change
P&ID – Note changes of valves on diagram


1.11 (a) A new vessel number need not be used, but it would be good practice to add a letter to
donate a new vessel, e.g. V-203 → V-203N. This will enable an engineer to locate the
new process vessel sheet and vendor information.
(b) P&ID definitely
PFD change/add the identifying letter.




1-2

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller Expert001. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $15.49. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

71184 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
$15.49  2x  sold
  • (1)
  Add to cart