[Show more]the effective weight of crane components past a main boom lifting point includes - ANSWER 
an erected jib 
the size and weight per foot of the _____ need to be considered as part of a lift plan - ANSWER 
wire rope 
lift plans are mandatory for - ANSWER steel erection or multiple-crane lifts
Preview 2 out of 5 pages
Add to cartthe effective weight of crane components past a main boom lifting point includes - ANSWER 
an erected jib 
the size and weight per foot of the _____ need to be considered as part of a lift plan - ANSWER 
wire rope 
lift plans are mandatory for - ANSWER steel erection or multiple-crane lifts
When do you apply risk control measures - ANSWER Before starting work and as soon as 
a hazard is identified during operation 
Power line measurements - ANSWER Insulated below 1,000v - 0.5m 
Uninsulated below 1,000v - 1m 
Overhead between 1,000v and 33,000v - 3m 
Overhead above 33,000v - 6m
Preview 2 out of 8 pages
Add to cartWhen do you apply risk control measures - ANSWER Before starting work and as soon as 
a hazard is identified during operation 
Power line measurements - ANSWER Insulated below 1,000v - 0.5m 
Uninsulated below 1,000v - 1m 
Overhead between 1,000v and 33,000v - 3m 
Overhead above 33,000v - 6m
When hoisting personnel on a crane equipped with rotating resistant wire ropes , what is the 
Design ( safety ) Factor required by most safety standards ? - ANSWER 10:1 
Newer designs of wire rope with shaped wires and triangular strands are an attempt to 
prevent rope damage - ANSWER Multiple layer...
Preview 1 out of 3 pages
Add to cartWhen hoisting personnel on a crane equipped with rotating resistant wire ropes , what is the 
Design ( safety ) Factor required by most safety standards ? - ANSWER 10:1 
Newer designs of wire rope with shaped wires and triangular strands are an attempt to 
prevent rope damage - ANSWER Multiple layer...
1. Which of the following statements about a chain hoist is correct? - ANSWER A sling 
should always be used with a chain hoist. 
2. A natural fiber or synthetic rope line used to control the swinging of the load in 
hoisting activities is a: - ANSWER Tag line 
3. Which of the following is an incorr...
Preview 2 out of 6 pages
Add to cart1. Which of the following statements about a chain hoist is correct? - ANSWER A sling 
should always be used with a chain hoist. 
2. A natural fiber or synthetic rope line used to control the swinging of the load in 
hoisting activities is a: - ANSWER Tag line 
3. Which of the following is an incorr...
The formula for determining stress on a snatch block performing a vertical lift is: line pull x 
block factor= block load. What must be done to calculate formula? - ANSWER Multiply the 
load wait by the coefficient of friction to determine line pull, and then use the standard 
formula 
If both fists...
Preview 2 out of 7 pages
Add to cartThe formula for determining stress on a snatch block performing a vertical lift is: line pull x 
block factor= block load. What must be done to calculate formula? - ANSWER Multiply the 
load wait by the coefficient of friction to determine line pull, and then use the standard 
formula 
If both fists...
When a personnel platform is proof tested at what capacity percent is it tested at? - ANSWER 
It's tested at 125% 
Whenever using two or more cranes, how many people are responsible for that lift? - ANSWER 
Ultimately ONE person is responsible for that lift 
Where is the best place to be when drivi...
Preview 2 out of 10 pages
Add to cartWhen a personnel platform is proof tested at what capacity percent is it tested at? - ANSWER 
It's tested at 125% 
Whenever using two or more cranes, how many people are responsible for that lift? - ANSWER 
Ultimately ONE person is responsible for that lift 
Where is the best place to be when drivi...
The net capacity of Crane One is 130,000 lbs. The net compacity of Crane Two is 90,000 lbs. The 
weight of the load is 145,000 lbs. the weight of the equalizer beam is 3,000 lbs. the distance 
between the hook blocks is 25 ft. The load's pick up point on the equalizer beam is - ANSWER 
10 ft. from ...
Preview 2 out of 11 pages
Add to cartThe net capacity of Crane One is 130,000 lbs. The net compacity of Crane Two is 90,000 lbs. The 
weight of the load is 145,000 lbs. the weight of the equalizer beam is 3,000 lbs. the distance 
between the hook blocks is 25 ft. The load's pick up point on the equalizer beam is - ANSWER 
10 ft. from ...
Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.
You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.
Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!
You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.
Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.
Stuvia is a marketplace, so you are not buying this document from us, but from seller KenAli. Stuvia facilitates payment to the seller.
No, you only buy these notes for $35.29. You're not tied to anything after your purchase.
4.6 stars on Google & Trustpilot (+1000 reviews)
77254 documents were sold in the last 30 days
Founded in 2010, the go-to place to buy study notes for 14 years now