Advanced Rigging Exam II (A Graded) |Study Questions and Answers 100% Correct
- Course
- Institution
When do you apply risk control measures - ANSWER Before starting work and as soon as a hazard is identified during operation Power line measurements - ANSWER Insulated below 1,000v - 0.5m Uninsulated below 1,000v - 1m Overhead between 1,000v and 33,000v - 3m Overhead above 33,000v - 6m