[Show more]___________ should not be disassembled in the field. - Oil buffers 
 
Two safety precautions to be followed when first entering the elevator pit are to have the ________ open and the pit light on. - Pit stop switch 
 
Tension on the governor rope is maintained by using a... - Tension sheave...
Preview 1 out of 3 pages
Add to cart___________ should not be disassembled in the field. - Oil buffers 
 
Two safety precautions to be followed when first entering the elevator pit are to have the ________ open and the pit light on. - Pit stop switch 
 
Tension on the governor rope is maintained by using a... - Tension sheave...
Which lay of wire rope has the strand wires in line with the rope axis? - Regular Lay 
 
At what speed should the counterweight safeties be set to trip? - Up to 10% higher than the car governor 
 
Which type of safety uses an oil buffer between the car and safety planks? - Type C 
 
What is...
Preview 2 out of 10 pages
Add to cartWhich lay of wire rope has the strand wires in line with the rope axis? - Regular Lay 
 
At what speed should the counterweight safeties be set to trip? - Up to 10% higher than the car governor 
 
Which type of safety uses an oil buffer between the car and safety planks? - Type C 
 
What is...
You are responsible for storing 64 standard 15 lb. T-rails on one of the floors of a high-rise building. What is the total weight it will put on the floor where it will be stored? - 17,280 lbs. 
 
When working in the hoistway, which of the following safety statements is correct? - The lanyard ...
Preview 1 out of 3 pages
Add to cartYou are responsible for storing 64 standard 15 lb. T-rails on one of the floors of a high-rise building. What is the total weight it will put on the floor where it will be stored? - 17,280 lbs. 
 
When working in the hoistway, which of the following safety statements is correct? - The lanyard ...
A 13 ft. I-beam needs to be cut into 4 equal pieces for blocking beams. What should each beam measure? 
 
(Unit 305) - 3.25 ft. 
 
The plans for the installation of cab walls call for two different size panels. The large panels require 12 bolts and the small panels require 8 bolts. If each car ha...
Preview 2 out of 5 pages
Add to cartA 13 ft. I-beam needs to be cut into 4 equal pieces for blocking beams. What should each beam measure? 
 
(Unit 305) - 3.25 ft. 
 
The plans for the installation of cab walls call for two different size panels. The large panels require 12 bolts and the small panels require 8 bolts. If each car ha...
According to ASME B30.9, what is the maximum width of an object that can be placed in the eye of a wire rope sling? - 1/2 the length 
 
According to OSHA, each day before being used, the sling and all fastenings and attachments shall be inspected for damage or defects by a: - Competent person ...
Preview 2 out of 7 pages
Add to cartAccording to ASME B30.9, what is the maximum width of an object that can be placed in the eye of a wire rope sling? - 1/2 the length 
 
According to OSHA, each day before being used, the sling and all fastenings and attachments shall be inspected for damage or defects by a: - Competent person ...
The elevator pit is located between the sill level and the lowest landing and the - Floor of the elevator hoistway 
 
Four items of personal safety equipment you should have when working in the elevator hoistway are - Hard hat, glasses, harness, safety shoes 
 
All measurements necessary for t...
Preview 2 out of 5 pages
Add to cartThe elevator pit is located between the sill level and the lowest landing and the - Floor of the elevator hoistway 
 
Four items of personal safety equipment you should have when working in the elevator hoistway are - Hard hat, glasses, harness, safety shoes 
 
All measurements necessary for t...
1 in = ? cm - 2.54 cm 
 
1 in = ? mm - 25.4 mm 
 
1 foot = ? cm - 30.48 cm 
 
Best choice of chalk line - cotton twine 
 
6-pt wrench is less likely to? - Slip on worn hex 
 
Reed and Price Screwdriver - Phillips 
 
What shade for welding with 1/8"-5/32" - Shade #10 
 
What sh...
Preview 1 out of 2 pages
Add to cart1 in = ? cm - 2.54 cm 
 
1 in = ? mm - 25.4 mm 
 
1 foot = ? cm - 30.48 cm 
 
Best choice of chalk line - cotton twine 
 
6-pt wrench is less likely to? - Slip on worn hex 
 
Reed and Price Screwdriver - Phillips 
 
What shade for welding with 1/8"-5/32" - Shade #10 
 
What sh...
Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.
You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.
Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!
You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.
Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.
Stuvia is a marketplace, so you are not buying this document from us, but from seller TeeGrades. Stuvia facilitates payment to the seller.
No, you only buy these notes for $24.49. You're not tied to anything after your purchase.
4.6 stars on Google & Trustpilot (+1000 reviews)
76658 documents were sold in the last 30 days
Founded in 2010, the go-to place to buy study notes for 14 years now