Package deal
NCIDQ|National Council for Interior Design Qualification| Tests Bundle Set
NCIDQ|National Council for Interior Design Qualification| Tests Bundle Set
[Show more]NCIDQ|National Council for Interior Design Qualification| Tests Bundle Set
[Show more]Your client would like to relocate from an existing ground floor location to several floors in a new building. You have been hired to evaluate the feasibility of the move. Which action should you take FIRST? 
A. Interview several employees from each division of the company 
B. Determine the usable f...
Preview 2 out of 12 pages
Add to cartYour client would like to relocate from an existing ground floor location to several floors in a new building. You have been hired to evaluate the feasibility of the move. Which action should you take FIRST? 
A. Interview several employees from each division of the company 
B. Determine the usable f...
Which event triggers the issuance of a certificate of occupancy? 
A. Construction work is complete except for fire alarm testing. 
B. The contractor sends you a pay request for 100% complete work. 
C. The owner wants to move into part of the space before the rest is finished. 
D. The city inspector ...
Preview 2 out of 6 pages
Add to cartWhich event triggers the issuance of a certificate of occupancy? 
A. Construction work is complete except for fire alarm testing. 
B. The contractor sends you a pay request for 100% complete work. 
C. The owner wants to move into part of the space before the rest is finished. 
D. The city inspector ...
wheelchair clear floor space and turning radius(feet/inches measurement) - correct answer -30" x 48" 
-60" to make 180 degree turn 
 
ADA doorway width - correct answer 32" minimum opening width at 90 degrees 
 
ADA toilet requirements - correct answer -grab bars mounted at 33-36" above floor ...
Preview 1 out of 3 pages
Add to cartwheelchair clear floor space and turning radius(feet/inches measurement) - correct answer -30" x 48" 
-60" to make 180 degree turn 
 
ADA doorway width - correct answer 32" minimum opening width at 90 degrees 
 
ADA toilet requirements - correct answer -grab bars mounted at 33-36" above floor ...
Occupancy group Answer The minimum number of toilet fixtures for an interior design is determined by occupant load and? 
 
Exit enclosures Answer Where are flame spread ratings in a building the MOST restrictive 
 
1 hour Answer Exit access corridors in non-sprinklered buildings must have a rating o...
Preview 2 out of 9 pages
Add to cartOccupancy group Answer The minimum number of toilet fixtures for an interior design is determined by occupant load and? 
 
Exit enclosures Answer Where are flame spread ratings in a building the MOST restrictive 
 
1 hour Answer Exit access corridors in non-sprinklered buildings must have a rating o...
Advantages of Gypsum Drywall Answer low install cost, quick & easy installation, fire resistance, sound control capability, easy availability, versatility, ease of finishing & decorating, ease of installation of doors/other openings 
 
Gypsum Drywall Edges Answer Tapered: Most common; tapered on fac...
Preview 4 out of 79 pages
Add to cartAdvantages of Gypsum Drywall Answer low install cost, quick & easy installation, fire resistance, sound control capability, easy availability, versatility, ease of finishing & decorating, ease of installation of doors/other openings 
 
Gypsum Drywall Edges Answer Tapered: Most common; tapered on fac...
In addition to analyzing space needs, the requirements for a client's work flow or business process should be compared with the available space. 
Which workflow type does not have strict organized method of work flow? 
 
a. departmental 
b. cooperative 
c. network 
d. linear Answer c. network 
With...
Preview 4 out of 42 pages
Add to cartIn addition to analyzing space needs, the requirements for a client's work flow or business process should be compared with the available space. 
Which workflow type does not have strict organized method of work flow? 
 
a. departmental 
b. cooperative 
c. network 
d. linear Answer c. network 
With...
Your client would like to relocate from an existing ground floor location to several floors in a new building. You have been hired to evaluate the feasibility of the move. Which action should you take FIRST? 
A. Interview several employees from each division of the company 
B. Determine the usable f...
Preview 2 out of 14 pages
Add to cartYour client would like to relocate from an existing ground floor location to several floors in a new building. You have been hired to evaluate the feasibility of the move. Which action should you take FIRST? 
A. Interview several employees from each division of the company 
B. Determine the usable f...
The initial determination of the area required for a client's program gives the Answer Net area 
 
Interior spaces often need to be multifunctional or flexible. What are the three components of flexibility as a programmatic design concept? Answer convertibility, expandability, and versatility 
 
Wh...
Preview 3 out of 23 pages
Add to cartThe initial determination of the area required for a client's program gives the Answer Net area 
 
Interior spaces often need to be multifunctional or flexible. What are the three components of flexibility as a programmatic design concept? Answer convertibility, expandability, and versatility 
 
Wh...
Transmission from room A to room B (pic) Answer The construction assembly shown would be best for controlling which of the following kinds of acoustic situations? 
 
A heavy-duty, silent door closer Answer To detail a doorframe for a conference room where privacy is critical, which of the following ...
Preview 3 out of 20 pages
Add to cartTransmission from room A to room B (pic) Answer The construction assembly shown would be best for controlling which of the following kinds of acoustic situations? 
 
A heavy-duty, silent door closer Answer To detail a doorframe for a conference room where privacy is critical, which of the following ...
Life Cycle Cost Answer The cost of the project, including the combined cost of 
 
• Construction 
• Operation 
• Maintenance of the project throughout its life cycle 
 
Project Cost Answer Significantly affected by the project extent, and includes 
Cost of preliminary studies 
 
• Site cost ...
Preview 2 out of 7 pages
Add to cartLife Cycle Cost Answer The cost of the project, including the combined cost of 
 
• Construction 
• Operation 
• Maintenance of the project throughout its life cycle 
 
Project Cost Answer Significantly affected by the project extent, and includes 
Cost of preliminary studies 
 
• Site cost ...
Minimum clear door way - 32" 
Maximum size of egress door leaf - 48" Answer Minimum clear door way? 
Maximum size of egress door leaf? 
 
NPFA 701 Answer Flammability Standards/Vertical ignition Test 
What test/standard is used to test draperies and window treatment? 
 
NFPA 260 = CAL TB 117 
AS...
Preview 4 out of 56 pages
Add to cartMinimum clear door way - 32" 
Maximum size of egress door leaf - 48" Answer Minimum clear door way? 
Maximum size of egress door leaf? 
 
NPFA 701 Answer Flammability Standards/Vertical ignition Test 
What test/standard is used to test draperies and window treatment? 
 
NFPA 260 = CAL TB 117 
AS...
4 programming considerations Answer Form, Function, Economy, Time 
 
5 step programming process Answer 1. Goals (what does the client want to achieve and why?) 
2. Collect/analyze facts (what do we know? what is a given?) 
3. Uncover and test concepts (how does client want to achieve goals?) 
4. Det...
Preview 4 out of 57 pages
Add to cart4 programming considerations Answer Form, Function, Economy, Time 
 
5 step programming process Answer 1. Goals (what does the client want to achieve and why?) 
2. Collect/analyze facts (what do we know? what is a given?) 
3. Uncover and test concepts (how does client want to achieve goals?) 
4. Det...
The principal consideration in acoustic control in large spaces is the sound absorptive quality of the ________. Answer Ceiling 
[Noise reduction within a space: In larger rooms, ceiling treatment is most effective, while in smaller rooms, wall treatment is more effective.] 
 
These are part of the...
Preview 3 out of 16 pages
Add to cartThe principal consideration in acoustic control in large spaces is the sound absorptive quality of the ________. Answer Ceiling 
[Noise reduction within a space: In larger rooms, ceiling treatment is most effective, while in smaller rooms, wall treatment is more effective.] 
 
These are part of the...
Evaluate the materials with two light sources of different spectral character Answer What method would the designer use to evaluate materials and finishes for a project without knowledge of the building standard lighting temperature? 
 
Envelope Answer Which term refers to the entire enclosed area o...
Preview 2 out of 6 pages
Add to cartEvaluate the materials with two light sources of different spectral character Answer What method would the designer use to evaluate materials and finishes for a project without knowledge of the building standard lighting temperature? 
 
Envelope Answer Which term refers to the entire enclosed area o...
Which event triggers the issuance of a certificate of occupancy? 
A. Construction work is complete except for fire alarm testing. 
B. The contractor sends you a pay request for 100% complete work. 
C. The owner wants to move into part of the space before the rest is finished. 
D. The city inspector ...
Preview 2 out of 7 pages
Add to cartWhich event triggers the issuance of a certificate of occupancy? 
A. Construction work is complete except for fire alarm testing. 
B. The contractor sends you a pay request for 100% complete work. 
C. The owner wants to move into part of the space before the rest is finished. 
D. The city inspector ...
In wet areas, what are the requirements for wall finishes? Answer - walls within 2' or service sinks, toilets, or urinals are required to be constructed of moisture resistant material (cement board, X) and are required to have tile (or similar) finish up to minimum 4' AFF. Wallcovering may be used...
Preview 2 out of 15 pages
Add to cartIn wet areas, what are the requirements for wall finishes? Answer - walls within 2' or service sinks, toilets, or urinals are required to be constructed of moisture resistant material (cement board, X) and are required to have tile (or similar) finish up to minimum 4' AFF. Wallcovering may be used...
Which of the following is not true about layering? Answer allows for multiple consultants to collaborate on the drawing set 
 
Interior dimension strings should... Answer Have a dimension missing 
 
What would be the BEST scale to use to show a detail of a reveal for a full height millwork cabinet, ...
Preview 2 out of 6 pages
Add to cartWhich of the following is not true about layering? Answer allows for multiple consultants to collaborate on the drawing set 
 
Interior dimension strings should... Answer Have a dimension missing 
 
What would be the BEST scale to use to show a detail of a reveal for a full height millwork cabinet, ...
ASTM E648 Answer Testing of flame spread of flooring 
 
ASHRAE 90.1 Answer Standard for Energy efficiency of buildings 
 
CAL TB 133 Answer Full Seating Test - Actual sample of chair tested on flame 
 
ASTM 119 Answer FIRE TESTS FOR CONSTRUCTION ASSEMBLIES Fire tests of building construction and mat...
Preview 2 out of 5 pages
Add to cartASTM E648 Answer Testing of flame spread of flooring 
 
ASHRAE 90.1 Answer Standard for Energy efficiency of buildings 
 
CAL TB 133 Answer Full Seating Test - Actual sample of chair tested on flame 
 
ASTM 119 Answer FIRE TESTS FOR CONSTRUCTION ASSEMBLIES Fire tests of building construction and mat...
In which case would the number of people occupying a space NOT be critical to the programming effort? Answer the workroom of a commercial laundry 
 
In surveying existing conditions of an older building before beginning space planning, an interior designer would probably need to seek expert consulti...
Preview 2 out of 13 pages
Add to cartIn which case would the number of people occupying a space NOT be critical to the programming effort? Answer the workroom of a commercial laundry 
 
In surveying existing conditions of an older building before beginning space planning, an interior designer would probably need to seek expert consulti...
At what stage would a building analysis be conducted for an existing multi-story structure that is being renovated and converted from office use to school use? 
a. schematics b. master planning c. code analysis d. programming Answer programming 
 
which of the following is the MOST important conside...
Preview 2 out of 5 pages
Add to cartAt what stage would a building analysis be conducted for an existing multi-story structure that is being renovated and converted from office use to school use? 
a. schematics b. master planning c. code analysis d. programming Answer programming 
 
which of the following is the MOST important conside...
What is a Title and Index Sheet and what does it include? Answer The first sheet of a set of construction documents for large projects; may contain an index to drawing set, light of abbreviations and symbols, project data required by building department, and general notes. 
 
What sheets are include...
Preview 2 out of 8 pages
Add to cartWhat is a Title and Index Sheet and what does it include? Answer The first sheet of a set of construction documents for large projects; may contain an index to drawing set, light of abbreviations and symbols, project data required by building department, and general notes. 
 
What sheets are include...
NCIDQ Review - Construction questions with correct answers
Preview 1 out of 3 pages
Add to cartNCIDQ Review - Construction questions with correct answers
Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.
You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.
Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!
You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.
Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.
Stuvia is a marketplace, so you are not buying this document from us, but from seller cracker. Stuvia facilitates payment to the seller.
No, you only buy these notes for $45.99. You're not tied to anything after your purchase.
4.6 stars on Google & Trustpilot (+1000 reviews)
72042 documents were sold in the last 30 days
Founded in 2010, the go-to place to buy study notes for 14 years now