NERC Final Assessment Exam Correct answers (Already GRADED A)
- Exam (elaborations) • 98 pages • 2023
-
Available in package deal
-
- $11.99
- 1x sold
- + learn more
When using a dynamic schedule and the energy profile in an hour is >250 MW and the actual hourly integration deviates from the hourly energy profile by ____ the tag must be modified. 
A. 100 MW 
B. 10% 
C. 50 MW 
D. 25% 
B. 10% 
 
 
Dry steam plants, flash steam plants, and binary cycle power plants are the three main types of what kind of generating plant? 
A. Nuclear generators 
B. Combustion turbine generators 
C. Geothermal generators 
D. Hydroelectric generators 
C. Geothermal generators...
-
NERC TEST 200 Exam Questions and Answers Latest 2024/2025 (100% Verified)
- Exam (elaborations) • 54 pages • 2024
-
- $17.99
- + learn more
NERC TEST 200 Exam Questions and Answers Latest 2024/2025 (100% Verified) When system conditions are such that emergency procedures are expected to be 
implemented, which of the following actions should be considered first? 
a. Shed firm load 
b. Implement Active Load Management 
c. Return outaged equipment to service 
d. Request a voltage reduction - c. Return outaged equipment to service 
3. If your transmission path is rated for 1200 MW and 1000 MW are scheduled on 
it, but due to parallel fl...
-
NERC PREP Exam Questions and Answers Latest Updated 2024/2025 | 100% Correct
- Exam (elaborations) • 54 pages • 2024
-
- $16.49
- + learn more
If a 500 kV transmission line with a surge impedance loading of 800 MW is 
currently loaded at 1400 MW, which of the following events would most likely 
occur? 
a. Generator MVAR output would increase 
b. All system capacitors would trip off-line 
c. Generator MVAR output would decrease 
d. All automatic reactors would connect to the system - a. Generator MVAR output 
would increase 
2. When system conditions are such that emergency procedures are expected to be 
implemented, which of the follow...
-
NERC PREP TEST 101 Questions With Correct Answers
- Exam (elaborations) • 57 pages • 2024
- Available in package deal
-
- $13.49
- + learn more
1. If a 500 kV transmission line with a surge impedance loading of 800 MW is currently loaded at 1400 MW, which of the following events would most likely occur? 
 
a. Generator MVAR output would increase 
b. All system capacitors would trip off-line 
c. Generator MVAR output would decrease 
d. All automatic reactors would connect to the system - Answer a. Generator MVAR output would increase 
 
2. When system conditions are such that emergency procedures are expected to be implemented, which of ...
-
NERC PREP TEST 101 QUESTIONS AND ANSWERS (100% CORRECT SOLUTIONS)
- Exam (elaborations) • 73 pages • 2023
-
Available in package deal
-
- $11.49
- + learn more
1. If a 500 kV transmission line with a surge impedance loading of 800 MW is currently loaded at 1400 MW, which of the following events would most likely occur? 
 
a. Generator MVAR output would increase 
b. All system capacitors would trip off-line 
c. Generator MVAR output would decrease 
d. All automatic reactors would connect to the system 
a. Generator MVAR output would increase 
 
 
2. When system conditions are such that emergency procedures are expected to be implemented, which of the fo...
Too much month left at the end of the money?
-
Practice Test NERC Questions and Correct Answers (GRADED A+)
- Exam (elaborations) • 48 pages • 2023
-
Available in package deal
-
- $11.99
- + learn more
A transmission line is operating with a voltage phase angle different of 30 degrees between the sending Vs and the receiving bus Vr. If the receiving end load is suddenly increased, the voltage phase angle difference will be? 
The phase angle will increase. When load is increased phase angle will increase. 
 
 
A load has a power factor of 0.9 lagging. If the load draws 100 MVA, what is the MW draw? 
90 pf= mw/mva 
 
 
The high side of a delta-wye connection transformer is connected to a power s...
-
NERC book quiz Questions and Answers (100% Correct Elaborations)
- Exam (elaborations) • 29 pages • 2023
-
Available in package deal
-
- $10.49
- + learn more
You are an external BA with a frequency bais of 20 MW/.1 Hz that sees a frequency of 60.02 due to a large loss of load in the contingent BA. If your generator governor control systems responded to the frequency deviation approximately how much of a generation change would you BA experience? 
-4MW 
 
 
Net actual interchange minus Net scheduled interchange is what? 
Inadvertent interchange 
 
 
Suppose your interconnection operators at 59.97 Hz from one minute after midnight to noon and operate a...
-
SOS NERC Prep - RElIABILITY Exam| 200 QUESTIONS AND ANSWERS | GRADED A
- Exam (elaborations) • 109 pages • 2023
-
Available in package deal
-
- $11.99
- + learn more
The Reliability Coordinator just informed you of a slow time error correction which will begin at the top of the next hour. Your EMS system will not let you change your scheduled frequency. Your Frequency Bias Setting is -100 MW/.1Hz. What action should you take? 
 
A) Increase Net Interchange Schedule by 20 MWs. 
 
B) Inform the Reliability Coordinator that you cannot participate in the time error correction. 
 
C) Decrease Net Interchange Schedule by 20 MWs. 
 
D) Increase Net Interchange Sche...
-
Tennessee Cosmetology State Board 1 Exam 458 Questions with Verified Answers,100% CORRECT
- Exam (elaborations) • 40 pages • 2024
-
- $15.99
- + learn more
Tennessee Cosmetology State Board 1 Exam 458 Questions with Verified Answers 
 
Which cut holds less weight, layered or graduated? - CORRECT ANSWER layered 
 
Most people have become successful through what 3 aspects? - CORRECT ANSWER Self motivation, energy, and persistance 
 
How does extremely curly hair grow? - CORRECT ANSWER In long twisted sprials 
 
Wet hair with normal elasticity will stretch up to what percent? - CORRECT ANSWER 50% 
 
The technique used to free up the dominant cutting h...
-
NERC SOS quiz Questions and Answers (Already GRADED A)
- Exam (elaborations) • 60 pages • 2023
-
Available in package deal
-
- $11.49
- + learn more
If a Balancing Authority does not comply with the Control Performance Standard, the Balancing Authority is not permitted to provide which of the following for any other Balancing Authority entities? 
Regulation of other services related to control performance 
 
 
1. It is the obligation of each Balancing Authority to fulfill its commitment to the Interconnection and not ________ the other balancing Authorities in the Interconnection 
Burden 
 
 
A Balancing Authority is performing Overlap Regul...