Aggregate in concrete mix - Study guides, Class notes & Summaries
Looking for the best study guides, study notes and summaries about Aggregate in concrete mix? On this page you'll find 147 study documents about Aggregate in concrete mix.
All 147 results
Sort by
-
ACI Flatwork Exam All Possible Questions and Answers with complete solution
- Exam (elaborations) • 9 pages • 2024
- Available in package deal
-
- $7.99
- 2x sold
- + learn more
It is important that the ____________ __________ read and understand project specifications. - 
Answer-finisher foreman 
If the crew can place and finish 100 yd3 of concrete per hour, the producer's delivery rate should be 
about _____ yd3 per hour. - Answer-100 
Concrete is sold by the ton? - Answer-False 
Delays in discharging concrete trucks can result in the concrete being hard to: - Answer-pump, place, 
and finish 
When there is room for two concrete trucks ready to discharge into a pump ho...
-
CONCRETE BATCH PLANT OPERATOR EXAM (FDOT) | QUESTIONS & ANSWERS (VERIFIED) | LATEST UPDATE | GRADED A+
- Exam (elaborations) • 8 pages • 2024 Popular
-
- $11.49
- 1x sold
- + learn more
1 
CONCRETE BATCH PLANT OPERATOR 
EXAM (FDOT) | QUESTIONS & 
ANSWERS (VERIFIED) | LATEST 
UPDATE | GRADED A+ 
Stockpiles of aggregate shall be maintained in a well-drained condition in order to: 
Correct Answer: Minimize Free Water Content 
Coarse aggregate stockpiles must be sprinkled for at lest how many hours prior to batch 
for FDOT? 
Correct Answer: 24 
Free moisture of the aggregate means: 
Correct Answer: Moister on the surface of an aggregate that is above and beyond 
the absorbed m...
-
Michigan Builders License Exam Questions With Correct Answers
- Exam (elaborations) • 71 pages • 2023
- Available in package deal
-
- $13.49
- 6x sold
- + learn more
Created to serve as a complete, comprehensive code regulating the construction of single-family, two-family and buildings consisting of three or more townhouse units. - Answer IRC (International Residential Code) 
 
Administrative - Answer First 2 chapters of code book are 
 
True - Answer Plans or supporting documents are almost always required by the controlling authority prior to issuing a permit. T or F 
 
Yes - Answer Does the building official have the authority to render interpretations o...
-
CCIL EXAM | QUESTIONS & 100% CORRECT ANSWERS (VERIFIED) | LATEST UPDATE | GRADEA+
- Exam (elaborations) • 17 pages • 2024
- Available in package deal
-
- $11.49
- 1x sold
- + learn more
CCIL EXAM | QUESTIONS & 100% 
CORRECT ANSWERS (VERIFIED) | LATEST 
UPDATE | GRADEA+ 
Sampling from a mixer/truck agitator- Where is sample taken? 
Correct Answer: Between 10% and 90% (Not when testing with Super P) 
How is a sample taken when sampling plastic concrete? 
Correct Answer: Either pass a receptacle completely through a discharge stream OR 
divert a discharge stream completely into a sampling container. 
How many grab samples are needed when testing for uniformity of samples? 
Cor...
-
ICC Codes Exam Questions with Correct Answers.docx
- Exam (elaborations) • 7 pages • 2024
-
Available in package deal
-
- $13.59
- 1x sold
- + learn more
ICC Codes Exam Questions with Correct A 
 
Which of the following publications is most useful for a Special Inspector? - Answer-ACI 318 
 
A 	is a horizontal member that transfers loads laterally. - Answer-Beam 
 
Plain concrete refers to: - Answer-Concrete with less than the minimum amount of reinforcement 
 
Answer-Flexure, compression 
 
The best place to look up definitions in ACI 318-14 is: - Answer-Chapter 2 
 
Foundations cast at the same elevation as the soil grade are known as: - Answer...
Fear of missing out? Then don’t!
-
Nicet Highway Construction Level 2 Questions and Answers Already Passed
- Exam (elaborations) • 14 pages • 2023
-
Available in package deal
-
- $9.99
- 1x sold
- + learn more
Nicet Highway Construction Level 2 Questions and Answers Already Passed 
What are the 5 types of bridge abutments? Closed Abutment, Stub or Perched Abutment, Pedestal or Spill-through Abutment, Integral End Bents, Mechanically Stabilized Abutment 
What is a "closed abutment"? A closed abutment is a full-height wall with wing walls on each side that retains the full height of the approach embankment. This type of abutment minimizes the required span length of the bridge. 
What is a stub or perc...
-
Solution Manual For Corporate Finance 13th Edition By Stephen Ross Randolph Westerfield Jeffrey Jaffe.
- Exam (elaborations) • 435 pages • 2024
-
- $32.49
- 1x sold
- + learn more
Solution Manual For Corporate Finance 13th Edition By Stephen Ross Randolph Westerfield Jeffrey Jaffe. INTRODUCTION TO CORPORATE FINANCE 
SLIDES 
 
1.1 Chapter 1: Introduction to Corporate Finance 
1.2 Key Concepts and Skills 
1.3 Chapter Outline 
1.4 1.1 What Is Corporate Finance? 
1.5 The Balance Sheet Model of the Firm 
1.6 The Capital Budgeting Decision 
1.7 The Capital Structure Decision 
1.8 Short-Term Asset Management 
1.9 The Financial Manager 
1.10 Hypothetical Organization Chart 
1.11 ...
-
Michigan Builder 2 Residential Contractors License Study Exam|2023 LATEST UPDATE|GUARANTEED SUCCESS
- Exam (elaborations) • 13 pages • 2023
-
Available in package deal
-
- $12.49
- 1x sold
- + learn more
An attached garage shall be separated from all habitable rooms above the garage with not less than 
5/8 of an inch gypsum board 
 
 
 
A structure that is intended for swimming or recreational bathing is considered to be a swimming pool if it contains water over 
24 inches 
 
 
 
What type of fastener do you use to install cabinets? 
Truss head wood screws 
 
 
 
The process of preparing sand underneath a concrete slab requires sand to be 
Compacted 
 
 
 
Habitable space in a basement shall hav...
-
CSLB Concrete C8 License Practice Test #2 Already Passed
- Exam (elaborations) • 21 pages • 2023
-
Available in package deal
-
- $9.49
- 1x sold
- + learn more
CSLB Concrete C8 License Practice Test #2 Already Passed 
The maximum size of the conduit or pipe shall NOT exceed _______ of the thickness of the concrete. 1/3 
Which of the following tests for concrete is conducted at the site/field? Color Test 
Explanation: Rest of the above are laboratory tests. 
If the concrete compressive strength specified is less than 3600 psi, it has the option of being tested at 28 days and is able to accept the concrete if it attains ___________ percentage of the mini...
-
Az ROC Trade Exam B-3 License Correctly Solved Already Passed A+
- Exam (elaborations) • 35 pages • 2023
-
- $10.49
- 1x sold
- + learn more
Az ROC Trade Exam B-3 License Correctly Solved Already Passed A+ 
 
Nails used for installing Hardboard panel siding vertically must accommodate the sheathing and penetrate the framing a minimum of how much? *ANS* 1-1/2 inches 
 
When framing openings in floors with a header and trimmer joists, what maximum header joist span is allowed with a single member header? *ANS* 4 feet 
 
Above the handrail and below the head, what is the minimum clear opening on a stairwell? *ANS* 36 inches 
 
When inst...
Do you wonder why so many students wear nice clothes, have money to spare and enjoy tons of free time? Well, they sell on Stuvia! Imagine your study notes being downloaded a dozen times for $15 each. Every. Single. Day. Discover all about earning on Stuvia