Overhead crane - Study guides, Class notes & Summaries
Looking for the best study guides, study notes and summaries about Overhead crane? On this page you'll find 578 study documents about Overhead crane.
Page 4 out of 578 results
Sort by
-
Massachusetts 1B Hoisting License Exam Prep Questions And Answers Latest Updated 2024/2025 | Scored A+
- Exam (elaborations) • 16 pages • 2024
- Available in package deal
-
- $14.99
- 1x sold
- + learn more
Massachusetts 1B Hoisting License Exam Prep Questions And Answers Latest Updated 2024/2025 | Scored A+. manufacturer's specification: all hoisting machinery shall be operated 
in accor- dance with the: 
2. inoperable and secure: maintenance repair and refueling shall be done 
when the machine is: 
3. daily: visual inspection shall be made of wire ropes, bearings, 
gears, friction clutches, brakes, chain drives and other parts subject to wear on all 
hoisting machinery to ens...
-
NCCCO Overhead Crane Exam Questions Marking Scheme New Update (A+ Pass)
- Exam (elaborations) • 8 pages • 2024
-
- $10.99
- + learn more
NCCCO Overhead Crane Exam Questions Marking Scheme New Update (A+ Pass) 
 
Overhead cranes with more than one hoisting unit shall have? - Answers -Its rated load marked on it. 
 
How often does O.S.H.A. require a written wire rope inspection? - Answers -Once a month 
 
What is the purpose of the "E" (Emergency) stop on an overhead crane? - Answers -Removes power to entire crane. 
 
Most loads should be rigged to within how many degrees of level? - Answers -5 
 
According to ASME B30.2, what is...
-
NCCCO Overhead Crane Exam Questions with 100% Verified Correct Answers Rated A+
- Exam (elaborations) • 10 pages • 2024
- Available in package deal
-
- $10.49
- + learn more
NCCCO Overhead Crane Exam Questions with 100% Verified Correct Answers Rated A+ 
Overhead cranes with more than one hoisting unit shall have what? - Correct Answer its rated load marked on it 
 
What is the purpose of the "E" (Emergency) stop on an overhead crane? - Correct Answer removes power to entire crane 
 
How often does O.S.H.A. require a written wire rope inspection? - Correct Answer once a month 
 
Most loads should be rigged to within how many degrees of level? - Correct Answer five...
-
Overhead Crane Test Questions and Answers
- Exam (elaborations) • 7 pages • 2024
-
- $10.99
- + learn more
Overhead Crane Test Questions and Answers
-
NCCCO OVERHEAD CRANE EXAM 2023-2024 ACTUAL EXAM 100 QUESTIONS AND CORRECT DETAILED ANSWERS (VERIFIED ANSWERS) |ALREADY GRADED A
- Exam (elaborations) • 15 pages • 2023
-
- $25.49
- + learn more
NCCCO OVERHEAD CRANE EXAM ACTUAL EXAM 100 QUESTIONS AND CORRECT DETAILED ANSWERS (VERIFIED ANSWERS) |ALREADY GRADED A
Make study stress less painful
-
NCCCO OVERHEAD CRANE EXAM (ACTUAL) 2024 QUESTIONS AND ANSWERS
- Exam (elaborations) • 15 pages • 2024
-
Available in package deal
-
- $12.99
- + learn more
NCCCO OVERHEAD CRANE EXAM (ACTUAL) 2024 QUESTIONS AND ANSWERS
-
Module 6 NCCER into to Basic rigging questions with correct answers
- Exam (elaborations) • 6 pages • 2023
-
- $7.99
- 9x sold
- + learn more
During a rigging operation if an emergency happens who has the authority to give the emergency stop hand signal? CORRECT ANSWER (Anyone on the ground who is in sight of the crane operator). 
 
The recommendation when lifting a load longer then __________ is to use two choker hitches. CORRECT ANSWER (12 feet) 
 
A hand-operated winching device that should never be used for vertical overhead lifting is a (CORRECT ANSWER come-along 
 
All chain hoists use a ____________ to lift heavy loads. CORRECT...
-
NCCCO Overhead Crane Questions With Complete Solutions
- Exam (elaborations) • 12 pages • 2023
-
Available in package deal
-
- $10.99
- + learn more
NCCCO Overhead Crane Questions With Complete Solutions
-
NCCCO Overhead Crane questions with correct answers
- Exam (elaborations) • 7 pages • 2023
-
- $8.99
- + learn more
NCCCO Overhead Crane questions with correct answers 
Overhead cranes with more than one hoisting unit shall have? - Answer Its rated load marked on it. How often does O.S.H.A. require a written wire rope inspection? - Answer Once a month What is the purpose of the "E" (Emergency) stop on an overhead crane? - Answer Removes power to entire crane. Most loads should be rigged to within how many degrees of level? - Answer 5 According to ASME B30.2, what is the safety factor for rigging? - Answer 5...
-
Overhead Crane Test questions with correct answers.
- Exam (elaborations) • 8 pages • 2024
-
- $10.49
- + learn more
its rated load marked on it - ANSWER - Overhead cranes with more than one hoisting unit shall have what? 
 
removes power to entire crane - ANSWER - What is the purpose of the "E" (Emergency) stop on an overhead crane? 
 
once a month - ANSWER - How often does O.S.H.A. require a written wire rope inspection? 
 
five - ANSWER - Most loads should be rigged to within how many degrees of level? 
 
5 to 1 - ANSWER - According to ASME B30.2, what is the safety factor for rigging? 
 
d...
Study stress? For sellers on Stuvia, these are actually golden times. KA-CHING! Earn from your study resources too and start uploading now. Discover all about earning on Stuvia