Contingency reserve - Study guides, Class notes & Summaries

Looking for the best study guides, study notes and summaries about Contingency reserve? On this page you'll find 525 study documents about Contingency reserve.

Page 4 out of 525 results

Sort by

KNOWN NERC EXAM QUESTIONS: From Class Completely Solved!!
  • KNOWN NERC EXAM QUESTIONS: From Class Completely Solved!!

  • Exam (elaborations) • 7 pages • 2024
  • A Balancing Authority notices that Operating Reserve has steadily declined throughout the hour. What is the most likely cause? a) Loss of a large generator in the area b) An inaccurate load forecast c) Loss of a major transmission line d) A malfunction of EMS - ANSWER b) An inaccurate load forecast Balancing Area A notices that the Interconnection frequency is 59.94 Hz and their ACE is 0. Which of the following could be the cause of this reading? a) A net under-generation in Balancin...
    (0)
  • $10.99
  • + learn more
NERC RC Exam questions with correct answers
  • NERC RC Exam questions with correct answers

  • Exam (elaborations) • 11 pages • 2023
  • Available in package deal
  • Common standard time period for station battery to handle outage of AC power to chargers CORRECT ANSWER 8-12 hours Time to restore data exchange redundancy when redundancy testing by RC/TOP/BA deemed unsuccessful CORRECT ANSWER 2 hours Transition period to backup control facility (fully functioning) CORRECT ANSWER 2 hours Annual testing of backup control facility must prove to be functional for this long CORRECT ANSWER 2 hours Every 2 years TO/TOP/DSP must provide how many hours of s...
    (0)
  • $13.49
  • + learn more
NERC EXAM QUESTIONS AND CORRECT ANSWERS
  • NERC EXAM QUESTIONS AND CORRECT ANSWERS

  • Exam (elaborations) • 10 pages • 2023
  • Available in package deal
  • A Balancing Authority notices that Operating Reserve has steadily declined throughout the hour. What is the most likely cause? a) Loss of a large generator in the area b) An inaccurate load forecast c) Loss of a major transmission line d) A malfunction of EMS - b) An inaccurate load forecast Balancing Area A notices that the Interconnection frequency is 59.94 Hz and their ACE is 0. Which of the following could be the cause of this reading? a) A net under-generation in Balancing Area A b...
    (0)
  • $7.49
  • + learn more
KNOWN NERC EXAM QUESTIONS AND ANSWERS ALL ACCURATE SOLN  2024
  • KNOWN NERC EXAM QUESTIONS AND ANSWERS ALL ACCURATE SOLN 2024

  • Exam (elaborations) • 11 pages • 2024
  • KNOWN NERC EXAM QUESTIONS AND ANSWERS ALL ACCURATE SOLN 2024 A Balancing Authority notices that Operating Reserve has steadily declined throughout the hour. What is the most likely cause? a) Loss of a large generator in the area b) An inaccurate load forecast c) Loss of a major transmission line d) A malfunction of EMS - Correct Ans->b) An inaccurate load forecast Balancing Area A notices that the Interconnection frequency is 59.94 Hz and their ACE is 0. Which of the following cou...
    (0)
  • $12.99
  • + learn more
PJM Transmission Exam Study Guide | Questions with 100% Correct Answers | Verified| Latest Updated 2024.
  • PJM Transmission Exam Study Guide | Questions with 100% Correct Answers | Verified| Latest Updated 2024.

  • Exam (elaborations) • 39 pages • 2024
  • PJM Transmission Exam Study Guide | Questions with 100% Correct Answers | Verified| Latest Updated 2024. During System Restoration, what is the optimal Frequency Range? 59.75 - 61 Hz The 500 kV system has normal bus voltages between? 500 to 550 kVRead More When Connecting 2 islands, the operator must match? Voltage, Phase Angle and Frequency What are the Minimum Source Requirements for a 500kV line? (Gen/mile and load/mile) 30 MW Gen/mile of energized 500 kV and 20 MW Load/mile of energi...
    (0)
  • $13.99
  • + learn more
NERC EXAM| FINAL ASSESSMENT| 317 QUESTIONS| 52 PAGES COMPLETE SOLUTIONS 100% CORRECT ANSWERS|
  • NERC EXAM| FINAL ASSESSMENT| 317 QUESTIONS| 52 PAGES COMPLETE SOLUTIONS 100% CORRECT ANSWERS|

  • Exam (elaborations) • 54 pages • 2023
  • NERC EXAM| FINAL ASSESSMENT| 317 QUESTIONS| 52 PAGES COMPLETE SOLUTIONS 100% CORRECT ANSWERS| When using a dynamic schedule and the energy profile in an hour is >250 MW and the actual hourly integration deviates from the hourly energy profile by ____ the tag must be modified. A. 100 MW B. 10% C. 50 MW D. 25% Correct Answer B. 10% Dry steam plants, flash steam plants, and binary cycle power plants are the three main types of what kind of generating plant? A. Nuclear generators B. C...
    (0)
  • $10.08
  • + learn more
NERC RC BAL-001 questions with correct answers
  • NERC RC BAL-001 questions with correct answers

  • Exam (elaborations) • 4 pages • 2023
  • Available in package deal
  • System Frequency Rule of Thumb CORRECT ANSWER 1% change in frequency leads to 2% change in MW load Each BA shall operate resources to provide for a level of operating reserve sufficient to account for? CORRECT ANSWER Frequency Support Errors in load forecasting generation loss transmission unavailability regulating requirements What is 'Sufficient Operating Reserves' ? CORRECT ANSWER Capacity required to meet the CPS & DCS 'Operating Reserve' CORRECT ANSWER Capability above Firm...
    (0)
  • $13.99
  • + learn more
PJM Transmission Exam Study Guide | Questions with 100% Correct Answers | Verified| Latest Updated 2024.
  • PJM Transmission Exam Study Guide | Questions with 100% Correct Answers | Verified| Latest Updated 2024.

  • Exam (elaborations) • 39 pages • 2024
  • PJM Transmission Exam Study Guide | Questions with 100% Correct Answers | Verified| Latest Updated 2024. During System Restoration, what is the optimal Frequency Range? 59.75 - 61 Hz The 500 kV system has normal bus voltages between? 500 to 550 kVRead More When Connecting 2 islands, the operator must match? Voltage, Phase Angle and Frequency What are the Minimum Source Requirements for a 500kV line? (Gen/mile and load/mile) 30 MW Gen/mile of energized 500 kV and 20 MW Load/mile of energi...
    (0)
  • $12.99
  • + learn more
NERC text 130 questions with complete solutions Graded A+
  • NERC text 130 questions with complete solutions Graded A+

  • Exam (elaborations) • 33 pages • 2023
  • NERC text 130 questions with complete solutions Graded A+ Operating reserve may be provided by which of the following? A. LTCs B. Capacitor banks C. Voltage regulators D. Interruptible loads -AnswerD. Interruptible loads Which of the following is the responsibility of a reserve sharing group (RSG)? A. Complying with DCS as if it was a single control area B. Proving regulation service for neighboring RSGs C. Ensuring each control area in the group maintains 50% blackstart capability ...
    (0)
  • $9.49
  • + learn more
PJM Transmission Exam Study Guide | Questions with 100% Correct Answers | Verified| Latest Updated 2024.
  • PJM Transmission Exam Study Guide | Questions with 100% Correct Answers | Verified| Latest Updated 2024.

  • Exam (elaborations) • 39 pages • 2024
  • PJM Transmission Exam Study Guide | Questions with 100% Correct Answers | Verified| Latest Updated 2024. During System Restoration, what is the optimal Frequency Range? 59.75 - 61 Hz The 500 kV system has normal bus voltages between? 500 to 550 kVRead More When Connecting 2 islands, the operator must match? Voltage, Phase Angle and Frequency What are the Minimum Source Requirements for a 500kV line? (Gen/mile and load/mile) 30 MW Gen/mile of energized 500 kV and 20 MW Load/mile of energi...
    (0)
  • $12.99
  • + learn more