Pjm generator operator - Study guides, Class notes & Summaries
Looking for the best study guides, study notes and summaries about Pjm generator operator? On this page you'll find 33 study documents about Pjm generator operator.
Page 3 out of 33 results
Sort by
-
PJM Exam Questions & Answers 2024
- Exam (elaborations) • 14 pages • 2024
-
Available in package deal
-
- $8.99
- + learn more
PJM Exam Questions & Answers 2024 
 
 
What is the threshold for having a satellite phone? - ANSWER-500 MW 
 
How often is reactive testing completed? - ANSWER-5 years 
 
Which of the following would NOT be a cause for a sudden deviation in the balancing area ACE? 
 
1) Incorrect interchange number 
2) Loss of a tie-line RTU 
3) Loss of internal load 
4) Loss of adjacent control area generation - ANSWER-Loss of adjacent control area generation 
 
PJM should be made aware of any fuel shortage tha...
-
PJM Exam Questions and Answers
- Exam (elaborations) • 16 pages • 2024
- Available in package deal
-
- $12.49
- + learn more
PJM Exam Questions and Answers 
What is the threshold for having a satellite phone? - Correct Answer ️️ -500 MW 
How often is reactive testing completed? - Correct Answer ️️ -5 years 
Which of the following would NOT be a cause for a sudden deviation in the balancing 
area ACE? 
1) Incorrect interchange number 
2) Loss of a tie-line RTU 
3) Loss of internal load 
4) Loss of adjacent control area generation - Correct Answer ️️ -Loss of adjacent 
control area generation 
PJM should be ...
-
PJM Exam Questions and Answers
- Exam (elaborations) • 16 pages • 2024
-
- $12.49
- + learn more
PJM Exam Questions and Answers 
What is the threshold for having a satellite phone? - Correct Answer ️️ -500 MW 
How often is reactive testing completed? - Correct Answer ️️ -5 years 
Which of the following would NOT be a cause for a sudden deviation in the balancing 
area ACE? 
1) Incorrect interchange number 
2) Loss of a tie-line RTU 
3) Loss of internal load 
4) Loss of adjacent control area generation - Correct Answer ️️ -Loss of adjacent 
control area generation 
PJM should be ...
-
PJM Transmission Exam Study Questions & Correct Answers | Latest Update |Already Graded A+PJM Transmission Exam Study Questions & Correct Answers | Latest Update |Already Graded A+
- Exam (elaborations) • 46 pages • 2024
-
- $13.29
- + learn more
During System Restoration, what is the optimal Frequency Range? 
: 59.75 - 61 Hz 
The 500 kV system has normal bus voltages between? 
: 500 to 550 kV 
When Connecting 2 islands, the operator must match? 
: Voltage, Phase Angle and Frequency 
What are the Minimum Source Requirements for a 500kV line? (Gen/mile and load/mile) 
: 30 MW Gen/mile of energized 500 kV and 20 MW Load/mile of energized 500 kV 
When will PJM issue a Minimum Generation Alert? (how many MW under normal 
operating limits) 
...
-
PJM Transmission Exam Study Guide | Questions with 100% Correct Answers
- Exam (elaborations) • 29 pages • 2024
-
- $12.99
- + learn more
PJM Transmission Exam Study Guide | Questions with 100% Correct Answers 
During System Restoration, what is the optimal Frequency Range? ANS-59.75 - 61 Hz 
 
The 500 kV system has normal bus voltages between? ANS-500 to 550 kV 
 
When Connecting 2 islands, the operator must match? ANS-Voltage, Phase Angle and Frequency 
 
What are the Minimum Source Requirements for a 500kV line? (Gen/mile and load/mile) ANS-30 MW Gen/mile of energized 500 kV and 20 MW Load/mile of energized 500 kV 
 
When will ...
Want to regain your expenses?
-
An EXCITER on a traditional generator does what? - correct answer Voltage regulation (AVR) if you change the excitation current, you change the voltage. ECO Min, ECO Max, and EMERG Max are genrator _________________. - correct answer Limits When syn
- Exam (elaborations) • 4 pages • 2024
-
- $16.49
- + learn more
If the scheduled frequency must be adjusted for a time error correction, what would the PJM operator set the frequency schedule to for a fast clock? - correct answer 59.98 
 
What is the PJM regulation requirement for the off-peak period? - correct answer 525 
 
Which of the following PJM reserves are NOT synchronized? - correct answer Non-synchronized (quick-start) 
 
What is the margin in relationship to regulation requirement that is used by PJM for assigning or de-assigning regulation?...
-
PJM Sample Test Review | 150 Questions with 100% Correct Answers | Verified
- Exam (elaborations) • 15 pages • 2024
-
- $12.99
- + learn more
PJM Sample Test Review | 150 Questions with 100% Correct Answers | Verified | Latest Update 2024 
Real time transmission constraints or contingencies may be alleviated with generators operating ______________ ANS-off cost out of merit. 
 
Monitoring ___________ may give insights into system constraints. ANS-Monitoring LMP's 
 
PJM calls for _____________ reserves to recover ace so that tie line schedules are maintained. ANS-PJM calls on synchronized reserves 
 
If not cancelled by PJM, the mini...
-
PJM Sample Test Review Revision And Correct Answers.
- Exam (elaborations) • 15 pages • 2024
-
Available in package deal
-
- $12.99
- + learn more
Real time transmission constraints or contingencies may be alleviated with generators operating ______________ - correct answer off cost out of merit. 
 
Monitoring ___________ may give insights into system constraints. - correct answer Monitoring LMP's 
 
PJM calls for _____________ reserves to recover ace so that tie line schedules are maintained. - correct answer PJM calls on synchronized reserves 
 
If not cancelled by PJM, the minimum generation alert expires at the end of the specified __...
-
PJM Generation Dispatcher Sample Exam Questions and Answers
- Exam (elaborations) • 12 pages • 2024
-
- $12.49
- + learn more
PJM Generation Dispatcher Sample 
Exam Questions and Answers 
Real time transmission constraints or contingencies may be alleviated with generators 
operating : 
A. below 60 hertz 
B. on a new price curve 
C. on a new cost curve 
D. off cost ( out of merit) - Correct Answer ️️ -D. off cost ( out of merit ) 
Monitoring LMP may give insights into : 
A. system constraints 
B. system voltage 
C. system frefuency 
D. time error - Correct Answer ️️ -A. system constraints 
PJM calls for which o...
-
PJM Generator Exam Questions and Answers
- Exam (elaborations) • 7 pages • 2024
-
- $11.49
- + learn more
PJM Generator Exam Questions and Answers 
The purpose of the Deploy All Resources Action is to instruct all generating resources 
to be on line and at full output _________ - Correct Answer ️️ -immediately upon 
receipt of dispatch instruction 
A Heavy Load Voltage Schedule Warning has been issued for the PJM RTO. 
Generation Operators should: - Correct Answer ️️ -Ensure all unit voltage regulators 
are in service 
PJM can issue the Deploy All Resources Action for________ - Correct Answe...
How much did you already spend on Stuvia? Imagine there are plenty more of you out there paying for study notes, but this time YOU are the seller. Ka-ching! Discover all about earning on Stuvia