Nec nfpa 70 - Study guides, Class notes & Summaries

Looking for the best study guides, study notes and summaries about Nec nfpa 70? On this page you'll find 48 study documents about Nec nfpa 70.

Page 3 out of 48 results

Sort by

NICET 1 Rev 01 Written Exam Questions & Answers.
  • NICET 1 Rev 01 Written Exam Questions & Answers.

  • Exam (elaborations) • 80 pages • 2024
  • NICET 1 Rev 01 Written Exam Questions & Answers. "A. As Built Drawings Hint: NFPA 72 - 14.6.1.1 - KEY: records sub testing, inspection and maintenance NOTE: As built drawings are drawings of record per A.7.7.2.3 - CORRECT ANSWER " "After acceptance testing, what type of drawings are required to be presented to the building owner? A. As Built Drawings B. Contract Drawings C. Point-To-Point Diagrams D. Manufacturer's Drawings " "C. 3 Hint: NFPA 72 - 10.6.11.6.3 - KEY: fuel - CO...
    (0)
  • $12.49
  • + learn more
NETA level 2 exam final exam 2024  updated
  • NETA level 2 exam final exam 2024 updated

  • Exam (elaborations) • 22 pages • 2024
  • Available in package deal
  • NETA level 2 exam final exam 2024 updated What is the preferred method of performing primary-injection testing on a low voltage circuit breaker with ground fault protection? - CORRECT ANSWER-Use of the manufacturer's test kit or rewiring the neutral CT input is the preferred method of primary-injection testing on a low voltage circuit breaker with ground fault protection, otherwise two poles can be connected in series to provide balanced secondary currents to the trip unit. At wha...
    (0)
  • $15.99
  • + learn more
ELMC Master Electrician Code 251-275 Complete Questions And Answers
  • ELMC Master Electrician Code 251-275 Complete Questions And Answers

  • Exam (elaborations) • 5 pages • 2023
  • ELMC Master Electrician Code 251-275 Complete Questions And Answers What is the MAXIMUM allowable voltage that conductors within electrical nonmetallic tubing (ENT) may carry? a. 1000 b. 2000 c. 600 d. 240 Correct Answer: 1000 NFPA 70 : NEC 2017 : 300.2, 362.1 Unprotected cable is to be installed in holes bored in wood studs. Each hole shall be bored so that the edge of the hole is what minimum distance for the edge of the stud? a. 2 b. 1 c. 1-1/2 d. 1-1/4 Correct Answer: 1-1/4 ...
    (0)
  • $10.49
  • + learn more
NETA LEVEL II EXAM QUESTIONS CORRECTLY ANSWERED 2024.
  • NETA LEVEL II EXAM QUESTIONS CORRECTLY ANSWERED 2024.

  • Exam (elaborations) • 28 pages • 2024
  • NETA LEVEL II EXAM QUESTIONS CORRECTLY ANSWERED 2024. What is the preferred method of performing primary-injection testing on a low voltage circuit breaker with ground fault protection? Use of the manufacturer's test kit or rewiring the neutral CT input is the preferred method of primary-injection testing on a low voltage circuit breaker with ground fault protection, otherwise two poles can be connected in series to provide balanced secondary currents to the trip unit. At what current le...
    (0)
  • $9.99
  • + learn more
Motor Calculations Annotated Instructor’s Guide_ME_Level-4
  • Motor Calculations Annotated Instructor’s Guide_ME_Level-4

  • Exam (elaborations) • 38 pages • 2024
  • COMPTENCIES, OBJECTIVES, AND PERFORMANCE TASKS Power Generation Maintenance Electrician Level Four Power Industry Fundamentals Power Generation Maintenance Electrician Level Two 26410-08 Motor Operation and Maintenance 26301-08 Load Calculations – Branch and Feeder Circuits 32401-09 Preventive and Predictive Maintenance 26409-08 Heat Tracing and Freeze Protection 40401-09 Standby and Emergency Systems 26407-08 Advanced Controls 26305-08 Overcurrent Protection 50401-10 Gene...
    (0)
  • $10.49
  • + learn more
NETA LEVEL II EXAM QUESTIONS CORRECTLY ANSWERED 2024.
  • NETA LEVEL II EXAM QUESTIONS CORRECTLY ANSWERED 2024.

  • Exam (elaborations) • 28 pages • 2024
  • NETA LEVEL II EXAM QUESTIONS CORRECTLY ANSWERED 2024. What is the preferred method of performing primary-injection testing on a low voltage circuit breaker with ground fault protection? Use of the manufacturer's test kit or rewiring the neutral CT input is the preferred method of primary-injection testing on a low voltage circuit breaker with ground fault protection, otherwise two poles can be connected in series to provide balanced secondary currents to the trip unit. At what current le...
    (0)
  • $9.99
  • + learn more
NICET LEVEL 1 INSTALLING QUESTIONS AND ANSWERS WITH VERIFIED SOLUTIONS
  • NICET LEVEL 1 INSTALLING QUESTIONS AND ANSWERS WITH VERIFIED SOLUTIONS

  • Exam (elaborations) • 10 pages • 2023
  • NICET LEVEL 1 INSTALLING QUESTIONS AND ANSWERS WITH VERIFIED SOLUTIONS The maximum number of 14AWG wires that can be pulled straight through a 4" X 2 1/8" square trade size metal electrical box is? 15 (NFPA 70 Table 314.16(A)) What is the first process or step you must take when working on a panel supplied with 120VAC? Lock out and Tag out the power source If power supplies are located remotely from the FACP, where shall their locations be posted? Fire alarm control panel (NFPA 72 10.6.8.2)...
    (0)
  • $9.99
  • + learn more
NICET LEVEL 1  EXAM 2023 WITH 100% CORRECT ANSWERS
  • NICET LEVEL 1 EXAM 2023 WITH 100% CORRECT ANSWERS

  • Exam (elaborations) • 6 pages • 2023
  • The maximum number of 14AWG wires that can be pulled straight through a 4" X 2 1/8" square trade size metal electrical box is? 15 (NFPA 70 Table 314.16(A)) What is the first process or step you must take when working on a panel supplied with 120VAC? Lock out and Tag out the power source If power supplies are located remotely from the FACP, where shall their locations be posted? Fire alarm control panel (NFPA 72 10.6.8.2) _______ 90 degree bends are permitted in an EMT r...
    (0)
  • $16.49
  • + learn more
NFPA 70 NEC 2024 With 100% Correct And Verified Answers
  • NFPA 70 NEC 2024 With 100% Correct And Verified Answers

  • Exam (elaborations) • 3 pages • 2024
  • NFPA 70 NEC 2024 With 100% Correct And Verified Answers
    (0)
  • $10.99
  • + learn more
Master Electrician PREP  QUESTIONS WITH ANSWERS
  • Master Electrician PREP QUESTIONS WITH ANSWERS

  • Exam (elaborations) • 7 pages • 2024
  • Master Electrician PREP QUESTIONS WITH ANSWERS where passing through a floor, cables shall be protected from physical damage at what distance above the floor? a. 10 inches b. 6 inches c. 12 inches d. 8 inches - ANSWER 6 inches NFPA 70 : NEC 2011 : 334.15.B A company has an electrical contractors license. The Master Electrician decides to leave the company. How many days does the company (licensee) have to notify the division? a. 30 days b. 10 days c. 20 days d. 5 days - ANSWER...
    (0)
  • $12.99
  • + learn more