Lare section 4 Study guides, Class notes & Summaries

Looking for the best study guides, study notes and summaries about Lare section 4? On this page you'll find 71 study documents about Lare section 4.

Page 3 out of 71 results

Sort by

LARE Section 4 Exam Questions & Answers Accurate 100%
  • LARE Section 4 Exam Questions & Answers Accurate 100%

  • Exam (elaborations) • 17 pages • 2023
  • Available in package deal
  • Wheelchair Side Reach - Answer 4' max Wheelchair Front Reach - Answer 4'-6" max Wheelchair Table Top - Answer 2'-6" min Wheelchair Table Reach - Answer 2'-1" max Max. Ramp runs before a landing - Answer 30' for ramps 1:12 - 1:16 40' for ramps 1:16 - 1:20 Accessible Parking Dims - Answer 8' min space, 5' access min. (8' for vans), 3' accessible route Typ Parking Space Dims - Answer 9' wide x 20' long 9' x 22' (parallel) Drop off Dims - Answer 60" wide/deep...
    (0)
  • $11.49
  • + learn more
LARE Section 4 question and answers rated A+ 2023
  • LARE Section 4 question and answers rated A+ 2023

  • Exam (elaborations) • 17 pages • 2023
  • LARE Section 4 question and answers rated A+ 2023Advantages of asphalt paving - correct answer Low installation cost Low reflectivity Low maintenance cost Disadvantages of asphalt paving - correct answer Propensity to erode at edges Susceptibility to frost damage Aggregate in concrete mix, diameter not to exceed: - correct answer 1/3 slab thickness Borrow Pit Method (grading) - correct answer Also known as Grid Method, used to calculate cut/fill quantities. Entails laying out a grid ...
    (0)
  • $12.99
  • + learn more
LARE SECTION 4 question & answers rated A+ 2023 already passed
  • LARE SECTION 4 question & answers rated A+ 2023 already passed

  • Exam (elaborations) • 93 pages • 2023
  • LARE SECTION 4 question & answers rated A+ 2023 already passedWhat is Thermal Attenuation? - correct answer The removal of heat pollution from stoma water from the water infiltrating into the subsurface Runoff from impervious surfaces often pick sup heat from these surfaces. What is the Rational Method Formula and what is it used for? - correct answer Q=Cia (Q=cia/360) Q= quantity of runoff (flow) in cubic feet per second C= runoff coefficient I = intensity of rainfall in inches per h...
    (0)
  • $24.49
  • + learn more
LARE Section 4: Materials QUESTIONS & Answers 100% verified!
  • LARE Section 4: Materials QUESTIONS & Answers 100% verified!

  • Exam (elaborations) • 6 pages • 2023
  • LARE Section 4: Materials QUESTIONS & AnswCarriage Bolt - ANSWERbolt with nut and washer. Requires a square hole in a metal plate to keep the head from turning. Round head is snag free with clean appearance. A fastener with smooth exposed end of bolt. Used in security fixtures, furnitures, and joining wood to wood. Eye Bolt - ANSWERBolt used to attach wire onto J-Bolt - ANSWERUsed in Structural applications such as securing walls to concrete foundations L-Shaped Anchor Bolt Assembly -...
    (0)
  • $10.99
  • + learn more
LARE section 4: Project and Construction Administration Practice Test with Complete Solutions!
  • LARE section 4: Project and Construction Administration Practice Test with Complete Solutions!

  • Exam (elaborations) • 6 pages • 2023
  • LARE section 4: Project and Construction Administration Practice Test with Complete Solutions! 1.) During the course of construction, the landscape architect discovers an error in the construction that may cause a portion of the project used by the public to fail. The landscape architect informs the client, but the client refuses to allow corrections to be made. The landscape architect should do which of the following? I. Report the problem to the appropriate building official. II. Report...
    (0)
  • $10.49
  • + learn more
LARE SECTION 4: PROJECT & CONSTRUCTION ADMINISTRATION PRACTICE TEST QUESTIONS AND ANSWERS WITH SOLUTIONS 2024
  • LARE SECTION 4: PROJECT & CONSTRUCTION ADMINISTRATION PRACTICE TEST QUESTIONS AND ANSWERS WITH SOLUTIONS 2024

  • Exam (elaborations) • 9 pages • 2024
  • Available in package deal
  • LARE SECTION 4: PROJECT & CONSTRUCTION ADMINISTRATION PRACTICE TEST QUESTIONS AND ANSWERS WITH SOLUTIONS 2024
    (0)
  • $13.49
  • + learn more
LARE Section 4 Landscape Architecture Professional Licensing Exam 2023 Correct 100%
  • LARE Section 4 Landscape Architecture Professional Licensing Exam 2023 Correct 100%

  • Exam (elaborations) • 25 pages • 2023
  • Difference between proposed and existing contours - Answer Existing are thin and dashed proposed are thicker and solid - Answer How is the flow line at the bottom of a pipe indicated? - Answer By a spot elevation Which direction to swale and drainage ditch contours point? - Answer Uphill Which direction do contour lines point along a ridge or crown of a road? - Answer Downhill At which end of a drainage pipe should you indicate an invert elevation? - Answer Both The HPS must ...
    (0)
  • $11.49
  • + learn more
LARE section 4 Project & Construction Administration Practice Test Solved 100%
  • LARE section 4 Project & Construction Administration Practice Test Solved 100%

  • Exam (elaborations) • 9 pages • 2023
  • Available in package deal
  • 1.) During the course of construction, the landscape architect discovers an error in the construction that may cause a portion of the project used by the public to fail. The landscape architect informs the client, but the client refuses to allow corrections to be made. The landscape architect should do which of the following? I. Report the problem to the appropriate building official. II. Report the issue to the state [provincial] licensing board. III. Refuse to go along with the client's de...
    (0)
  • $10.49
  • + learn more
LARE Section 4 Exam Questions With Verified Answers
  • LARE Section 4 Exam Questions With Verified Answers

  • Exam (elaborations) • 17 pages • 2023
  • Advantages of asphalt paving - Answer Low installation cost Low reflectivity Low maintenance cost Disadvantages of asphalt paving - Answer Propensity to erode at edges Susceptibility to frost damage Aggregate in concrete mix, diameter not to exceed: - Answer 1/3 slab thickness Borrow Pit Method (grading) - Answer Also known as Grid Method, used to calculate cut/fill quantities. Entails laying out a grid across a construction site, and assigning an elevation to each point on a grid. F...
    (0)
  • $11.49
  • + learn more
LARE Section 4 Questions & Answers 100% accurate
  • LARE Section 4 Questions & Answers 100% accurate

  • Exam (elaborations) • 13 pages • 2023
  • Available in package deal
  • LARE Section 4 Questions & Answers 100% accurate LARE Section 4 Questions & Answers 100% accurate LARE Section 4 Questions & Answers 100% accurate LARE Section 4 Questions & Answers 100% accurate LARE Section 4 Questions & Answers 100% accurate LARE Section 4 Questions & Answers 100% accurate LARE Section 4 Questions & Answers 100% accurate LARE Section 4 Questions & Answers 100% accurate LARE Section 4 Questions & Answers 100% accurate LARE Section 4 Questions & Answe...
    (0)
  • $10.49
  • + learn more