Fdny test 2 - Study guides, Class notes & Summaries

Looking for the best study guides, study notes and summaries about Fdny test 2? On this page you'll find 207 study documents about Fdny test 2.

Page 3 out of 207 results

Sort by

S-12 CITYWIDE SPRINKLER SYSTEMS, S12 Sprinkler Test Questions and answers Latest Updated 2024 (SOLVED 100%)
  • S-12 CITYWIDE SPRINKLER SYSTEMS, S12 Sprinkler Test Questions and answers Latest Updated 2024 (SOLVED 100%)

  • Exam (elaborations) • 25 pages • 2024
  • Available in package deal
  • S-12 CITYWIDE SPRINKLER SYSTEMS, S12 Sprinkler Test Questions and answers Latest Updated 2024 (SOLVED 100%) THE __________ IS RESPONSIBLE TO MAINTAIN SPRINKLER SYS. AND TO DETERMINE QUALIFICATIONS. - OWNER RECORDS OF ALL INSPECTIONS AND MX SHALL BE MAINTAINED ON PREMISES FOR A MIN. OF __________ YEARS. - 3 THE BUILDING OWNER SHALL ASSIGN A(N) ____________ TO COMPLY WITH REQUIREMENTS. - IMPAIRMENT COORDINATOR REGULAR MX AND MINOR REPAIRS NOT AFFECTING MORE THAN ________ FLOOR(S) ARE CONSIDE...
    (0)
  • $14.99
  • + learn more
Sprinkler Chart Questions (S12) Latest Update Graded A
  • Sprinkler Chart Questions (S12) Latest Update Graded A

  • Exam (elaborations) • 19 pages • 2024
  • Available in package deal
  • Sprinkler Chart Questions (S12) Latest Update Graded A How often shall the stem of an OS&Y Valve be lubricated Annually The 3 year dry pipe trip test is to be performed by whom? MP & MFSPC Fire department connections are to be inspected how often? Quarterly Water motor gongs are to be tested how often? Quarterly In a water spray fixed system inspection if the strainer is found corroded what color tag is required? Yellow A sprinkler head with a red frame has a temperature classification of? ...
    (0)
  • $9.99
  • + learn more
S-12 CITYWIDE SPRINKLER SYSTEMS, S12 Sprinkler Test Questions and answers Already Graded A+ Latest Updated & Verified 2024
  • S-12 CITYWIDE SPRINKLER SYSTEMS, S12 Sprinkler Test Questions and answers Already Graded A+ Latest Updated & Verified 2024

  • Exam (elaborations) • 25 pages • 2024
  • S-12 CITYWIDE SPRINKLER SYSTEMS, S12 Sprinkler Test Questions and answers Already Graded A+ Latest Updated & Verified 2024. THE __________ IS RESPONSIBLE TO MAINTAIN SPRINKLER SYS. AND TO DETERMINE QUALIFICATIONS. - OWNER RECORDS OF ALL INSPECTIONS AND MX SHALL BE MAINTAINED ON PREMISES FOR A MIN. OF __________ YEARS. - 3 THE BUILDING OWNER SHALL ASSIGN A(N) ____________ TO COMPLY WITH REQUIREMENTS. - IMPAIRMENT COORDINATOR REGULAR MX AND MINOR REPAIRS NOT AFFECTING MORE THAN ________ FLOO...
    (0)
  • $18.49
  • + learn more
S12 sprinkler Test Questions and Answers Latest Updated 2024 Already Graded A+!
  • S12 sprinkler Test Questions and Answers Latest Updated 2024 Already Graded A+!

  • Exam (elaborations) • 20 pages • 2024
  • Available in package deal
  • S12 sprinkler Test Questions and Answers Latest Updated 2024 Already Graded A+! RECORDS OF ALL INSPECTIONS AND MX SHALL BE MAINTAINED ON PREMISES FOR A MIN. OF YEARS. - answers>3 3. THE BUILDING OWNER SHALL ASSIGN A(N) TO COMPLY WITH REQUIREMENTS. - answers>IMPAIRMENT COORDINATOR 4. REGULAR MX AND MINOR REPAIRS NOT AFFECTING MORE THAN FLOOR(S) ARE CONSIDERED PLANNED REMOVAL FROM SERVICE. - answers>1 5. SHUTDOWNS AFFECTING MORE THAN FLOOR(S) ARE CONSIDERED UNPLANNED OUT OF SERVIC...
    (0)
  • $17.49
  • + learn more
Z-51 Test Questions and Answers Latest Updated 2023/2024 Grade A+
  • Z-51 Test Questions and Answers Latest Updated 2023/2024 Grade A+

  • Exam (elaborations) • 47 pages • 2023
  • Z-51 Test Questions and Answers Latest Updated 2023/2024 Grade A+. The ratio of actual pressure of water pressure in the atmosphere to the saturated pressure of given temperature is A) partial pressure. B) relative humidity. C) humidity effect. D) absolute humidity.: 3. The total amount of heat to be removed from the refrigerant in a condenser equals the heat picked up in the A) evaporator plus the heat of compression. B) evaporator. C) evaporator plus the heat of included non-condensa...
    (0)
  • $14.49
  • + learn more
Local 94 / S-12, S-13, S-14 Review and information || with Accurate Answers 100%.
  • Local 94 / S-12, S-13, S-14 Review and information || with Accurate Answers 100%.

  • Exam (elaborations) • 17 pages • 2024
  • Who is responsible for assigning and impairment coordinator? correct answers The Building owner. How long must an impairment coordinator keep records of system inspections and service? correct answers 3 Years. How many spare sprinkler heads must be kept on site for emergency replacement? correct answers 6. How often should FD connections be tested and what type of test must be performed? correct answers Every 5 years and a Hydro-static Pressure test must be performed. What is a Plann...
    (0)
  • $13.09
  • + learn more
Local 94 / S-12, S-13, S-14 Review and information Questions and Answers Rated A
  • Local 94 / S-12, S-13, S-14 Review and information Questions and Answers Rated A

  • Exam (elaborations) • 38 pages • 2024
  • Available in package deal
  • Local 94 / S-12, S-13, S-14 Review and information Questions and Answers Rated A Who is responsible for assigning and impairment coordinator? The Building owner. How long must an impairment coordinator keep records of system inspections and service? 3 Years. How many spare sprinkler heads must be kept on site for emergency replacement? 6. How often should FD connections be tested and what type of test must be performed? Every 5 years and a Hydro-static Pressure test must be performed. What i...
    (0)
  • $10.99
  • + learn more
Sprinkler Chart Questions (S12) Graded A+
  • Sprinkler Chart Questions (S12) Graded A+

  • Exam (elaborations) • 11 pages • 2024
  • Available in package deal
  • How often shall the stem of an OS&Y Valve be lubricated - Answer-Annually The 3 year dry pipe trip test is to be performed by whom? - Answer-MP & MFSPC Fire department connections are to be inspected how often? - Answer-Quarterly Water motor gongs are to be tested how often? - Answer-Quarterly In a water spray fixed system inspection if the strainer is found corroded what color tag is required? - Answer-Yellow A sprinkler head with a red frame has a temperature classification of? - Answer-...
    (0)
  • $7.99
  • + learn more
S-12 CITYWIDE SPRINKLER SYSTEMS, S12 sprinkler Test Questions and Answers Latest Updated 2024 Already Graded A+!
  • S-12 CITYWIDE SPRINKLER SYSTEMS, S12 sprinkler Test Questions and Answers Latest Updated 2024 Already Graded A+!

  • Exam (elaborations) • 20 pages • 2024
  • Available in package deal
  • S12 sprinkler Test Questions and Answers Latest Updated 2024 Already Graded A+!. THE IS RESPONSIBLE TO MAINTAIN SPRINKLER SYS. AND TO DETERMINE QUALIFICATIONS. - answers>OWNER 2. RECORDS OF ALL INSPECTIONS AND MX SHALL BE MAINTAINED ON PREMISES FOR A MIN. OF YEARS. - answers>3 3. THE BUILDING OWNER SHALL ASSIGN A(N) TO COMPLY WITH REQUIREMENTS. - answers>IMPAIRMENT COORDINATOR 4. REGULAR MX AND MINOR REPAIRS NOT AFFECTING MORE THAN FLOOR(S) ARE CONSIDERED PLANNED REMOVAL FROM SE...
    (0)
  • $15.49
  • + learn more