Pjm exam - Study guides, Class notes & Summaries
Looking for the best study guides, study notes and summaries about Pjm exam? On this page you'll find 224 study documents about Pjm exam.
Page 2 out of 224 results
Sort by
-
PJM Transmission Exam Study Guide | Questions with 100% Correct Answers | Verified | Latest Update 2024 | 30 Pages
- Exam (elaborations) • 30 pages • 2023 Popular
- Available in package deal
-
- $20.49
- 1x sold
- + learn more
During System Restoration, what is the optimal Frequency Range? - 59.75 - 61 Hz 
The 500 kV system has normal bus voltages between? - 500 to 550 kV 
When Connecting 2 islands, the operator must match? - Voltage, Phase Angle and Frequency 
What are the Minimum Source Requirements for a 500kV line? (Gen/mile and load/mile) - 30 MW 
Gen/mile of energized 500 kV and 20 MW Load/mile of energized 500 kV 
When will PJM issue a Minimum Generation Alert? (how many MW under normal operating limits) - 
Whe...
-
PJM Exam Questions & Answers 2024
- Exam (elaborations) • 14 pages • 2024
-
Available in package deal
-
- $8.99
- + learn more
PJM Exam Questions & Answers 2024 
 
 
What is the threshold for having a satellite phone? - ANSWER-500 MW 
 
How often is reactive testing completed? - ANSWER-5 years 
 
Which of the following would NOT be a cause for a sudden deviation in the balancing area ACE? 
 
1) Incorrect interchange number 
2) Loss of a tie-line RTU 
3) Loss of internal load 
4) Loss of adjacent control area generation - ANSWER-Loss of adjacent control area generation 
 
PJM should be made aware of any fuel shortage tha...
-
PJM Exam Questions and Answers 100% Correct
- Exam (elaborations) • 16 pages • 2024
- Available in package deal
-
- $12.49
- + learn more
PJM Exam Questions and Answers 100% Correct 
During reactive testing, which entity must give approval to change an approved voltage 
schedule? 
PJM, TOP, MOC, GO - Correct Answer ️️ -TO 
Generation available within 10 minutes for offline reserve units: 
Quick-start (hydro), manual, operating, supplemental - Correct Answer ️️ -Quick-start 
(hydro) 
Minimum MVARs for an individual generator that is required to do reactive testing? - 
Correct Answer ️️ -20 MVA 
Minimum MVARs for an aggr...
-
PJM Generation Dispatcher Exam Practice Questions and Answers 2023 Verified 100%
- Exam (elaborations) • 5 pages • 2023
-
- $11.49
- 1x sold
- + learn more
PJM Generation Dispatcher Exam Practice Questions and Answers 2023 Verified 100%
-
PJM Generation Dispatcher Exam 2024 with 100% correct answers
- Exam (elaborations) • 62 pages • 2024
-
- $15.49
- 1x sold
- + learn more
An EXCITER on a traditional generator does what? - correct answer Voltage regulation (AVR) if you change the excitation current, you change the voltage. 
 
ECO Min, ECO Max, and EMERG Max are genrator _________________. - correct answer Limits 
 
When synchronizing to the interconnection, what needs to be synchronized? - correct answer Frequency, Voltage, and phase angle. 
 
GMD (GeoMagnetic Disturbance) procedure is implemented when? - correct answer 10A or greater is measured by specia...
And that's how you make extra money
-
NCARB PJM Exam with Questions Solved with 100% Correct Answers
- Exam (elaborations) • 26 pages • 2024
-
- $13.49
- + learn more
During construction, the owner provides many of the building materials needed for 
construction from his personal stash. If the owner-architect contract stipulates that the 
architect's fee will be 7% of construction costs, will the architect be paid for that 7% of 
the actual construction cost or 7% of what the construction cost would have been had 
the material not been provided free by the owner? - Answer The owners budget for the 
cost of the work includes the reasonable value of labor, mat...
-
PJM Exam | Questions & 100% Correct Answers (Verified) | Latest Update | Grade A+
- Exam (elaborations) • 27 pages • 2024
- Available in package deal
-
- $12.49
- + learn more
During reactive testing, which entity must give approval to change an approved voltage 
schedule? 
PJM, TOP, MOC, GO 
: TO 
Generation available within 10 minutes for offline reserve units: 
Quick-start (hydro), manual, operating, supplemental 
: Quick-start (hydro) 
Minimum MVARs for an individual generator that is required to do reactive testing? 
: 20 MVA 
Minimum MVARs for an aggregate of generators that is required to do reactive testing? 
: 75 MVA 
Power transformer is connected to the g...
-
PJM Exam | Questions & 100% Correct Answers (Verified) | Latest Update | Grade A+
- Exam (elaborations) • 24 pages • 2024
- Available in package deal
-
- $12.99
- + learn more
What is the threshold for having a satellite phone? 
: 500 MW 
How often is reactive testing completed? 
: 5 years 
Which of the following would NOT be a cause for a sudden deviation in the balancing 
area ACE? 
1) Incorrect interchange number 
2) Loss of a tie-line RTU 
3) Loss of internal load 
4) Loss of adjacent control area generation 
: Loss of adjacent control area generation 
PJM should be made aware of any fuel shortage that a generator may experience. This 
information assists in ana...
-
PJM Exam Questions and Answers 2024
- Exam (elaborations) • 10 pages • 2024
-
Available in package deal
-
- $15.49
- + learn more
PJM Exam
-
PJM EXAM QUESTIONS AND ANSWERS
- Package deal • 5 items • 2024
-
- $28.49
- + learn more
PJM EXAM QUESTIONS AND ANSWERS INCLUDING PAST AND LATEST PAPER AS OF 2024. BEST GUARANTEED SUCCESS
Did you know that on average a seller on Stuvia earns $82 per month selling study resources? Hmm, hint, hint. Discover all about earning on Stuvia