Cmgt 410 - Study guides, Class notes & Summaries
Looking for the best study guides, study notes and summaries about Cmgt 410? On this page you'll find 66 study documents about Cmgt 410.
Page 2 out of 66 results
Sort by
-
CMGT 4100- Test 1 - Ch: 1,2,3,4,5 Questions & Answers 100% Correct!!
- Exam (elaborations) • 11 pages • 2024
-
- $11.99
- + learn more
What is a project? - ANSWERA temporary endeavor undertaken to create a unique product, service, or result 
 
Every project has: - ANSWER- A start and finish point 
 
-A deliverable 
 
Project Planning: - ANSWERthe process of choosing the one method and order of work to be adopted for a project from all the various ways and sequences in which it could be done." 
 
Project planning elements include: - ANSWERscope, design and alternate designs, cost, time, finance, land, procurement, operations, e...
-
CMGT 410 - Week 5 - Apply: Post-Test Spring 2022
- Exam (elaborations) • 40 pages • 2023
-
- $8.99
- + learn more
CMGT 410 - Week 5 - Apply: Post-Test Spring 2022
-
CMGT 410 Midterm #2 100% Correct!
- Exam (elaborations) • 2 pages • 2024
- Available in package deal
-
- $14.99
- + learn more
Soil nails are typically mechanically tensioned. - ANSWERFalse 
 
Helical, or mechanical, tieback anchors are usually the most economical retaining wall tieback. - ANSWERFalse
-
CMGT 410 Exams Questions & Answers 100% Correct!
- Exam (elaborations) • 2 pages • 2024
- Available in package deal
-
- $14.99
- + learn more
Scrum - ANSWERA framework within which people can address complex adaptive problems, while productively and creatively delivering products of the highest possible value. 
 
Agile - ANSWERThe ability to adapt and change directions as needed. 
 
Self-organization model - ANSWERA model that optimizes the flexibility of decision making and the courage to be creative 
 
Product Owner - ANSWERA Scrum team member whose main job is to maximize the value of the product and the value of the work of the de...
-
CMGT 410 Midterm #2 Questions & Answers 100% Correct!
- Exam (elaborations) • 2 pages • 2024
- Available in package deal
-
- $14.99
- + learn more
Three Safety Considerations when working with cofferdams. - ANSWER1. People working inside the cofferdam 
2. Areas surrounding jobsite that would be affected by spillage 
3. Falls into the cofferdam 
 
Scour - ANSWERErosion of banks and earth surrounding a cofferdam from excess flows and differing water conditions due to the cofferdam being built. 
 
Steel Sheet Piling - ANSWER 
 
Soldier Pile and Lagging - ANSWER 
 
Soil Nails - ANSWER 
 
Secant Pile - ANSWER 
 
T or F: Soldier Pile Walls are v...
Fear of missing out? Then don’t!
-
CMGT 410 Exams Questions & Answers 100% Correct!
- Exam (elaborations) • 2 pages • 2024
- Available in package deal
-
- $14.49
- + learn more
Scrum - ANSWERA framework within which people can address complex adaptive problems, while productively and creatively delivering products of the highest possible value. 
 
Agile - ANSWERThe ability to adapt and change directions as needed. 
 
Self-organization model - ANSWERA model that optimizes the flexibility of decision making and the courage to be creative 
 
Product Owner - ANSWERA Scrum team member whose main job is to maximize the value of the product and the value of the work of the de...
-
CMGT 410 Midterm #2 Questions & Answers 100% Correct!
- Exam (elaborations) • 2 pages • 2024
- Available in package deal
-
- $14.99
- + learn more
Three Safety Considerations when working with cofferdams. - ANSWER1. People working inside the cofferdam 
2. Areas surrounding jobsite that would be affected by spillage 
3. Falls into the cofferdam 
 
Scour - ANSWERErosion of banks and earth surrounding a cofferdam from excess flows and differing water conditions due to the cofferdam being built. 
 
Steel Sheet Piling - ANSWER 
 
Soldier Pile and Lagging - ANSWER 
 
Soil Nails - ANSWER 
 
Secant Pile - ANSWER 
 
T or F: Soldier Pile Walls are v...
-
CMGT 4100 Test 1 Questions & Answers(RATED A)
- Exam (elaborations) • 4 pages • 2024
- Available in package deal
-
- $14.49
- + learn more
What info is addressed in the planning and scheduling process? - ANSWER-Planning- "what" is going to be done, "how", "where", and by "whom" 
-Scheduling- determining time needed to complete a project 
 
Who developed the bar chart - ANSWERHenry Gantt 
 
Is A-O-A (or ADM) a version of CPM scheduling? - ANSWERYes 
 
What is the difference in determinist and probabilistic durations? Which does A-O-A use? Which does PERT use? - ANSWER-Deterministic schedules - specific durations dates, and t...
-
CMGT 410: Project Planning and Implementation Post Test | 105 Questions with 100% Correct Answers | Verified | Latest Update 2024
- Exam (elaborations) • 12 pages • 2023
-
- $14.49
- + learn more
Which of the following is not a part of active listening? - Thinking about what you are going to do or 
say next 
All of the following are examples of special causes, except for which one? - Measurement errors 
Is Scrum an Agile methodology? - No. Scrum is a framework. 
When the customer is thinking and explaining something one way and the team takes it in a different 
way. This is referred to as which of the following? - The gulf of misunderstanding 
Which of the following are parts of the 13 c...
-
CMGT 410 - Week 5 - Apply: Post-Test Spring 2022(100% Verified)
- Exam (elaborations) • 19 pages • 2022
-
- $10.49
- 1x sold
- + learn more
CMGT 410 - Week 5 - Apply: Post-Test Spring 2022(100% Verified)
Do you wonder why so many students wear nice clothes, have money to spare and enjoy tons of free time? Well, they sell on Stuvia! Imagine your study notes being downloaded a dozen times for $15 each. Every. Single. Day. Discover all about earning on Stuvia