Temporary stabilization ✔️Ans - stone or plastic as a BMP to reduce erosion
by stabilizing areas that will lay bare for an extended amount of time. EX.
stockpiles, dikes, dams
5 types of plans ✔️Ans - 1. SWPPP
2. erosion and sed. plan (ESCP)
3. drainage plan/grading plan
4. spill prevention control and countermeasure plan (SPCC)
5. MS4 stormwater management plan/program (SWMP)
SWPPP ✔️Ans - -required by NPDES for industrial, multi sector, and
construction general permits
-addresses operations that come in contact with stormwater and specific
BMPs for reduction or elimination of discharges
-site specific
-identifies features, site activities and pollutants of concern
Erosion & sediment control plan (ESCP) ✔️Ans - -a component of a
construction permit
-can sometimes be a part of an industrial permit (ex mining)
-shows all required E&S controls; including design, placement, and details
Drainage/ grading plans ✔️Ans - -a component of the swppp
-is used for inspection of MS4 stormwater systems
- sometimes combined with ESCP
Spill Prevention Control and Countermeasures Plan ✔️Ans - -part of
construction permit OR
-part of industrial multi sector permit
-may be included in MS4 permits (housekeeping)
-details all spill prevention measures on site
-details spill clean up
-details training requirements of staff
-details good housekeeping BMPs
, MS4 SMP ✔️Ans - -outline 6 minimum control measures for phase II
municipalities
-outlines all requirements of implementing a stormwater program for phase I
municipalities or sites (ex. hospitals, universities, or POTWs)
-details post construction inspection requirements, maintenance, pollution
prevention, good housekeeping, IDDE inspections
components of a plan ✔️Ans - -table of contents
-ESC plan
-certification
-NOI
-site specific info (soils, topography, utilities, limits of project, runoff
coefficient, receiving waters and quality, environmental assessment)
-project infor
-disturbed areas of the project
-scheduling of construction activities
-maintenance schedule of BMPs
A plan certification ✔️Ans - identifies the person or persons responsible for
implementation
MS4 may list TMDL requirements for the following pollutants ✔️Ans - solid
waste, temperature, Haz waste, trash, construction material handling,
organics
example of a visible pollutants ✔️Ans - sediment or turbidity
example of non-visible pollutant ✔️Ans - pH
Categories of BMPs ✔️Ans - -site planning and management (training/
scheduling)
-erosion control
-sediment control
-runoff control
-good housekeeping
-post construction
Les avantages d'acheter des résumés chez Stuvia:
Qualité garantie par les avis des clients
Les clients de Stuvia ont évalués plus de 700 000 résumés. C'est comme ça que vous savez que vous achetez les meilleurs documents.
L’achat facile et rapide
Vous pouvez payer rapidement avec iDeal, carte de crédit ou Stuvia-crédit pour les résumés. Il n'y a pas d'adhésion nécessaire.
Focus sur l’essentiel
Vos camarades écrivent eux-mêmes les notes d’étude, c’est pourquoi les documents sont toujours fiables et à jour. Cela garantit que vous arrivez rapidement au coeur du matériel.
Foire aux questions
Qu'est-ce que j'obtiens en achetant ce document ?
Vous obtenez un PDF, disponible immédiatement après votre achat. Le document acheté est accessible à tout moment, n'importe où et indéfiniment via votre profil.
Garantie de remboursement : comment ça marche ?
Notre garantie de satisfaction garantit que vous trouverez toujours un document d'étude qui vous convient. Vous remplissez un formulaire et notre équipe du service client s'occupe du reste.
Auprès de qui est-ce que j'achète ce résumé ?
Stuvia est une place de marché. Alors, vous n'achetez donc pas ce document chez nous, mais auprès du vendeur LeCrae. Stuvia facilite les paiements au vendeur.
Est-ce que j'aurai un abonnement?
Non, vous n'achetez ce résumé que pour €10,75. Vous n'êtes lié à rien après votre achat.