Projected service outage - Study guides, Class notes & Summaries

Looking for the best study guides, study notes and summaries about Projected service outage? On this page you'll find 19 study documents about Projected service outage.

All 19 results

Sort by

NERC Final Assessment Exam Correct answers (Already GRADED A)
  • NERC Final Assessment Exam Correct answers (Already GRADED A)

  • Exam (elaborations) • 98 pages • 2023
  • Available in package deal
  • When using a dynamic schedule and the energy profile in an hour is >250 MW and the actual hourly integration deviates from the hourly energy profile by ____ the tag must be modified. A. 100 MW B. 10% C. 50 MW D. 25% B. 10% Dry steam plants, flash steam plants, and binary cycle power plants are the three main types of what kind of generating plant? A. Nuclear generators B. Combustion turbine generators C. Geothermal generators D. Hydroelectric generators C. Geothermal generators...
    (1)
  • $11.99
  • 1x sold
  • + learn more
NERC PREP TEST 101 QUESTIONS AND ANSWERS (100% CORRECT SOLUTIONS)
  • NERC PREP TEST 101 QUESTIONS AND ANSWERS (100% CORRECT SOLUTIONS)

  • Exam (elaborations) • 73 pages • 2023
  • Available in package deal
  • 1. If a 500 kV transmission line with a surge impedance loading of 800 MW is currently loaded at 1400 MW, which of the following events would most likely occur? a. Generator MVAR output would increase b. All system capacitors would trip off-line c. Generator MVAR output would decrease d. All automatic reactors would connect to the system a. Generator MVAR output would increase 2. When system conditions are such that emergency procedures are expected to be implemented, which of the fo...
    (0)
  • $11.49
  • + learn more
SOS NERC Prep - RElIABILITY Exam| 200 QUESTIONS AND ANSWERS | GRADED A
  • SOS NERC Prep - RElIABILITY Exam| 200 QUESTIONS AND ANSWERS | GRADED A

  • Exam (elaborations) • 109 pages • 2023
  • Available in package deal
  • The Reliability Coordinator just informed you of a slow time error correction which will begin at the top of the next hour. Your EMS system will not let you change your scheduled frequency. Your Frequency Bias Setting is -100 MW/.1Hz. What action should you take? A) Increase Net Interchange Schedule by 20 MWs. B) Inform the Reliability Coordinator that you cannot participate in the time error correction. C) Decrease Net Interchange Schedule by 20 MWs. D) Increase Net Interchange Sche...
    (0)
  • $11.99
  • + learn more
 CISA examtopics 201-300 Exam Questions with Verified Answers,100% CORRECT
  • CISA examtopics 201-300 Exam Questions with Verified Answers,100% CORRECT

  • Exam (elaborations) • 40 pages • 2024
  • CISA examtopics 201-300 Exam Questions with Verified Answers 201. During a project meeting for the implementation of an enterprise resource planning (ERP). a new requirement is requested by the finance department. Which of the following would BEST indicate to an IS auditor that the resulting risk to the project has been assessed? A. The project status as reported in the meeting minutes B. The analysis of the cost and time impact of the requirement C. The updated business requirements D...
    (0)
  • $11.49
  • + learn more
NERC PREP TEST 101 Graded A+ 2023
  • NERC PREP TEST 101 Graded A+ 2023

  • Exam (elaborations) • 38 pages • 2023
  • Available in package deal
  • 1. If a 500 kV transmission line with a surge impedance loading of 800 MW is currently loaded at 1400 MW, which of the following events would most likely occur? a. Generator MVAR output would increase b. All system capacitors would trip off-line c. Generator MVAR output would decrease d. All automatic reactors would connect to the system - ANSWER-a. Generator MVAR output would increase 2. When system conditions are such that emergency procedures are expected to be implemented, which of ...
    (0)
  • $14.49
  • + learn more
Business Continuity Questions and Answers Fully solved
  • Business Continuity Questions and Answers Fully solved

  • Exam (elaborations) • 7 pages • 2023
  • Available in package deal
  • Business Continuity Questions and Answers Fully solved Business Continuity Plans (BCP) An organizations ability to maintain critical business functions (CBFs) after a disruptive event BCP provides a plan to ensure the CBFs continue to operate even if disruptions happens Major Risk Mitigation Plans Business continuity readiness involves: Business continuity planning (BCP) -Business impact analysis (BIA) -Disaster recovery planning (DRP) -Incident response planning (IRP) ...
    (0)
  • $17.49
  • + learn more
Exam (elaborations) WGU C846 ITIL Business of IT C846  Business Information  Technology Final Semester Exams  graded A.
  • Exam (elaborations) WGU C846 ITIL Business of IT C846 Business Information Technology Final Semester Exams graded A.

  • Exam (elaborations) • 41 pages • 2022
  • Exam (elaborations) WGU C846 ITIL Business of IT C846 Business Information Technology Final Semester Exams graded A. Worked-out questions and answers are provided to help business IT students do well and help them prepare for exams properly with terms like; Service validation and testing Service asset and configuration management (SACM Configuration management database (CMDB) What does the acronym RFC stand for?
    (1)
  • $12.99
  • 2x sold
  • + learn more
WGU C846 ITIL Study Guide 2023 with Correct Questions and Answers 100% Pass
  • WGU C846 ITIL Study Guide 2023 with Correct Questions and Answers 100% Pass

  • Exam (elaborations) • 15 pages • 2023
  • WGU C846 ITIL Study Guide 2023 with Correct Questions and Answers 100% Pass This is considered the core of the life cycle management process *** Strategy life cycle A service that produces the basic outcome of the customers desire *** Core Service Someone who buys good or services *** Customer A service needed to deliver a core service *** Enabling service A service that is added to the core to make it more attractive *** Enhancing service A service carried out by an IT provide...
    (0)
  • $9.99
  • + learn more
Information Systems 2024 CLEP with 100% correct answers 2024
  • Information Systems 2024 CLEP with 100% correct answers 2024

  • Exam (elaborations) • 32 pages • 2024
  • File extensions such as .txt, .bmp, and .mp3 are used to identify a file's - ANSWER-Format Which of the following network technologies allows secure transmission of data over an unsecured public network link between private networks? - ANSWER-Virtual Private Network (VPN) Which of the following is a goal of green computing? (A) Reducing the potential for a computer to become infected with malware (B) Reducing the number of people experiencing computer vision syndrome (C) Reducing po...
    (0)
  • $7.99
  • + learn more
CLEP EXAM WITH 100% CORRECT ANSWERS 2024
  • CLEP EXAM WITH 100% CORRECT ANSWERS 2024

  • Exam (elaborations) • 32 pages • 2024
  • File extensions such as .txt, .bmp, and .mp3 are used to identify a file's - ANSWER-Format Which of the following network technologies allows secure transmission of data over an unsecured public network link between private networks? - ANSWER-Virtual Private Network (VPN) Which of the following is a goal of green computing? (A) Reducing the potential for a computer to become infected with malware (B) Reducing the number of people experiencing computer vision syndrome (C) Reducing po...
    (0)
  • $7.99
  • + learn more