Nicet level 2 - Study guides, Class notes & Summaries
Looking for the best study guides, study notes and summaries about Nicet level 2? On this page you'll find 334 study documents about Nicet level 2.
All 334 results
Sort by
-
Nicet Level 1 - Water Based Layout Practice Questions and Answers 100% Pass
- Exam (elaborations) • 19 pages • 2024
- Available in package deal
-
- $12.49
- 4x sold
- + learn more
Nicet Level 1 - Water Based Layout Practice 
Questions and Answers 100% Pass 
Toggle hangers shall be permitted only for the support of pipe __________ inches or 
smaller in size under ceilings of hollow tile or metal lath and plaster. - Answer-1 2/2 in. 
(ref. NFPA 13 2016 Sec. 9.2.1.1.2. 
While conducting a flow test, the chosen hydrant should be ______ - Answer-As close 
to the property where the sprinkler system is being installed. (Ref, NFPA 13 Sec. 
A.24.2.2. or NFPA 291) 
What formula is ...
-
NICET Fire Alarm Level 1 Exam Questions And Revised Correct Answers
- Exam (elaborations) • 14 pages • 2024 Popular
-
- $11.34
- 2x sold
- + learn more
NICET Fire Alarm Level 1 Exam 
Questions And Revised Correct 
Answers 
Elevator lobby smoke detectors shall be mounted within a 
maximum of which distance from the center-line of the 
door? - ANSWER : 21 feet 
At minimum, when working near power lines with voltage 
of 600 volts and lower, an aerial lift operator shall maintain 
which distance from the lines? - ANSWER : 10 feet 
The use of unprotected EMT shall be permitted under 
which conditions? - ANSWER : when in direct contact 
with t...
-
NICET Level 2 Fire Alarms (Latest 2024/ 2025 Update) Qs & As| 100% Correct| Grade A (Verified Answers)
- Exam (elaborations) • 46 pages • 2024
- Available in package deal
-
- $10.99
- 1x sold
- + learn more
NICET Level 2 Fire Alarms (Latest 2024/ 2025 Update) Qs & As| 100% Correct| Grade A (Verified Answers) 
 
 
Q: A fire pump was installed in a low-rise residential building with a required fire alarm system. What are the requirements for the pump running signal? 
a. It shall be a supervisory signal. 
b. It shall be an alarm signal. 
c. It shall be a supervisory or alarm signal. 
d. A pump running signal is not required. 
 
 
Answer: 
c 
 
 
 
Q: A licensed electrician was hired to install duc...
-
NICET Level 2 Full Exam Questions and Answers
- Exam (elaborations) • 64 pages • 2024
- Available in package deal
-
- $14.49
- 1x sold
- + learn more
NICET Level 2 Full Exam Questions and Answers 
You are inspecting a construction site and notice that the soil appears to be a fine- 
grained, cohesive material with good bearing capacity. What type of soil is this likely to 
be? 
a. Clay 
b. Sand 
c. Gravel 
d. Loam - Answer-a. Clay 
You are inspecting the clearing and grubbing of a construction site and notice that a 
large tree has been removed within the limits of disturbance. What should you do? 
a. Notify the project manager and request th...
-
Nicet Level 2: Concrete Exam Questions and Answers 2024
- Exam (elaborations) • 6 pages • 2024
- Available in package deal
-
- $11.49
- 1x sold
- + learn more
Nicet Level 2: Concrete Exam Questions and Answers 2024 
What is the testing frequency for concrete? - Answer-every 50 yards 
When should you take cylinder samples? - Answer-Every 100 yards 
What are the components on a batch ticket? - Answer-1. Ticket Number 
2. Plant 
3. Project Number 
4. Mix ID 
5. Time of Batch 
6. Time arrival 
7. Time Discharge 
8. Time Completed 
9. Mix proportions 
When should concrete samples should not be taken? - Answer-Before 10% and 90% of 
truck has been discharge...
Get paid weekly? You can!
-
NICET Level 2 ITM of Water Based Systems Questions and Answers 100% Pass
- Exam (elaborations) • 23 pages • 2023
- Available in package deal
-
- $9.99
- 1x sold
- + learn more
NICET Level 2 ITM of Water Based Systems Questions and Answers 100% Pass When placing a LOTO on a system, how many locks should be applied? As many locks as their are personnel working on the system. 
A ladder must be able to support ____ times the weight of the expected load 3.3 
It is acceptable to enter into a confined space without an attendant, but only if all other precautions and PPE are taken. False 
A defective air pressure gauge on the supply air of a dry pipe system is considered a __...
-
NICET Level 2 ITM of Water Based Systems Questions and Answers(A+ Solution guide)2024 update
- Exam (elaborations) • 14 pages • 2024
- Available in package deal
-
- $7.99
- 1x sold
- + learn more
When placing a LOTO on a system, how many locks should be applied? - As many locks as their 
are personnel working on the system. 
A ladder must be able to support ____ times the weight of the expected load - 3.3 
It is acceptable to enter into a confined space without an attendant, but only if all other precautions and 
PPE are taken. - False 
A defective air pressure gauge on the supply air of a dry pipe system is considered a _____ - 
Critical deficiency 
When taking a sprinkler system out of...
-
NICET Level 2 ITM of Water Based Systems | 155 Questions with 100% Correct Answers | Verified | Latest Update 2024
- Exam (elaborations) • 14 pages • 2023
-
- $15.49
- 1x sold
- + learn more
When placing a LOTO on a system, how many locks should be applied? - As many locks as their are 
personnel working on the system. 
A ladder must be able to support ____ times the weight of the expected load - 3.3 
It is acceptable to enter into a confined space without an attendant, but only if all other precautions and 
PPE are taken. - False 
A defective air pressure gauge on the supply air of a dry pipe system is considered a _____ - Critical 
deficiency 
When taking a sprinkler system out of...
-
NICET Level 2 NFPA 25: Standard for Inspection, Testing, and Maintenance of Water-Based Fire Protection Systems Exam 2024
- Exam (elaborations) • 5 pages • 2024
- Available in package deal
-
- $11.49
- 1x sold
- + learn more
NICET Level 2 NFPA 25: Standard for 
Inspection, Testing, and Maintenance 
of Water-Based Fire Protection 
Systems Exam 2024 
Chapter 1 - Answer-Administration 
Chapter 2 - Answer-Referenced Publications (Other NFPA Standards) 
Chapter 3 - Answer-Definitions 
Chapter 4 - Answer-General Requirements (Owner's Chapter) 
Chapter 5 - Answer-Sprinkler Systems (Heads, Hangers, Waterflow Alarm Devices, AF 
Systems, Dry Pipe Systems) 
Chapter 6 - Answer-Standpipe & Hose Systems 
Chapter 7 - Answer-Hydra...
-
NICET LEVEL 1 AND 2 HIGHWAY CONSTRUCTION EXAMS WITH ACTUAL CORRECT QUESTIONS AND VERIFIED DETAILED RATIONALES ANSWERS LATEST 2024 [NEWEST] ALREADY GRADED A+
- Exam (elaborations) • 56 pages • 2024
- Available in package deal
-
- $20.49
- 1x sold
- + learn more
NICET LEVEL 1 AND 2 HIGHWAY CONSTRUCTION 
EXAMS WITH ACTUAL CORRECT QUESTIONS 
AND VERIFIED DETAILED RATIONALES 
ANSWERS LATEST 2024 [NEWEST] ALREADY 
GRADED A+
-
NICET Level 1 Water-Based Systems (Latest 2024/ 2025 Update) Qs & As| 100% Correct| Grade A (Verified Answers)
- Exam (elaborations) • 38 pages • 2024
- Available in package deal
-
- $10.99
- 1x sold
- + learn more
NICET Level 1 Water-Based Systems (Latest Update) Qs & As| 100% Correct| Grade A (Verified Answers) 
 
 
Q: What type of valve is designed for the purpose of reducing downstream water pressure under both residual and static conditions 
 
 
Answer: 
Pressure reducing valve 
 
 
 
Q: PIV and OS&Y shall be backed a __________ turn from the fully open position to prevent jamming. 
 
 
Answer: 
1/4 
 
 
 
Q: Gauges not accurate to within _______ percent of the full scale shall be recalibrated or repl...