Nccco test stuvia 2024 - Study guides, Class notes & Summaries

Looking for the best study guides, study notes and summaries about Nccco test stuvia 2024? On this page you'll find 8 study documents about Nccco test stuvia 2024.

All 8 results

Sort by

Nccco Core + Specialty Test Prep Questions & Answers(RATED A+)
  • Nccco Core + Specialty Test Prep Questions & Answers(RATED A+)

  • Exam (elaborations) • 12 pages • 2024
  • Available in package deal
  • ASME B30.5 - ANSWERMobile and Locomotive cranes, all types ASME B30.3 - ANSWERTower Cranes ASME B30.23 - ANSWERPersonel Lifting Regs OSHA 29 CFR 1926.1400 Series - ANSWERCranes & Derrick's used in Construction regs. Rotation Resistant Wire Rope - ANSWER2 randomly broken wires in 6 diameters. 4 randomly broken wires in 30 diameters. Safety factor 5.0 Safety factor personel lifts 10-1 ASME B30.9 - ANSWERSlings Extended Crawlers Will? - ANSWERIncrease over the side ca...
    (0)
  • $13.99
  • + learn more
Nccco signal person test Questions & Answers 100% Correct!!
  • Nccco signal person test Questions & Answers 100% Correct!!

  • Exam (elaborations) • 7 pages • 2024
  • Available in package deal
  • continuously - ANSWERduring all crane movements, asme b30.5 states that communication shall be maintained stop crane movements - ANSWERif the communication is disrupted at any time while the crane is operation, the operator shall osha 1926.1400 appendix a - ANSWEROSHA's standard method crane hand signals would be located in the following designated person - ANSWERaccording to asme b30.5 prior to qualifying all signal persons they must be tested by? none - ANSWERwhat should be the ...
    (0)
  • $13.49
  • + learn more
NCCCO Core sample test Question & Answers 100% Accurate!!
  • NCCCO Core sample test Question & Answers 100% Accurate!!

  • Exam (elaborations) • 8 pages • 2024
  • Available in package deal
  • A frequent inspection is: - ANSWERDaily to monthly 1. What action does a signal person intend the operator to perform if he extends his arm at shoulder height, makes a fist with his hand, and sticks his/her thumb up? - ANSWERBoom Up (Appendix A to Subpart CC of Part 1926--Standard Hand Signals) 3. The load line of the crane you're operating contacts an energized power line. There's no sign of any other danger, such as fire. What should you do? - ANSWERStay in the cab until the line...
    (0)
  • $13.99
  • + learn more
NCCCO Final Test Questions & Answers 100% Correct!!
  • NCCCO Final Test Questions & Answers 100% Correct!!

  • Exam (elaborations) • 5 pages • 2024
  • Available in package deal
  • Which area do truck cranes without a 5th outrigger generally have no lifting capacity unless the manufacturer states otherwise? - ANSWERThe front What is the definition of "operating radius?" - ANSWERThe distance from the center of rotation of the crane to the center of gravity of the load What applies to the capacities below the bold line shown on a load chart? - ANSWERThey are based on the stability of the crane In which quadrant are rough terrain crane capacities generally grea...
    (0)
  • $13.49
  • + learn more
NCCCO Questions Test 1 Questions & Answers(RATED A+)
  • NCCCO Questions Test 1 Questions & Answers(RATED A+)

  • Exam (elaborations) • 5 pages • 2024
  • Available in package deal
  • Where is the best location for leveling a crane? - ANSWERUpperworks When determining the "gross load" the best method is: - ANSWERGet an accurate load weight and add the rigging. By order of hitch strength, which is the correct answer? - ANSWERBasket, vertical, choker What is the purpose of using a jib? - ANSWERIncrease height When taking a side strain on a boom, what concerns the
    (0)
  • $13.49
  • + learn more
NCCCO test #3 Correct Questions & Answers(RATED A+)
  • NCCCO test #3 Correct Questions & Answers(RATED A+)

  • Exam (elaborations) • 5 pages • 2024
  • Available in package deal
  • The crane is out of level, you release the swing break, the boom swings downhill, your: - ANSWERLoad radius increases Blocking can be placed under the ends of tracks to: - ANSWERIncrease the cranes stability when Operating over front or back On lattice boom crane's fitted with power load Lowering , a heavy load should be lowered by using the: - ANSWERPower Load-lowering feature and the foot break Abruptly stopping a rapid swing on a long-boom mobile crane will produce what major effe...
    (0)
  • $12.99
  • + learn more
NCCCO Practice Test Questions & Answers (GRADED A+)
  • NCCCO Practice Test Questions & Answers (GRADED A+)

  • Exam (elaborations) • 4 pages • 2024
  • Available in package deal
  • To provide protection in the crane's work area, barriers MUST be erected in accessible areas: A. Within machinery housing C. Within maximum radius D. In landing area - ANSWERB.Within the equipment's rotating structure All of the following can cause a two-block condition EXCEPT: A. Extending the boom B. Lowering the boom C. Hoisting up with the winch - ANSWERD. Raising the boom When rotation of the load may be hazardous, the operator must B. Use a longer radius C. Cautio...
    (0)
  • $12.49
  • + learn more
Nccco signal person test Questions and Answers 100% Pass
  • Nccco signal person test Questions and Answers 100% Pass

  • Exam (elaborations) • 7 pages • 2024
  • Nccco signal person test Questions and Answers 100% Pass continuously - ANSWER-during all crane movements, asme b30.5 states that communication shall be maintained stop crane movements - ANSWER-if the communication is disrupted at any time while the crane is operation, the operator shall osha 1926.1400 appendix a - ANSWER-OSHA's standard method crane hand signals would be located in the following designated person - ANSWER-according to asme b30.5 prior to qualifying all signal persons...
    (0)
  • $11.49
  • + learn more