Nccco 8 exam 2025 - Study guides, Class notes & Summaries

Looking for the best study guides, study notes and summaries about Nccco 8 exam 2025? On this page you'll find 16 study documents about Nccco 8 exam 2025.

All 16 results

Sort by

2025 Tower Crane Nccco / Nccco Tower Crane Flashcards 2024 - 2025 Exam
  • 2025 Tower Crane Nccco / Nccco Tower Crane Flashcards 2024 - 2025 Exam

  • Exam (elaborations) • 19 pages • 2024
  • 2025 Tower Crane Nccco / Nccco Tower Crane Flashcards Exam According to ASME B30.3, how many randomly broken wires must there be to remove a running wire rope from serivce - ANSWER-12 ASME 3-3.4.3(b)(1) According to ASME B30.3 when working near power lines when is a signal person required - ANSWER-When crane moves within a booms length of power lines ASME 3-3.4.3(a)(3) According to OSHA after the crane has been checked out and before personnel lift operations begin the crew should - ANSWER-H...
    (0)
  • $17.99
  • + learn more
NCCCO 8 exam | Questions and Correct Solutions | Latest Update 2024/2025 | Graded A+
  • NCCCO 8 exam | Questions and Correct Solutions | Latest Update 2024/2025 | Graded A+

  • Exam (elaborations) • 6 pages • 2024
  • Available in package deal
  • NCCCO 8 exam | Questions and Correct Solutions | Latest Update 2024/2025 | Graded A+ According to OSHA, what clearance should a crane in transit keep while going under 445KV lines? - Answer -16 feet While operating a crane near 280KV powerlines, what distance does OSHA require you to keep? - Answer -17 feet 8 inches When working around power lines you must: - Answer -Avoid stockpile material under powerlines Maintain the correct distance according to the rated K.V. Ground the crane w...
    (0)
  • $12.49
  • + learn more
NCCCO MOBILE CRANE EXAM | Questions and Correct Solutions | Latest Update 2024/2025 | Graded A+
  • NCCCO MOBILE CRANE EXAM | Questions and Correct Solutions | Latest Update 2024/2025 | Graded A+

  • Exam (elaborations) • 21 pages • 2024
  • Available in package deal
  • NCCCO MOBILE CRANE EXAM | Questions and Correct Solutions | Latest Update 2024/2025 | Graded A+ 1. What action does a signal person intend the operator to perform if he extends his arm at shoulder height, makes a fist with his hand, and sticks his/her thumb up? a. Boom down b. Swing c. Boom up d. Extend boom - Answer -c. 2. When hoisting personnel, within what percentage of level must a telescopic boom crane be in order for the gross ratings in the load chart to remain valid? a. 1%...
    (0)
  • $12.49
  • + learn more
NCCCO MOBILE CRANE EXAM QUESTIONS AND ANSWERS LATEST UPDATE 2024/2025 (100% VERIFIED)
  • NCCCO MOBILE CRANE EXAM QUESTIONS AND ANSWERS LATEST UPDATE 2024/2025 (100% VERIFIED)

  • Exam (elaborations) • 12 pages • 2024
  • Available in package deal
  • NCCCO MOBILE CRANE EXAM QUESTIONS AND ANSWERS LATEST UPDATE 2024/2025 (100% VERIFIED) When hoisting personnel, within what percentage of level must a telescopic boom crane be in order for the gross ratings in the load chart to remain valid? a. 1% b. 2% c. 5% d. 8% correct answers a. 3. The load line of the crane you're operating contacts an energized power line. There's no sign of any other danger, such as fire. What should you do? a. Climb down carefully from the crane cab b. Jump do...
    (0)
  • $14.99
  • + learn more
NCCCO MOBILE CRANE EXAM QUESTIONS AND ANSWERS LATEST UPDATE 2024/2025 (100% CORRECT)
  • NCCCO MOBILE CRANE EXAM QUESTIONS AND ANSWERS LATEST UPDATE 2024/2025 (100% CORRECT)

  • Exam (elaborations) • 12 pages • 2024
  • Available in package deal
  • NCCCO MOBILE CRANE EXAM QUESTIONS AND ANSWERS LATEST 2024/2025 (100% CORRECT) When hoisting personnel, within what percentage of level must a telescopic boom crane be in order for the gross ratings in the load chart to remain valid? a. 1% b. 2% c. 5% d. 8% correct answers a. 3. The load line of the crane you're operating contacts an energized power line. There's no sign of any other danger, such as fire. What should you do? a. Climb down carefully from the crane cab b. Jump down, feet...
    (0)
  • $14.49
  • + learn more
NCCCO Tower Crane Exam Questions and Answers Latest Update 2024/2025 (100% Correct)
  • NCCCO Tower Crane Exam Questions and Answers Latest Update 2024/2025 (100% Correct)

  • Exam (elaborations) • 16 pages • 2024
  • Available in package deal
  • NCCCO Tower Crane Exam Questions and Answers Latest Update 2024/2025 (100% Correct) Hydraulic systems should have their proper fluid level checked - ANSWER Daily If power fails during operations, the following shouldn't apply - ANSWER Do your best to finish moving load where it was designated to go If load is undetermined who is to find out if load weight does not exceed crane rating at radius at which the load is to be lifted - ANSWER Person responsible for lift Where should climbing inst...
    (0)
  • $14.99
  • + learn more
NCCCO MOBILE CRANE EXAM QUESTIONS AND ANSWERS LATEST 2024/2025 (100% CORRECT)
  • NCCCO MOBILE CRANE EXAM QUESTIONS AND ANSWERS LATEST 2024/2025 (100% CORRECT)

  • Exam (elaborations) • 12 pages • 2024
  • Available in package deal
  • NCCCO MOBILE CRANE EXAM QUESTIONS AND ANSWERS LATEST 2024/2025 (100% CORRECT) What action does a signal person intend the operator to perform if he extends his arm at shoulder height, makes a fist with his hand, and sticks his/her thumb up? a. Boom down b. Swing c. Boom up d. Extend boom correct answers c. 2. When hoisting personnel, within what percentage of level must a telescopic boom crane be in order for the gross ratings in the load chart to remain valid? a. 1% b. 2% c. 5% d. 8%...
    (0)
  • $14.99
  • + learn more
NCCCO MOBILE CRANE EXAM | Questions and Correct Solutions | Latest Update 2024/2025 | Graded A+
  • NCCCO MOBILE CRANE EXAM | Questions and Correct Solutions | Latest Update 2024/2025 | Graded A+

  • Exam (elaborations) • 21 pages • 2024
  • Available in package deal
  • NCCCO MOBILE CRANE EXAM | Questions and Correct Solutions | Latest Update 2024/2025 | Graded A+ 1. What action does a signal person intend the operator to perform if he extends his arm at shoulder height, makes a fist with his hand, and sticks his/her thumb up? a. Boom down b. Swing c. Boom up d. Extend boom - Answer -c. 2. When hoisting personnel, within what percentage of level must a telescopic boom crane be in order for the gross ratings in the load chart to remain valid? a. 1%...
    (0)
  • $10.99
  • + learn more
NCCCO 8 exam | Questions and Correct Solutions | Latest Update 2024/2025 | Graded A+
  • NCCCO 8 exam | Questions and Correct Solutions | Latest Update 2024/2025 | Graded A+

  • Exam (elaborations) • 6 pages • 2024
  • Available in package deal
  • NCCCO 8 exam | Questions and Correct Solutions | Latest Update 2024/2025 | Graded A+ According to OSHA, what clearance should a crane in transit keep while going under 445KV lines? - Answer -16 feet While operating a crane near 280KV powerlines, what distance does OSHA require you to keep? - Answer -17 feet 8 inches When working around power lines you must: - Answer -Avoid stockpile material under powerlines Maintain the correct distance according to the rated K.V. Ground the crane w...
    (0)
  • $10.99
  • + learn more
NCCCO Tower Crane Exam Questions and Answers Latest Update 2024/2025 (100% Verified)
  • NCCCO Tower Crane Exam Questions and Answers Latest Update 2024/2025 (100% Verified)

  • Exam (elaborations) • 16 pages • 2024
  • Available in package deal
  • If load is undetermined who is to find out if load weight does not exceed crane rating at radius at which the load is to be lifted - ANSWER Person responsible for lift Where should climbing instructions be kept - ANSWER ON Site All climbing operations shall be performed under the supervision of - ANSWER Qualified person When cranes are erected, load limiting devices shall be tested for proper setting and operation - ANSWER Before crane is placed in service Hooks shall be equipped with lat...
    (0)
  • $14.99
  • + learn more