Hvac nate heat pump exam - Study guides, Class notes & Summaries
Looking for the best study guides, study notes and summaries about Hvac nate heat pump exam? On this page you'll find 78 study documents about Hvac nate heat pump exam.
All 78 results
Sort by
-
HVAC NATE Heat Pump Exam (Latest 2024/ 2025 Update) 100% Correct Questions and Verified Answers| Grade A
- Exam (elaborations) • 35 pages • 2024
- Available in package deal
-
- $10.99
- 1x sold
- + learn more
HVAC NATE Heat Pump Exam (Latest 2024/ 2025 Update) 100% Correct Questions and Verified Answers| Grade A 
 
Q: What is the absolute pressure at sea level if a gauge pressure is 35 psig? 
 
 
Answer: 
 49.7psia 
 
 
 
Q: 100,000 BTUH output furnace. 
Return air temp is 65F. 
Supply air is 135F. 
What is the CFM? 
 
 
Answer: 
 1323CFM 
 
 
 
Q: What is the best method of repair when a residential supply diffuser is noisy because of a loose vane? 
 
 
Answer: 
 Replace the diffuser. 
 
 
 
Q: When...
-
HVAC NATE Heat Pump Exam 2024 Questions and Answers (2024/2025) (Verified Answers)q1
- Exam (elaborations) • 39 pages • 2023
-
- $12.49
- 1x sold
- + learn more
HVAC NATE Heat Pump Exam 2024 Questions and Answers (2024/2025) (Verified Answers)q1
-
HVAC NATE Heat Pump Exam (Latest 2024 / 2025 Update) 100% Correct Questions and Verified Answers | Grade A
- Exam (elaborations) • 50 pages • 2024
- Available in package deal
-
- $7.99
- + learn more
HVAC NATE Heat Pump Exam (Latest 2024 / 2025 Update) 100% Correct Questions and Verified Answers | Grade A 
 
 
 
Question: 
What is the capability of electronic programmable room thermostat to reset the set point early so that the space temperature reaches a set temperature at a specific time called? 
Answer: 
Computed recovery 
 
 
Question: 
What is an important reason for using electronic controls? 
Answer: 
They can make decisions based on many inputs. 
 
 
 
 
 
Question: 
When using a dou...
-
HVAC NATE Heat Pump Exam (New 2024/ 2025 Update) Questions and Verified Answers 100% Correct | A Grade
- Exam (elaborations) • 39 pages • 2024
- Available in package deal
-
- $10.99
- + learn more
HVAC NATE Heat Pump Exam (New 2024/ 
2025 Update) Questions and Verified 
Answers 100% Correct | A Grade 
 
QUESTION 
 
 In order to troubleshoot a load controlled by a control string, what should the technician check 
first? 
 
 
Answer: 
 Proper voltage applied across the load. 
 
 
 
QUESTION 
 The technician suspects that an outdoor thermostat used to bring on auxiliary heat may be out of 
calibration. The thermostat is a close-on-fall type that is adjustable. What is one method for 
...
-
HVAC NATE Heat Pump Exam 2024
- Exam (elaborations) • 24 pages • 2024
- Available in package deal
-
- $10.49
- + learn more
HVAC NATE Heat Pump Exam 2024...
Get paid weekly? You can!
-
HVAC NATE Heat Pump Exam 2024 Correctly Answered!
- Exam (elaborations) • 17 pages • 2023
- Available in package deal
-
- $10.49
- + learn more
HVAC NATE Heat Pump Exam 2024 Correctly Answered! 
On an R-22 system, line diameters and lengths are typically specified for a vapor pressure drop that does not exceed what? - ANSWER 6-7PSI or 6F
-
HVAC NATE Heat Pump Exam Questions With Correct Answers Updated 2024/2025 (Graded A+)
- Exam (elaborations) • 19 pages • 2024
- Available in package deal
-
- $15.49
- + learn more
HVAC NATE Heat Pump Exam Questions With Correct Answers Updated 2024/2025 (Graded A+) What is the primary purpose of using flux when soldering copper or brass parts? -Ans 
Prevent Oxidation 
The water that results from a defrost cycle of an air to air heat pump(runoff) must? -Ans 
Drain off and away from the outdoor coil. 
Why must the runoff be drained off and away from the outdoor coil? -AnsExcessive ice can 
build up on the bottom of the coil and can reduce capacity. 
What is the component th...
-
HVAC NATE Heat Pump Exam Questions and Answers 100% Pass
- Exam (elaborations) • 19 pages • 2024
-
- $12.49
- + learn more
HVAC NATE Heat Pump Exam Questions and 
Answers 100% Pass 
On an R-22 system, line diameters and lengths are typically specified for a vapor 
pressure drop that does not exceed what? -Answer-6-7PSI or 6F 
What is the primary purpose of using flux when soldering copper or brass parts? - 
Answer-Prevent Oxidation 
The water that results from a defrost cycle of an air to air heat pump(runoff) must? - 
Answer-Drain off and away from the outdoor coil. 
Why must the runoff be drained off and away from...
-
HVAC NATE Heat Pump Exam (Latest 2024/ 2025 Update) 100% Correct Questions and Verified Answers| Grade A
- Exam (elaborations) • 8 pages • 2024
- Available in package deal
-
- $10.49
- + learn more
HVAC NATE Heat Pump Exam (Latest 2024/ 2025 Update) 100% Correct Questions and Verified Answers| Grade A
-
HVAC NATE Heat Pump Exam Questions With Correct Answers Updated 2024/2025 (Graded A+)
- Exam (elaborations) • 19 pages • 2024
- Available in package deal
-
- $17.49
- + learn more
HVAC NATE Heat Pump Exam Questions With Correct Answers Updated 2024/2025 (Graded A+) What is the primary purpose of using flux when soldering copper or brass parts? -Ans 
Prevent Oxidation 
The water that results from a defrost cycle of an air to air heat pump(runoff) must? -Ans 
Drain off and away from the outdoor coil. 
Why must the runoff be drained off and away from the outdoor coil? -AnsExcessive ice can 
build up on the bottom of the coil and can reduce capacity. 
What is the component th...
That summary you just bought made someone very happy. Also get paid weekly? Sell your study resources on Stuvia! Discover all about earning on Stuvia