Cosc 275 detailed exam - Study guides, Class notes & Summaries
Looking for the best study guides, study notes and summaries about Cosc 275 detailed exam? On this page you'll find 11 study documents about Cosc 275 detailed exam.
All 11 results
Sort by
-
COSC 275 Exam 1 Palmer Questions and Answers fully solved 2023
- Exam (elaborations) • 10 pages • 2023
- Available in package deal
-
- $30.49
- 3x sold
- + learn more
COSC 275 Exam 1 Palmer Questions and Answers fully solved 2023 
Estimating: 
The process of determining the anticipated cost of materials, labor, and equipment of a proposed project. 
 
 
 
Take-off: 
The process in which detailed lists are compiled, based on drawings and specifications, of all the material and equipment necessary to construct a project. The cost estimator uses this list to calculate how much it will cost to build the project. 
 
 
 
Quantities: 
Measured amounts of construction...
-
COSC 275 Detailed Exam With Complete Solution
- Exam (elaborations) • 31 pages • 2024
- Available in package deal
-
- $14.99
- + learn more
COSC 275 Detailed Exam With Complete Solution...
-
COSC 275 Exam 1 Palmer Questions with verified Answers fully solved 2024
- Exam (elaborations) • 14 pages • 2024
-
- $27.99
- + learn more
COSC 275 Exam 1 Palmer Questions with verified Answers fully solved 2024 
 
1.	Estimating- Correct Answer - The process of determining the anticipated cost of materials, labor, and equipment of a proposed project. 
2.	Take-off- Correct Answer - The process in which detailed lists are compiled, based on drawings and specifications, of all the material and equipment necessary to construct a project. The cost estimator uses this list to calculate how much it will cost to build the project.
-
COSC 275 Final Exam Palmer; Questions and Answers % Correct
- Exam (elaborations) • 16 pages • 2024
- Available in package deal
-
- $12.99
- + learn more
COSC 275 Final Exam Palmer; Questions and 
Answers % Correct 
Estimating Correct answer-The process of determining the anticipated cost of materials, 
labor, and equipment of a proposed project. 
Take-off Correct answer-The process in which detailed lists are compiled, based on 
drawings and specifications, of all the material and equipment necessary to construct a project. 
The cost estimator uses this list to calculate how much it will cost to build the project
-
COSC 275 Exam 1 Palmer | Latest Update | 2024/2025 | Rated A+
- Exam (elaborations) • 21 pages • 2024
- Available in package deal
-
- $9.73
- + learn more
COSC 275 Exam 1 Palmer | Latest 
Update | 2024/2025 | Rated A+ 
 
Liquid Limit: 
(LL) is the moisture content expressed as a percentage of the weight of oven dried soil, at which 
soil changes from a plastic to a liquid state. 
Plasticity Index: 
Range of moisture in which a soil remains in a plastic state, while passing from a semisolid state 
to a liquid state. 
Overburden: 
The soil above the layer or layers being investigated. The material (soil) that must be removed 
from subgrade to top of...
And that's how you make extra money
-
COSC 275 Final Exam Palmer Study Guide with Complete Solutions
- Exam (elaborations) • 14 pages • 2024
- Available in package deal
-
- $9.99
- + learn more
-
COSC 275 Final Exam Palmer Questions And Answers 100% Verified.
- Exam (elaborations) • 8 pages • 2024
- Available in package deal
-
- $11.49
- + learn more
COSC 275 Final Exam Palmer Questions 
And Answers 100% Verified. 
Estimating - answerThe process of determining the anticipated cost of materials, labor, and 
equipment of a proposed project. 
Take-off - answerThe process in which detailed lists are compiled, based on drawings and 
specifications, of all the material and equipment necessary to construct a project. The cost 
estimator uses this list to calculate how much it will cost to build the project. 
Quantities - answerMeasured amounts of c...
-
COSC 275 Palmer: Exam 1 Notes 2024
- Exam (elaborations) • 8 pages • 2024
-
- $12.49
- + learn more
COSC 275 Palmer: Exam 1 Notes 2024 
Estimating - Correct Answer️️ -The Process of determining the anticipated cost of 
material, labor and equipment of a proposed project. 
Take-off - Correct Answer️️ -The process in which detailed lists are compiled, based 
on drawings and specifications, of all the materials and equipment necessary to 
construct a project. The cost estimator uses this list to calculate how much it will cost to 
build the project. 
Quantities - Correct Answer️️ -Mea...
-
COSC 275 Final Exam Palmer Questions and Answers 100% Pass
- Exam (elaborations) • 11 pages • 2024
- Available in package deal
-
- $12.49
- + learn more
COSC 275 Final Exam Palmer Questions and 
Answers 100% Pass 
Estimating - Correct Answer️️ -The process of determining the anticipated cost of 
materials, labor, and equipment of a proposed project. 
Take-off - Correct Answer️️ -The process in which detailed lists are compiled, based 
on drawings and specifications, of all the material and equipment necessary to construct 
a project. The cost estimator uses this list to calculate how much it will cost to build the 
project. 
Quantities -...
-
Cosc 275 Exam Study Guide with Complete Solutions
- Exam (elaborations) • 5 pages • 2024
-
- $11.49
- + learn more
Cosc 275 Exam Study Guide with 
Complete Solutions 
estimating - Correct Answer️️ -The process of determining the anticipated cost of 
materials, labor, and equipment of a proposed project. 
take-off - Correct Answer️️ -The process in which detailed lists are compiled, based on 
drawings and specifications, of all the material and equipment necessary to construct a 
project. The cost estimator uses this list to calculate how much it will cost to build the 
project. 
quantities - Correct ...
Did you know that on average a seller on Stuvia earns $82 per month selling study resources? Hmm, hint, hint. Discover all about earning on Stuvia