Cosc 153 qa - Study guides, Class notes & Summaries

Looking for the best study guides, study notes and summaries about Cosc 153 qa? On this page you'll find 8 study documents about Cosc 153 qa.

All 8 results

Sort by

COSC 153 EXAM 1 Q&A 100% VERIFIED
  • COSC 153 EXAM 1 Q&A 100% VERIFIED

  • Exam (elaborations) • 16 pages • 2023
  • COSC 153 EXAM 1 Q&A 100% VERIFIED master builder - ANSWER In ancient Egypt, architecture, engineering, and construction were all the responsibility of one person, called? residential, commercial, heavy civil, industrial, & environmental - ANSWER 5 sectors of the construction industry? owner, designers, & contractors - ANSWER 3 primary players in an construction project? multi-family dwellings - ANSWER apartments, condos, & townhomes are referred to as? Architects & engineers - ANSWE...
    (0)
  • $9.99
  • + learn more
COSC 153 Midterm Q&A CORRECT  ANSWERS UPDATED
  • COSC 153 Midterm Q&A CORRECT ANSWERS UPDATED

  • Exam (elaborations) • 18 pages • 2023
  • COSC 153 Midterm Q&A CORRECT ANSWERS UPDATED Aggregate - ANSWER Mixture of sand and stone & is a major component of concrete Architect - ANSWER One who has completed a course of study in building and design and draws up plans Backing - ANSWER Frame lumber or metal installed between the wall studs to give additional support for drywall or an interior trim related item (such as handrail brackets, cabinets, towel bars). Items are screwed and mounted into solid wood or metal rather th...
    (0)
  • $10.99
  • + learn more
COSC 153 Midterm CORRECT  Q&A
  • COSC 153 Midterm CORRECT Q&A

  • Exam (elaborations) • 15 pages • 2023
  • COSC 153 Midterm CORRECT Q&A What are the construction industry sector's commercial, residential/multi family, specialty subcontractor, heavy civil infrastructure, industrial/oil and gas, consulting/facilities management/CM What are general contractors in construction in charge of overall project schedule, payment from owners and paying subcontractors, site logistics for all projects, coordination with owner, architects and engineers, coordination with owners representative residen...
    (0)
  • $9.99
  • + learn more
COSC 153 Exam 2 Q&A VERIFIED
  • COSC 153 Exam 2 Q&A VERIFIED

  • Exam (elaborations) • 6 pages • 2023
  • COSC 153 Exam 2 Q&A VERIFIED What are the 4 design stages? - ANSWER Programming Stage, Schematic Design, Design Development, Construction Documents Programing Stage - ANSWER Written statement of the requirements that identify important information. Happens prior to start Schematic Design - ANSWER Create a basic design identifying shape and size of spaces, as well as alternatives, types of product, and more involvement from designer Design Development - ANSWER Development of a design w...
    (0)
  • $7.99
  • + learn more
COSC 153 Q&A
  • COSC 153 Q&A

  • Exam (elaborations) • 7 pages • 2023
  • COSC 153 Q&A 6 main Construction Industry Sectors - ANSWER - Commercial - Residential/Multifamily - Specialty Subcontractor - Heavy Civil Infrastructure - Industrial / Oil & Gas - Consulting / Facilities - Management / CM General Contractors who may or may not self perform any actual construction work In charge of: - ANSWER - Overall Project Schedule - Payment from Owners and paying subcontractors - Site Logistics for all project - Overall safety of workers - Coordination with Owner...
    (0)
  • $7.99
  • + learn more
COSC 153 – final Q&A  Correctly Answered
  • COSC 153 – final Q&A Correctly Answered

  • Exam (elaborations) • 9 pages • 2023
  • COSC 153 – final Q&A Correctly Answered Is Price a selection the ONLY consideration when using the Qualifications Based Selection? false (qualifications) Which construction phase has more subcontractors involved? interior A mixture of sand and stone and a major component of concrete is _____________ aggregate The amount of labor, materials, and other costs that a contractor anticipates for a project as summarized in the contractor's bid proposal for the project is called est...
    (0)
  • $8.99
  • + learn more
COSC 153 Q&A
  • COSC 153 Q&A

  • Exam (elaborations) • 3 pages • 2023
  • COSC 153 Q&A 6 main Construction Industry Sectors - ANSWER - Commercial - Residential/Multifamily - Specialty Subcontractor - Heavy Civil Infrastructure - Industrial / Oil & Gas - Consulting / Facilities - Management / CM General Contractors who may or may not self perform any actual construction work In charge of: - ANSWER - Overall Project Schedule - Payment from Owners and paying subcontractors - Site Logistics for all project - Overall safety of workers - Coordination with Owner...
    (0)
  • $5.99
  • + learn more
COSC 153: Exam I Q&A 1005 Correct
  • COSC 153: Exam I Q&A 1005 Correct

  • Exam (elaborations) • 4 pages • 2023
  • COSC 153: Exam I Q&A 1005 Correct The Master Builder - ANSWER there was no distinction between the architect, engineer and builder, it was one person that did it all open bid - ANSWER used for public projects; the project must be publicly advertised and anybody can submit a bid; typically has bonds to ensure the contactor will be able to perform the work public work - ANSWER initiated by government agencies; funded by tax dollars private work - ANSWER funding comes from private sources...
    (0)
  • $6.99
  • + learn more