Basic rigging - Study guides, Class notes & Summaries

Looking for the best study guides, study notes and summaries about Basic rigging? On this page you'll find 446 study documents about Basic rigging.

All 446 results

Sort by

PATHFINDER WRITTEN SLING LOAD EXAM 2024 ACTUAL QUESTIONS AND ANSWERS SOLVED AND VERIFIED 100% Popular
  • PATHFINDER WRITTEN SLING LOAD EXAM 2024 ACTUAL QUESTIONS AND ANSWERS SOLVED AND VERIFIED 100%

  • Exam (elaborations) • 14 pages • 2024
  • PATHFINDER WRITTEN SLING LOAD EXAM 2024 ACTUAL QUESTIONS AND ANSWERS SOLVED AND VERIFIED 100% Which reference covers Basic Sling Load Operations and Equipment? Ans- TM 4-48.09 Which reference covers Single Point Sling Load Rigging Procedures? Ans- TM 4-48.10 Which reference covers Dual Point Sling Load Rigging Procedures? Ans- TM 4-48.11 Which reference covers Pathfinder Operations? Ans- FM 3-21.38 Which reference covers Airdrop Platform Rigging Procedures? Ans- FM 4-20....
    (1)
  • $13.99
  • 5x sold
  • + learn more
Boilermaker NCCR Test   Questions And Answers Popular
  • Boilermaker NCCR Test Questions And Answers

  • Exam (elaborations) • 10 pages • 2024 Popular
  • Boilermaker NCCR Test Questions And Answers Boilermaker NCCR Test 1 ft 3-3/4 in + 2 ft 1-1/16 in +5 ft 10- 7/8 in = - ANS 9 ft 3-11/16 in A 1-inch plate is to be cut. Why should an acetylene gerulator on a cutting rig not be adjusted over 15 PSI? - ANS Acetylene is unstable above this pressure A big control valve is pulled who is responsible for the rigging? - ANS Crane operator and rigger A boiler maker must have all of the following wh...
    (0)
  • $10.99
  • 2x sold
  • + learn more
NCCER Module 6- Introduction to Basic Rigging Test with correct Answers |Latest 2024/2025
  • NCCER Module 6- Introduction to Basic Rigging Test with correct Answers |Latest 2024/2025

  • Exam (elaborations) • 13 pages • 2024
  • Available in package deal
  • NCCER Module 6- Introduction to Basic Rigging Test with correct Answers |Latest 2024/2025
    (0)
  • $9.99
  • 1x sold
  • + learn more
Module 6 NCCER into to Basic rigging questions with correct answers
  • Module 6 NCCER into to Basic rigging questions with correct answers

  • Exam (elaborations) • 6 pages • 2023
  • During a rigging operation if an emergency happens who has the authority to give the emergency stop hand signal? CORRECT ANSWER (Anyone on the ground who is in sight of the crane operator). The recommendation when lifting a load longer then __________ is to use two choker hitches. CORRECT ANSWER (12 feet) A hand-operated winching device that should never be used for vertical overhead lifting is a (CORRECT ANSWER come-along All chain hoists use a ____________ to lift heavy loads. CORRECT...
    (2)
  • $7.99
  • 9x sold
  • + learn more
Module 6-----NCCER Introduction to Basic Rigging Test Review Questions And Answers
  • Module 6-----NCCER Introduction to Basic Rigging Test Review Questions And Answers

  • Exam (elaborations) • 2 pages • 2024
  • Available in package deal
  • Module 6-----NCCER Introduction to Basic Rigging Test Review Questions And Answers The main connection fitting for chain slings is the - ANS master link To form an endless-loop web sling, you must ----------- the ends together - ANS splice A ---------- is the distance it takes for one strand of wire rope that makes a complete turn around the core. - ANS one-rope lay A pulley system that has a mechanical advantage for lifting a load is a - ANS hoist A -------------- is...
    (0)
  • $8.49
  • 1x sold
  • + learn more
Basic Rigging - Trade Terms with  Verified Solutions
  • Basic Rigging - Trade Terms with Verified Solutions

  • Exam (elaborations) • 9 pages • 2024
  • Available in package deal
  • Basic Rigging - Trade Terms with Verified Solutions What is the purpose of a tagline in rigging operations? A tagline helps control the movement and position of a load during lifting, enhancing safety and precision. Explain the role of a snatch block in a rigging setup. A snatch block changes the direction of a pull and can effectively double the lifting capacity of a rigging system. How can the center of gravity affect load stability during rigging? The center of gravity determ...
    (0)
  • $7.99
  • + learn more
NCCER INTRO TO BASIC RIGGING EXAM QUESTIONS AND ANSWERS LATEST UPDATE 2024 GRADED A+.
  • NCCER INTRO TO BASIC RIGGING EXAM QUESTIONS AND ANSWERS LATEST UPDATE 2024 GRADED A+.

  • Exam (elaborations) • 9 pages • 2024
  • Available in package deal
  • NCCER INTRO TO BASIC RIGGING EXAM QUESTIONS AND ANSWERS LATEST UPDATE 2024 GRADED A+. The recommendation when lifting a load longer then __________ is to use two chokerhitches. (12 feet) A hand-operated winching device that should never be used for vertical overhead liftingis a ( come-along All chain hoists use a ____________ to lift heavy loads. (gear systems) A _____________ is used on alloy steel chain slings. (Grab Hook) Shackles for most overhead lifting are made of _________ due to...
    (0)
  • $12.49
  • + learn more
NCCER module 6 (intro to basic rigging) Questions and Answers Rated A
  • NCCER module 6 (intro to basic rigging) Questions and Answers Rated A

  • Exam (elaborations) • 2 pages • 2023
  • Available in package deal
  • NCCER module 6 (intro to basic rigging) Questions and Answers Rated A the max load weight that a sling is designed to carry is the? rated capacity most alloy steel chain slings can be used in Temps up to? 500°F (260°c) when a tattle tail has been pulled into the jacket of a synthetic sling, the sling most likely has been? overloaded if a wire rope sling appears to be damaged the decision to keep it in service must be made by a? competent person because of the need for increased toughness, ...
    (0)
  • $9.99
  • 1x sold
  • + learn more
Module 6 NCCER into to Basic rigging|A+ Graded
  • Module 6 NCCER into to Basic rigging|A+ Graded

  • Exam (elaborations) • 5 pages • 2024
  • Module 6 NCCER into to Basic rigging|A+ Graded During a rigging operation if an emergency happens who has the authority to give theemergency stop hand signal? (Anyone on the ground who is in sight of the craneoperator). The recommendation when lifting a load longer then __________ is to use two chokerhitches. (12 feet) A hand-operated winching device that should never be used for vertical overhead liftingis a ( come-along All chain hoists use a ____________ to lift heavy loads...
    (0)
  • $10.59
  • + learn more
NCCER MODULE 6 INTRO TO BASIC RIGGING QUESTIONS AND ANSWERS LATEST UPDATE 2024/2025 GRADED A+.
  • NCCER MODULE 6 INTRO TO BASIC RIGGING QUESTIONS AND ANSWERS LATEST UPDATE 2024/2025 GRADED A+.

  • Exam (elaborations) • 9 pages • 2024
  • NCCER MODULE 6 INTRO TO BASIC RIGGING QUESTIONS AND ANSWERS LATEST UPDATE 2024/2025 GRADED A+. During a rigging operation if an emergency happens who has the authority to give theemergency stop hand signal? (Anyone on the ground who is in sight of the craneoperator). The recommendation when lifting a load longer then __________ is to use two chokerhitches. (12 feet) A hand-operated winching device that should never be used for vertical overhead liftingis a ( come-along All chain hoists us...
    (0)
  • $12.49
  • + learn more
NCCER INTO TO BASIC RIGGING QUESTIONS AND ANSWERS LATEST UPDATE 2024 GRADED A+.
  • NCCER INTO TO BASIC RIGGING QUESTIONS AND ANSWERS LATEST UPDATE 2024 GRADED A+.

  • Exam (elaborations) • 9 pages • 2024
  • Available in package deal
  • NCCER INTO TO BASIC RIGGING QUESTIONS AND ANSWERS LATEST UPDATE 2024 GRADED A+. Module 6 NCCER into to Basic rigging During a rigging operation if an emergency happens who has the authority to give theemergency stop hand signal? (Anyone on the ground who is in sight of the craneoperator). The recommendation when lifting a load longer then __________ is to use two chokerhitches. (12 feet) A hand-operated winching device that should never be used for vertical overhead liftingis a ( come-alo...
    (0)
  • $10.99
  • + learn more