Asme codes - Study guides, Class notes & Summaries
Looking for the best study guides, study notes and summaries about Asme codes? On this page you'll find 151 study documents about Asme codes.
All 151 results
Sort by
-
2023 update ASME CSD-1 codes Questions and Answers
- Exam (elaborations) • 1 pages • 2023
- Available in package deal
-
- $10.49
- 1x sold
- + learn more
2023 update ASME CSD-1 codes Questions and Answers 
When a lower water fuel cut off has activated on a hot water heating boiler, what happens ? 
Causes a safety shutdown and lockout, requiring a manual reset 
 
 
 
The Mechanical Inspection Bureau incorporates by reference various codes, standards and practices. Once specific safety practice incorporated by reference for licensed operators specifies and identifies one called a qualified individual. How is the qualified individual identified in t...
-
Kentucky Boiler Exam KRS 236
- Exam (elaborations) • 8 pages • 2023
-
- $10.99
- 1x sold
- + learn more
Boiler - Answer- Closed vessel in which water or other liquid is heated 
 
Power Boiler - Answer- Steam or vapor is generated <15psig 
 
High Pressure / Temperature Water Boiler - Answer- Pressures exceed 160 psig or Temp above 250 F 
 
Heating Boiler - Answer- Steam or vapor boiler operating under 15 psig not to exceed 250 F 
 
Portable Boiler - Answer- Temporary Location Usage: Construction 
 
Pressure Vessel - Answer- Vessel in which pressure is obtained from external sources 
 
ASME - Ans...
-
2024 update ASME CSD-1 codes Exam Answers.
- Exam (elaborations) • 2 pages • 2024
-
- $15.49
- + learn more
2024 update ASME CSD-1 codes Exam Answers.2024 update ASME CSD-1 codes Exam Answers.
-
Mark's API 510 STUDY GUIDE QUESTIONS WITH VERIFIED SOLUTIONS
- Exam (elaborations) • 152 pages • 2024
- Available in package deal
-
- $12.49
- + learn more
Mark's API 510 STUDY GUIDE 
QUESTIONS WITH VERIFIED 
 
SOLUTIONS 
 
Which of the following activities is NOT included in the scope of API 510? 
- A) rerating a vessel 
- B) Operating a vessel. 
- C) replacing a vessel head 
- D) internally inspecting a vessel B 
 
Which of the following activities is NOT included in the scope of API 510? 
- A) setting relief device intervals 
- B) performing vessel alterations 
- C) Performing vessel fabrication 
- D) performing vessel maintenance C 
 
Which of...
-
ASME B31.3 Practice Questions Latest Update with Verified Solutions
- Exam (elaborations) • 24 pages • 2024
-
- $9.99
- + learn more
ASME B31.3 Practice Questions Latest Update with Verified Solutions 
The requirements of the latest edition of ASME Code Section B31.3 and any subsequent Addenda: 
a. must be followed explicitly as soon as the latest edition is issued. 
b. are retroactive and all piping installed per earlier additions must be upgraded. 
c. are not retroactive & all piping installed per earlier additions need not be upgraded. d. may be used without regard to the acceptability of Code revisions to the jurisdiction...
Want to regain your expenses?
-
API 653 Closed book quiz latest 2024 already passed
- Exam (elaborations) • 86 pages • 2024
- Available in package deal
-
- $11.99
- + learn more
API 653 Closed book quiz latest 2024 
 
already passed 
 
API 653 covers which of the following types of tanks? 
A) Carbon and low alloy steel tanks built to ASME Section VIII, Div. 1 
B) Carbon and low alloy steel tanks built to ASME Section X 
C) Carbon and low alloy steel tanks built to API 650 and 12C 
D) Carbon and low alloy steel tanks built to API 510 C 
 
API 653 provides the requirements for construction of which of the following? 
A) Process pressure vessels 
B) Aboveground petroleum s...
-
Mark's API 510 STUDY GUIDE QUESTIONS AND ANSWERS GRADED A 2024 COMPLETELY SOLVED 100%
- Exam (elaborations) • 62 pages • 2024
- Available in package deal
-
- $13.99
- + learn more
Which of the following activities is NOT included in the scope of API 510? 
- A) rerating a vessel 
- B) Operating a vessel. 
- C) replacing a vessel head 
- D) internally inspecting a vessel - B 
 
Which of the following activities is NOT included in the scope of API 510? 
- A) setting relief device intervals 
- B) performing vessel alterations 
- C) Performing vessel fabrication 
- D) performing vessel maintenance - C 
 
Which of the following equipment types is NOT covered by API 510? 
a) Hea...
-
2a Hoisting license latest version graded A+
- Exam (elaborations) • 23 pages • 2024
- Available in package deal
-
- $9.99
- + learn more
2a Hoisting license latest version 
 
graded A+ 
 
What is the purpose of the swing gear on an excavator It connects the car body to the tracks 
 
Who is responisble for inspecting a trench before anyone goes in it The equipment operator 
 
What is the prefered sling angle 60* 
 
The top of the spoil pile is called The crown 
 
A four footbdeep trench requires an additional ladder for each _ of open trench 25ft 
 
Materials mist be kept back from the edge of the trenxh a minimum of Two feet 
 
W...
-
API 653 Closed book quiz with 100% Correct
- Exam (elaborations) • 66 pages • 2024
-
- $13.49
- + learn more
API 653 Closed book quiz with 100% Correct 
API 653 covers which of the following types of tanks? 
A) Carbon and low alloy steel tanks built to ASME Section VIII, Div. 1 
B) Carbon and low alloy steel tanks built to ASME Section X 
C) Carbon and low alloy steel tanks built to API 650 and 12C 
D) Carbon and low alloy steel tanks built to API 510 - Correct Answer ️️ -C 
API 653 provides the requirements for construction of which of the following? 
A) Process pressure vessels 
B) Aboveground pe...
-
API 653 FINAL EXAM QUESTIONS AND ANSWERS GRADED A+
- Exam (elaborations) • 45 pages • 2024
- Available in package deal
-
- $17.99
- + learn more
API 653 FINAL EXAM QUESTIONS AND 
ANSWERS GRADED A+ 
SECTION 1,,2,3 
API-653 covers which of the following types of tanks? 
a) Carbon and low alloy steel tanks built to ASME Section VIII, Div.1 
b) Carbon and low alloy steel tanks built to ASME Section X 
c) Carbon and low alloy steel tanks built to API - 650 and 12C 
d) Carbon and low alloy steel tanks built to API - 510 - ANSWERS C 
API-653 provides the requirements for construction of which of the following? 
a) Process pressure vessels 
b) ...
How much did you already spend on Stuvia? Imagine there are plenty more of you out there paying for study notes, but this time YOU are the seller. Ka-ching! Discover all about earning on Stuvia