AIC PREP UH EXAM GUIDE 2024/ACTUAL 200 EXAM QUESTIONS WITH CORRECT DETAILED AND VERIFIED ANSWERS/LATEST UPDATE 2024-2025
- Exam (elaborations) • 59 pages • 2024
-
- $19.99
- + learn more
AIC PREP UH EXAM GUIDE 2024/ACTUAL 200 EXAM QUESTIONS WITH CORRECT DETAILED AND VERIFIED ANSWERS/LATEST UPDATE
-
AIC Prep UH EXAM GUIDE QUESTIONS AND ANSWERS GRADED A 2024
- Exam (elaborations) • 32 pages • 2024
- Available in package deal
-
- $11.49
- + learn more
A 'place concrete' activity requires the placement of 2080 cubic yards. If the individual production rate is 2 cubic yards per work hour per person, with a 10-person crew and 8 hour workday, how many days are needed to complete this activity? 
a. 13 
b. 26 
c. 104 
d. 130 - a. 13 
 
A topographical map is a drawing showing? 
a. Subsurface soil conditions 
 b. A general profile view of the site 
c. Contour lines and elevations d. Cross sections along the length of the project - c. Contour...
-
AIC PREP UH EXAM | QUESTIONS & ANSWERS (VERIFIED) | LATEST UPDATE | GRADED A+
- Exam (elaborations) • 68 pages • 2024
- Available in package deal
-
- $15.49
- + learn more
1 
AIC PREP UH EXAM | QUESTIONS & 
ANSWERS (VERIFIED) | LATEST UPDATE | 
GRADED A+ 
A 'place concrete' activity requires the placement of 2080 cubic yards. If the individual 
production rate is 2 cubic yards per work hour per person, with a 10-person crew and 8 
hour workday, how many days are needed to complete this activity? 
a. 13 
b. 26 
c. 104 
d. 130 
Correct Answer: a. 13 
A topographical map is a drawing showing? 
a. Subsurface soil conditions 
b. A general profile view of th...
-
AIC PREP UH EXAM | QUESTIONS & ANSWERS (VERIFIED) | LATEST UPDATE | GRADED A+
- Exam (elaborations) • 68 pages • 2024
- Available in package deal
-
- $15.49
- + learn more
AIC PREP UH EXAM | QUESTIONS & 
ANSWERS (VERIFIED) | LATEST UPDATE | 
GRADED A+ 
A 'place concrete' activity requires the placement of 2080 cubic yards. If the individual 
production rate is 2 cubic yards per work hour per person, with a 10-person crew and 8 
hour workday, how many days are needed to complete this activity? 
a. 13 
b. 26 
c. 104 
d. 130 
Correct Answer: a. 13 
A topographical map is a drawing showing? 
a. Subsurface soil conditions 
b. A general profile view of the s...