A ust site - Study guides, Class notes & Summaries

Looking for the best study guides, study notes and summaries about A ust site? On this page you'll find 317 study documents about A ust site.

All 317 results

Sort by

ICC California UST Inspector Exam Questions and Answers 100% Correct 202425 Version. Popular
  • ICC California UST Inspector Exam Questions and Answers 100% Correct 202425 Version.

  • Exam (elaborations) • 84 pages • 2024
  • Available in package deal
  • ICC California UST Inspector Exam Questions and Answers 100% Correct 202425 Version. Which agency approves a site-specific variance which allows for an alternative method of construction or monitoring: a.) The Regional Water Quality Board b.) The State Water Resources Control Board c.) The Department of Toxic Substance Control d.) The local agency a.) The Regional Water Quality Board CCR Title 23, Sec 2681(a) The regulations to enforce compliance of underground storage tank...
    (0)
  • $15.54
  • 3x sold
  • + learn more
WA UST Site Assessor Exam Questions and Answers Graded A
  • WA UST Site Assessor Exam Questions and Answers Graded A

  • Exam (elaborations) • 12 pages • 2023
  • Available in package deal
  • WA UST Site Assessor Exam Questions and Answers Graded A What is the hold time for soil and preserved GW GRO samples? 14 days Is an ICC certification needed to install an AST? No Flammability limits of gasoline 1.4 to 7.6% How many days do you have from a tank closure to report/provide the UST checklist to ECY? 30 days MTCA Method A lead CUL, soil 250 mg/kg MTCA Method A lead CUL, GW 15 ug/L Is the vadose zone saturated or unsaturated? Unsaturated List in order of most mobile to least mob...
    (0)
  • $9.99
  • 1x sold
  • + learn more
WA UST Site Assessor Exam Questions With Complete Solutions | 100% Pass
  • WA UST Site Assessor Exam Questions With Complete Solutions | 100% Pass

  • Exam (elaborations) • 7 pages • 2024
  • Available in package deal
  • What is the hold time for soil and preserved GW GRO samples? - 14 days Is an ICC certification needed to install an AST? - No Flammability limits of gasoline - 1.4 to 7.6% How many days do you have from a tank closure to report/provide the UST checklist to ECY? - 30 days MTCA Method A lead CUL, soil - 250 mg/kg MTCA Method A lead CUL, GW - 15 ug/L Is the vadose zone saturated or unsaturated? - Unsaturated List in order of most mobile to least mobile: Bunker C, heating oil, diesel, gasoli...
    (1)
  • $12.48
  • 1x sold
  • + learn more
WA UST Site Assessor Exam
  • WA UST Site Assessor Exam

  • Exam (elaborations) • 6 pages • 2023
  • Available in package deal
  • What is the hold time for soil and preserved GW GRO samples? - Answer- 14 days Is an ICC certification needed to install an AST? - Answer- No Flammability limits of gasoline - Answer- 1.4 to 7.6% How many days do you have from a tank closure to report/provide the UST checklist to ECY? - Answer- 30 days MTCA Method A lead CUL, soil - Answer- 250 mg/kg MTCA Method A lead CUL, GW - Answer- 15 ug/L Is the vadose zone saturated or unsaturated? - Answer- Unsaturated List in order ...
    (0)
  • $10.99
  • 1x sold
  • + learn more
UST Test Questions And Answers Latest Updated 2024/2025 (Graded A+)
  • UST Test Questions And Answers Latest Updated 2024/2025 (Graded A+)

  • Exam (elaborations) • 46 pages • 2024
  • Available in package deal
  • UST Test Questions And Answers Latest Updated 2024/2025 (Graded A+) The regulations to enforce compliance of underground storage tank systems in the state are found in? a.) Code of Federal Regulations, 40 CFR Part 281 b.) California Code of Regulations, Title 23, Chapter 16 c.) Code of Federal Regulations, 40 CFR Part 280 d.) California Code of Regulations, Title 23, Chapter 17 - Correct answer b.) California Code of Regulations; Title 23, Chapter 16 2) By definition an "underground stor...
    (0)
  • $18.49
  • 1x sold
  • + learn more
WA UST Site Assessor Exam Questions and Answers 2023 with complete solution
  • WA UST Site Assessor Exam Questions and Answers 2023 with complete solution

  • Exam (elaborations) • 8 pages • 2023
  • Available in package deal
  • WA UST Site Assessor Exam Questions and Answers 2023 with complete solution What is the hold time for soil and preserved GW GRO samples? Ans 14 days Is an ICC certification needed to install an AST? Ans No Flammability limits of gasoline Ans 1.4 to 7.6% How many days do you have from a tank closure to report/provide the UST checklist to ECY? Ans 30 days MTCA Method A lead CUL, soil Ans 250 mg/kg MTCA Method A lead CUL, GW Ans 15 ug/L Is the vadose zone saturated or uns...
    (0)
  • $9.49
  • 1x sold
  • + learn more
Kentucky UST Certification Test Prep | 160 Questions and Answers 100% Correct
  • Kentucky UST Certification Test Prep | 160 Questions and Answers 100% Correct

  • Exam (elaborations) • 29 pages • 2023
  • Available in package deal
  • Kentucky UST Certification Test Prep | 160 Questions and Answers 100% Correct
    (1)
  • $12.49
  • 2x sold
  • + learn more
Underground Storage Tank 86 Review | Questions with 100% Correct Answers | Verified
  • Underground Storage Tank 86 Review | Questions with 100% Correct Answers | Verified

  • Exam (elaborations) • 9 pages • 2023
  • The Class A and Class B certification must be renewed every: - ️️5 years UST financial responsibility requirements apply to what? - ️️600 gallon used oil tank Secondary Containment is required for what? - ️️New UST Systems, Piping in contact with the ground, and Replacement UST A Class A operator shall maintain the records of UST site inspections for a *minimum* of: - ️️3 years New owners of an existing UST system shall register the UST system with DEQ/LARA within wha...
    (0)
  • $7.99
  • 1x sold
  • + learn more
Class A/B Operator for Underground Storage Tank questions and answers
  • Class A/B Operator for Underground Storage Tank questions and answers

  • Exam (elaborations) • 5 pages • 2024
  • Available in package deal
  • Class A/B Operator for Underground Storage Tank questions and answers The Class A and Class B certification must be renewed every: - 5 years UST financial responsibility requirements apply to what? - 600 gallon used oil tank Secondary Containment is required for what? - New UST Systems, Piping in contact with the ground, and Replacement UST A Class A operator shall maintain the records of UST site inspections for a *minimum* of: - 3 years New owners of an existing UST system shall regist...
    (0)
  • $10.49
  • 1x sold
  • + learn more