NICET LEVEL 1 HIGHWAY CONSTRUCTION EXAM QUESTIONS AND ANSWERS
- Exam (elaborations) • 10 pages • 2024
- Available in package deal
-
- $12.49
- 1x sold
- + learn more
NICET LEVEL 1 HIGHWAY CONSTRUCTION EXAM 
QUESTIONS AND ANSWERS 
Acceptance - Answer-The written acceptance by the Department of the Work. 
acceptance testing - Answer-Testing conducted by the Department to measure the 
degree of compliance to the Contract 
actual cost - Answer-The computed cost using calculations provided 
addendum - Answer-A Contract revision or response to a Contractor inquiry issued after 
advertisement and before the opening of bids. 
as-built quantity - Answer-The quantity ...
-
Nicet Highway Construction Level 2 Questions and Answers Already Passed
- Exam (elaborations) • 14 pages • 2023
- Available in package deal
-
- $9.99
- 1x sold
- + learn more
Nicet Highway Construction Level 2 Questions and Answers Already Passed 
What are the 5 types of bridge abutments? Closed Abutment, Stub or Perched Abutment, Pedestal or Spill-through Abutment, Integral End Bents, Mechanically Stabilized Abutment 
What is a "closed abutment"? A closed abutment is a full-height wall with wing walls on each side that retains the full height of the approach embankment. This type of abutment minimizes the required span length of the bridge. 
What is a stub or perc...
-
LARE Grading, Drainage, and Stormwater exam 2024/2025 with 100% correct answers
- Exam (elaborations) • 6 pages • 2024
-
- $14.49
- + learn more
Swale correct answersA constructed vegetated drainage channel. 
 
culvert correct answersAny artificial covered channel for the passage of water through a bank or under a road, canal. 
 
Pipe culvert correct answersCulvert with a circular cross section 
 
Box culvert correct answersCulvert with a rectangular cross section 
 
catch basin correct answersStructure used to collect and divert surface runoff to a subsurface storm water conveyance system 
 
Sump correct answersUsed to trap and collect ...
-
NICET LEVEL 1 HIGHWAY CONSTRUCTION Questions and Answers (Best Rated)
- Exam (elaborations) • 19 pages • 2024
- Available in package deal
-
- $12.49
- + learn more
Acceptance 
 The written acceptance by the Department of the Work. 
acceptance testing 
 Testing conducted by the Department to measure the degree of 
compliance to the Contract 
actual cost 
 The computed cost using calculations provided 
addendum 
 A Contract revision or response to a Contractor inquiry issued after 
advertisement and before the opening of bids. 
as-built quantity 
 The quantity of a completed Item eligible for payment 
Master01 | September, 2024/2025 | Latest update 
1 | P ...
-
NICET LEVEL 1 HIGHWAY CONSTRUCTION EXAM QUESTIONS AND CORRECT ANSWERS 2024/2025 GRADED A+.
- Exam (elaborations) • 12 pages • 2024
-
- $11.49
- + learn more
NICET LEVEL 1 HIGHWAY 
CONSTRUCTION EXAM 
QUESTIONS AND CORRECT 
ANSWERS 2024/2025 GRADED A+. 
2 / 
12 
1. Acceptance: The written acceptance by the Department of the Work. 
2. acceptance testing: Testing conducted by the Department to measure the de- gree of compliance to 
the Contract 
3. actual cost: The computed cost using calculations provided 
4. addendum: A Contract revision or response to a Contractor inquiry issued after advertisement and 
before the opening of bids. 
5. as-built quanti...
Too much month left at the end of the money?
-
NICET Highway Construction Inspector Level III Practice Exam 1 Question Guide 2024.
- Exam (elaborations) • 16 pages • 2024
- Available in package deal
-
- $12.99
- + learn more
NICET Highway Construction Inspector Level III Practice Exam 1 Question Guide 2024. 
During installation of traffic loops in the pavement, which three statements apply prior to and during the installation of loop wire? (Choose 3). 
 
a) Do not allow vehicular traffic over an open saw cut. 
b) Do not overlap saw cuts at the corner. 
c) Thoroughly clean the saw cut of foreign material. 
d) Use a plastic sleeve where loop wire crosses a joint. - ANSWER a) Do not allow vehicular traffic over an open...
-
NICET LEVEL 1 HIGHWAY CONSTRUCTION
- Other • 7 pages • 2024
-
- $11.49
- + learn more
Acceptance - Answer-The written acceptance by the Department of the Work. 
 
acceptance testing - Answer-Testing conducted by the Department to measure the degree of compliance to the Contract 
 
actual cost - Answer-The computed cost using calculations provided 
 
addendum - Answer-A Contract revision or response to a Contractor inquiry issued after advertisement and before the opening of bids. 
 
as-built quantity - Answer-The quantity of a completed Item eligible for payment 
 
authorized fun...
-
CESSWI Pt. 2 - BMPs questions and answers(already passed)
- Exam (elaborations) • 8 pages • 2024
-
- $12.99
- + learn more
Hydromulch vs Hydroseed (EC) 
Mulch- Temp BMP that consists of WOOD or other fiber 
Seed- Temp BMP that consists of SEED, , etc... 
 
 
 
Soil Binders (EC) 
Polyacrylamides (PAMS) applied to soil to reduce ersion 
 
 
 
 
Previous 
Play 
Next 
Rewind 10 seconds 
Move forward 10 seconds 
Unmute 
0:01 
/ 
0:15 
Full screen 
Brainpower 
Read More 
Tackifiers (EC) 
adhesives used to secure mulch materials to a surface -> casuse siol particles to attach to one another 
 
 
 
Baffles (SC) 
Lengthen...
-
School Bus Endorsement Arkansas CDL
- Exam (elaborations) • 2 pages • 2024
-
- $10.29
- + learn more
School Bus Endorsement Arkansas CDL 
If the bus is in the direct path of a sighted tornado and evcuaction is ordered, the first thing you should do is 
Escort students to a nearby ditch or culvert if shelter in a building is not readily available. 
 
 
What will ABS do? 
Help maintain vehicle control. 
 
 
A CDL is required to drive any vehicle designed to transport more than how many people (including driver)? 
15 
 
 
School bus parking brakes and service brakes should both have air pressure i...
-
NICET Highway Construction Inspector Level III Practice Exam 1 Question Guide 2024
- Exam (elaborations) • 16 pages • 2024
- Available in package deal
-
- $11.49
- + learn more
NICET Highway Construction Inspector Level III Practice Exam 1 Question Guide 2024 
 
During installation of traffic loops in the pavement, which three statements apply prior to and during the installation of loop wire? (Choose 3). 
 
a) Do not allow vehicular traffic over an open saw cut. 
b) Do not overlap saw cuts at the corner. 
c) Thoroughly clean the saw cut of foreign material. 
d) Use a plastic sleeve where loop wire crosses a joint. - ANSWER a) Do not allow vehicular traffic over an ope...