Tie line frequency bias - Study guides, Class notes & Summaries

Looking for the best study guides, study notes and summaries about Tie line frequency bias? On this page you'll find 208 study documents about Tie line frequency bias.

Page 4 out of 208 results

Sort by

NERC Class with Complete Solution Rated A+
  • NERC Class with Complete Solution Rated A+

  • Exam (elaborations) • 14 pages • 2023
  • Available in package deal
  • NERC Class with Complete Solution Rated A+ Frequency Bias and Jointly Owned Units (JOU) -Answer BAs that use dynamic schedule or pseudo-ties for a jointly owned unit share responsibility for it in their bias settings. Fixed schedules for JOU require host BA to include total response for them in their bias setting. Frequency Bias and BA frequency response -Answer BAs must maintain a frequency bias that is equal to or greater than the BA frequency response. If the frequency bias is less th...
    (0)
  • $9.49
  • + learn more
EPRI Chapter Test Questions with Verified Solutions
  • EPRI Chapter Test Questions with Verified Solutions

  • Exam (elaborations) • 10 pages • 2024
  • Available in package deal
  • EPRI Chapter Test Questions with Verified Solutions If a generator is producing 500MW and 200Mvar, the generator is: Lagging 87 Is the IEEE device number for a differential relay. Can a Synchronous machine have a negative torque angle? What doies this mean? Yes, the machine is absorbing active power. A customer load is fed at 12o Volts. The customer's voltage is doubled while the load magnitude stays the same. What effect does this have on the power losses? Decreases the losses by a factor o...
    (0)
  • $9.99
  • + learn more
SOS NERC Prep - RElIABILITY Exam| 200 QUESTIONS AND ANSWERS | GRADED A
  • SOS NERC Prep - RElIABILITY Exam| 200 QUESTIONS AND ANSWERS | GRADED A

  • Exam (elaborations) • 109 pages • 2023
  • Available in package deal
  • The Reliability Coordinator just informed you of a slow time error correction which will begin at the top of the next hour. Your EMS system will not let you change your scheduled frequency. Your Frequency Bias Setting is -100 MW/.1Hz. What action should you take? A) Increase Net Interchange Schedule by 20 MWs. B) Inform the Reliability Coordinator that you cannot participate in the time error correction. C) Decrease Net Interchange Schedule by 20 MWs. D) Increase Net Interchange Sche...
    (0)
  • $11.99
  • + learn more
SOS NERC Prep - RElIABILITY Exam | latest 2023/24 with complete solution
  • SOS NERC Prep - RElIABILITY Exam | latest 2023/24 with complete solution

  • Exam (elaborations) • 49 pages • 2023
  • Available in package deal
  • SOS NERC Prep - RElIABILITY Exam | latest 2023/24 with complete solution The Reliability Coordinator just informed you of a slow time error correction which will begin at the top of the next hour. Your EMS system will not let you change your scheduled frequency. Your Frequency Bias Setting is -100 MW/.1Hz. What action should you take? A) Increase Net Interchange Schedule by 20 MWs. B) Inform the Reliability Coordinator that you cannot participate in the time error correction. C) Decr...
    (0)
  • $9.99
  • + learn more
NERC book quiz Questions and Answers (100% Correct Elaborations)
  • NERC book quiz Questions and Answers (100% Correct Elaborations)

  • Exam (elaborations) • 29 pages • 2023
  • Available in package deal
  • You are an external BA with a frequency bais of 20 MW/.1 Hz that sees a frequency of 60.02 due to a large loss of load in the contingent BA. If your generator governor control systems responded to the frequency deviation approximately how much of a generation change would you BA experience? -4MW Net actual interchange minus Net scheduled interchange is what? Inadvertent interchange Suppose your interconnection operators at 59.97 Hz from one minute after midnight to noon and operate a...
    (0)
  • $10.49
  • + learn more
NERC book quiz| 157 questions| WITH COMPLE SOLUTIONS
  • NERC book quiz| 157 questions| WITH COMPLE SOLUTIONS

  • Exam (elaborations) • 17 pages • 2024
  • Available in package deal
  • NERC book quiz| 157 questions| WITH COMPLE SOLUTIONS You are an external BA with a frequency bais of 20 MW/.1 Hz that sees a frequency of 60.02 due to a large loss of load in the contingent BA. If your generator governor control systems responded to the frequency deviation approximately how much of a generation change would you BA experience? Answer--4MW Net actual interchange minus Net scheduled interchange is what? Answer-Inadvertent interchange Suppose your interconnection operators a...
    (0)
  • $10.99
  • + learn more
NERC RC questions with correct answers
  • NERC RC questions with correct answers

  • Exam (elaborations) • 7 pages • 2023
  • Available in package deal
  • System studies identify what CORRECT ANSWER Predict operations and identify constraints If ACE remains the same and frequency goes up what has happened? CORRECT ANSWER Someone lost load When a generator has its AVR in service it is a? CORRECT ANSWER Dynamic source of reactive power Black start resource testing is done every? CORRECT ANSWER 3 years Each BA shall operate its AGC on? CORRECT ANSWER Tie line Frequency Bias When is voltage reduction reportable? CORRECT ANSWER Greater t...
    (0)
  • $13.49
  • + learn more
HSI Final Test Questions with Correct Answer Latest Update
  • HSI Final Test Questions with Correct Answer Latest Update

  • Exam (elaborations) • 20 pages • 2024
  • Available in package deal
  • HSI Final Test Questions with Correct Answer Latest Update Interconnection frequency is 59.80 Hz . Your ACE is a large negative value and your AGC is pulsing your units down . What should you do •Leave AGC in operation but investigate •Place AGC in constant frequency control •Place AGC in flat tie line control •Suspend AGC and investigate - Answer-•Suspend AGC and investigate When a Balancing Authority's ACE value is the same sign as the frequency deviation , which NERC ...
    (0)
  • $16.49
  • + learn more
NERC SOS QUIZ QUESTIONS WITH 100% CORRECT ANSWERS.
  • NERC SOS QUIZ QUESTIONS WITH 100% CORRECT ANSWERS.

  • Exam (elaborations) • 46 pages • 2023
  • If a Balancing Authority does not comply with the Control Performance Standard, the Balancing Authority is not permitted to provide which of the following for any other Balancing Authority entities? Regulation of other services related to control performance 1. It is the obligation of each Balancing Authority to fulfill its commitment to the Interconnection and not ________ the other balancing Authorities in the Interconnection Burden A Balancing Authority is performing Overlap R...
    (0)
  • $14.49
  • + learn more
NERC RC Test with Complete Solution
  • NERC RC Test with Complete Solution

  • Exam (elaborations) • 6 pages • 2023
  • Available in package deal
  • System studies identify what -Answer Predict operations and identify constraints If ACE remains the same and frequency goes up what has happened? -Answer Someone lost load When a generator has its AVR in service it is a? -Answer Dynamic source of reactive power Black start resource testing is done every? -Answer 3 years Each BA shall operate its AGC on? -Answer Tie line Frequency Bias When is voltage reduction reportable? -Answer Greater than 3% Reactors do what? -Answer Absorb VARs What...
    (0)
  • $7.99
  • + learn more