Rigging equipment slings - Study guides, Class notes & Summaries
Looking for the best study guides, study notes and summaries about Rigging equipment slings? On this page you'll find 201 study documents about Rigging equipment slings.
Page 4 out of 201 results
Sort by
-
Massachusetts 1B Hoisting License Exam Prep Questions And Answers Updated 2024/2025 | Scored A+
- Exam (elaborations) • 16 pages • 2024
- Available in package deal
-
- $14.49
- + learn more
1. manufacturer's specification: all hoisting machinery shall be operated 
in accor- dance with the: 
2. inoperable and secure: maintenance repair and refueling shall be done 
when the machine is: 
3. daily: visual inspection shall be made of wire ropes, bearings, 
gears, friction clutches, brakes, chain drives and other parts subject to wear on all 
hoisting machinery to ensure against development of unsafe conditions 
4. 2: factory of safety. all parts ...
-
OSHA 500 Construction Trainer Exam with Correct Solutions
- Exam (elaborations) • 14 pages • 2024
- Available in package deal
-
- $10.49
- + learn more
OSHA 500 Construction Trainer Exam with 
Correct Solutions 
3 major types of rigging hazards - Answer -falls 
struck by 
electric 
materials handling aparatus in rigging (3) - Answer -wire ropes 
chains 
synthetic (web) slings 
inspections (how often and by whom) - Answer -prior to each use by a competent person 
rigging restrictions for wire rope - Answer -less than 10% broken wires in 8 diameter 
requirements for special custom-designed accessories in relation to safe working loads for rigging...
-
NCCCO RIGGING 1 & 2 Exam terms and Answers.
- Exam (elaborations) • 4 pages • 2024
-
- $22.49
- + learn more
NCCCORIGGING1&2ExamtermsandAnswers. 
OSHA 1910 - Correct Answer General Industry Standards 
OSHA 1926 - Correct Answer Construction Industry Standards 
OSHA 1910.180 - Correct Answer Crawler, Locomotive and Truck Cranes 
OSHA 1910.184 - Correct Answer Slings 
OSHA 1926.251 - Correct Answer Rigging Equipment used for material handling 
OSHA 1926.1400 - Correct Answer Cranes and Derricks used in construction 
ASME B30.3 - Correct Answer Tower Crane
-
Pathfinder Sling Load Written Exam - Questions with Verified Answers
- Exam (elaborations) • 14 pages • 2024
- Available in package deal
-
- $18.49
- + learn more
Pathfinder Sling Load Written Exam - Questions with Verified Answers Multiservice Helicopter sling loads basic operations and equipment TM 4-48.09 Multiservice helicopter sling loads single point rigging procedures TM 4-48.10 Multiservice Helicopter Sling Loads Dual Point Rigging Procedures TM 4-48.11 Pathfinder Operations FM 3-21.38 Airdrop of supplies and equipment: rigging airdrop platforms FM 4-20.102 What 3 units are part of Pathfinder operations? Supported unit, Supporting unit, Receivin...
-
Massachusetts 1C Hoisting License Exam Certification Q&A
- Exam (elaborations) • 8 pages • 2024
-
- $12.49
- + learn more
Massachusetts 1C Hoisting License 
Exam Certification Q&A 
manufacturer's specification - CORRECT ANSWER-all hoisting machinery shall be 
operated in accordance with the: 
inoperable and secure - CORRECT ANSWER-maintenance repair and refueling shall 
be done when the machine is: 
daily - CORRECT ANSWER-visual inspection shall be made ___________ of wire 
ropes, bearings, gears, friction clutches, brakes, chain drives and other parts subject to 
wear on all hoisting machinery to ensure agai...
And that's how you make extra money
-
Massachusetts 1C & 2A Hoisting License Questions and Answers Latest Updated 2024/2025 | Rated A+.
- Exam (elaborations) • 14 pages • 2024
- Available in package deal
-
- $13.49
- + learn more
Massachusetts 1C & 2A Hoisting License Questions and Answers Latest Updated 2024/2025 | Rated A+. What type of system is used when working on de-energized circuitry?: 
 lock out/tag out 
4. All welding and cutting on hoisting equipment must be done in accordance 
with what code?: 1998 ASME Chapter 9 
5. What type of protection is required for hoisting operators?: rops, heat, 
seat- belt, shatterproof glass and hardhat 
6. What regulatory authority governs hoisting in M...
-
NCCCO RIGGING 1 & 2 Final Exam Latest Updated Q&A
- Exam (elaborations) • 4 pages • 2024
-
- $11.99
- + learn more
NCCCO RIGGING 1 & 2 Final Exam 
Latest Updated Q&A 
OSHA 1910 - CORRECT ANSWER-General Industry Standards 
OSHA 1926 - CORRECT ANSWER-Construction Industry Standards 
OSHA 1910.180 - CORRECT ANSWER-Crawler, Locomotive and Truck Cranes 
OSHA 1910.184 - CORRECT ANSWER-Slings 
OSHA 1926.251 - CORRECT ANSWER-Rigging Equipment used for material handling 
OSHA 1926.1400 - CORRECT ANSWER-Cranes and Derricks used in construction 
ASME B30.3 - CORRECT ANSWER-Tower Cranes 
ASME B30.5 - CORRECT ANSWER-Mobi...
-
Rigging Practices Course Questions and Answers (100% Solved) Latest.
- Exam (elaborations) • 11 pages • 2023
-
- $10.99
- + learn more
Rigging Practices Course Questions and Answers (100% Solved) Latest. 
A load chart range diagram can best be used to help identify: net capacity 
for mobile crane working at maximum radius, exceeding what percentage of the cranes capacity 
requires the radius to be verified? 80% 
the minimum depth of thread engagement for a 1/2 in eyebolt into steel object is? 3/4 in 
when tying knots in synthetic rope lashing, the rated load is increased by 50% ? false 
the size of shackle that can be used in t...
-
NEIEP 200 Final Exam Questions With Answers Latest Updated 2024/2025 (100% VERIFIED)
- Exam (elaborations) • 13 pages • 2024
- Available in package deal
-
- $16.99
- + learn more
NEIEP 200 Final Exam Questions With Answers Latest Updated 2024/2025 (100% VERIFIED) you are using a plumb line to check a rail for plumb. you find that at the top 
it measures 1" and at the bottom it measures 1 1/4". what does this tell 
you? 
(Ansa. the top of the rail needs to go towards the center 
b. the top of the rail needs to go toward the wall 
c. the bottom of the rail needs to go toward the wall 
you are plumbing rails on a high rise installation. what type of plumb line 
should you...
-
General Crane Certification Exam Final Questions and Answers
- Exam (elaborations) • 7 pages • 2024
-
- $11.49
- + learn more
General Crane Certification Exam Final 
Questions and Answers 
According to OSHA the term "must" is - CORRECT ANSWER-Mandatory 
Boom length is measured from - CORRECT ANSWER-Heel pin to the center of the 
boom tip sheave pin 
A boom angle indicator indicates the boom's angle to - CORRECT ANSWER-Horizontal 
Load radius - CORRECT ANSWER-is the horizontal distance from the center of rotation 
to the centerline of the vertical hoist line with the load freely suspended. 
leverage - CORRECT ANSW...
Did you know that on average a seller on Stuvia earns $82 per month selling study resources? Hmm, hint, hint. Discover all about earning on Stuvia