C172 sample test - Study guides, Class notes & Summaries

Looking for the best study guides, study notes and summaries about C172 sample test? On this page you'll find 225 study documents about C172 sample test.

Page 4 out of 225 results

Sort by

ACI Certification Exam Questions With Verified Answers Latest UPDATED 2024/2025 | Scored A+
  • ACI Certification Exam Questions With Verified Answers Latest UPDATED 2024/2025 | Scored A+

  • Exam (elaborations) • 19 pages • 2024
  • Available in package deal
  • ACI Certification Exam Questions With Verified Answers Latest UPDATED 2024/2025 | Scored A+. ASTM C1064 Answer - Standard Test Method For Temperature of Freshly Mixed Hydraulic-Cement Concrete The sensor of the temperature measuring device shall be submerged a minimum of ______ inches into the freshly mixed concrete. Answer - 3" The temperature measuring device shall have a capacity of measuring temperature of freshly mixed concrete to ± ______ °F throughout a range of ____________. Answ...
    (0)
  • $14.99
  • + learn more
ACI Concrete Field-Testing Technician - Grade 1 Exam Review | 100% Correct Answers | Verified | Latest 2024 Version
  • ACI Concrete Field-Testing Technician - Grade 1 Exam Review | 100% Correct Answers | Verified | Latest 2024 Version

  • Exam (elaborations) • 43 pages • 2024
  • Available in package deal
  • ACI Concrete Field-Testing Technician - Grade 1 Exam Review | 100% Correct Answers | Verified | Latest 2024 Version Q1. Start molding specimens for strength tests within 30 minutes after fabricating the composite sample. A. True B. False - B. False ASTM C172 -Para (4.1.2) - Start molding. specimens for strength tests within 15 min after fabricating the composite sample. Q2. The maximum allowable time between obtaining the first and last portions of the composite sample may not ex...
    (0)
  • $10.99
  • + learn more
ACI- Concrete Field-Testing Technician - Grade 1 (Working knowledge of seven  basic field tests) latest update 2024
  • ACI- Concrete Field-Testing Technician - Grade 1 (Working knowledge of seven basic field tests) latest update 2024

  • Exam (elaborations) • 29 pages • 2024
  • Available in package deal
  • Q1. Start molding specimens for strength tests within 30 minutes after fabricating the composite sample. A. True B. False - CORRECT ANSWER-B. False ASTM C172 -Para (4.1.2) - Start molding. specimens for strength tests within 15 min after fabricating the composite sample. Q2. The maximum allowable time between obtaining the first and last portions of the composite sample may not exceed 5 minutes. A. True B. False - CORRECT ANSWER-B. False ASTM C172 - Para (4.1)- The elapsed time sh...
    (0)
  • $7.99
  • + learn more
ACI Grade 1 - Written Test 2024 with Complete Solutions
  • ACI Grade 1 - Written Test 2024 with Complete Solutions

  • Exam (elaborations) • 31 pages • 2024
  • ACI Grade 1 - Written Test 2024 with Complete Solutions Sampling by this practice covers procedures for obtaining representative samples, on which tests are to be performed to determine ___ with quality requirements of the specifications listed under which the concrete is furnished (C172/C172M-17 = Sampling Freshly Mixed Concrete) -Answer-Compliance This practice covers sampling from five types of equipment which are... (C172/C172M- 17 = Sampling Freshly Mixed Concrete) -Answer-Stationary...
    (0)
  • $13.49
  • + learn more
ACI Concrete Field-Testing Technician - Grade 1 Exam Review | 100% Correct Answers | Verified | Latest 2024 Version
  • ACI Concrete Field-Testing Technician - Grade 1 Exam Review | 100% Correct Answers | Verified | Latest 2024 Version

  • Exam (elaborations) • 43 pages • 2024
  • Available in package deal
  • Q1. Start molding specimens for strength tests within 30 minutes after fabricating the composite sample. A. True B. False - B. False ASTM C172 -Para (4.1.2) - Start molding. specimens for strength tests within 15 min after fabricating the composite sample. Q2. The maximum allowable time between obtaining the first and last portions of the composite sample may not exceed 5 minutes. A. True B. False - B. False ASTM C172 - Para (4.1)- The elapsed time shall not exceed 15 min. between obta...
    (0)
  • $12.99
  • + learn more
ACI Certification Exam Questions With Verified Answers, Latest 2024/2025 | Scored A+
  • ACI Certification Exam Questions With Verified Answers, Latest 2024/2025 | Scored A+

  • Exam (elaborations) • 19 pages • 2024
  • Available in package deal
  • ACI Certification Exam Questions With Verified Answers, Latest 2024/2025 | Scored A+. The sensor of the temperature measuring device shall be submerged a minimum of ______ inches into the freshly mixed concrete. Answer - 3" The temperature measuring device shall have a capacity of measuring temperature of freshly mixed concrete to ± ______ °F throughout a range of ____________. Answer - 1 degree, 30 degrees to 120 degrees The temperature measuring device shall be calibrated ______ , or w...
    (0)
  • $14.49
  • + learn more
ACI Certification Exam Questions With Verified Answers Latest UPDATED 2024/2025 | Rated A+.
  • ACI Certification Exam Questions With Verified Answers Latest UPDATED 2024/2025 | Rated A+.

  • Exam (elaborations) • 19 pages • 2024
  • Available in package deal
  • ACI Certification Exam Questions With Verified Answers Latest UPDATED 2024/2025 | Rated A+. The sensor of the temperature measuring device shall be submerged a minimum of ______ inches into the freshly mixed concrete. Answer - 3" The temperature measuring device shall have a capacity of measuring temperature of freshly mixed concrete to ± ______ °F throughout a range of ____________. Answer - 1 degree, 30 degrees to 120 degrees The temperature measuring device shall be calibrated ______ ...
    (0)
  • $13.99
  • + learn more
ACI Concrete Field Testing Technician - Grade 1 (18) Exam With Complete Solutions
  • ACI Concrete Field Testing Technician - Grade 1 (18) Exam With Complete Solutions

  • Exam (elaborations) • 25 pages • 2024
  • Available in package deal
  • ACI Concrete Field Testing Technician - Grade 1 (18) Exam With Complete Solutions ASTM C1064 - answerStandard Test Method For Temperature of Freshly Mixed Hydraulic- Cement Concrete The end of the temperature sensing portion of the temperature measuring device shall be submerged a minimum of ____ into the freshly mixed concrete. - answer3 inches [75 mm] C1064, Sec. 8.1 The temperature measuring device shall have a capacity of measuring the temperature of freshly mixed concrete to ± ____...
    (0)
  • $13.49
  • + learn more
ACI Grade 1 - Written Test Questions with Complete Solutions
  • ACI Grade 1 - Written Test Questions with Complete Solutions

  • Exam (elaborations) • 20 pages • 2023
  • Available in package deal
  • ACI Grade 1 - Written Test Questions with Complete Solutions Sampling by this practice covers procedures for obtaining representative samples, on which tests are to be performed to determine ___ with quality requirements of the specifications listed under which the concrete is furnished (C172/C172M-17 = Sampling Freshly Mixed Concrete) - Correct Answer Compliance This practice covers sampling from five types of equipment which are... (C172/C172M-17 = Sampling Freshly Mixed Concrete) - Corre...
    (0)
  • $11.49
  • + learn more
ACI- Concrete Field-Testing Technician - Grade 1 (Working knowledge of seven  basic field tests) latest update 2024
  • ACI- Concrete Field-Testing Technician - Grade 1 (Working knowledge of seven basic field tests) latest update 2024

  • Exam (elaborations) • 29 pages • 2024
  • Available in package deal
  • ACI- Concrete Field-Testing Technician - Grade 1 (Working knowledge of seven basic field tests) latest update 2024 Q1. Start molding specimens for strength tests within 30 minutes after fabricating the composite sample. A. True B. False - CORRECT ANSWER-B. False ASTM C172 -Para (4.1.2) - Start molding. specimens for strength tests within 15 min after fabricating the composite sample. Q2. The maximum allowable time between obtaining the first and last portions of the composite samp...
    (0)
  • $16.99
  • + learn more