What is leed - Study guides, Class notes & Summaries

Looking for the best study guides, study notes and summaries about What is leed? On this page you'll find 471 study documents about What is leed.

Page 3 out of 471 results

Sort by

LEED AP BD+C Practice Questions with 100% Correct Answers
  • LEED AP BD+C Practice Questions with 100% Correct Answers

  • Exam (elaborations) • 25 pages • 2024
  • Available in package deal
  • What are the 8 LEED AP BD+C adaptations? Correct Answer New Construction and Major Renovations Core and Shell Development Schools Retail Data Centers Warehouses and Dist. Centers Hoslitality Healthcare What are the 8 LEED AP BD+C adaptations? Correct Answer New Construction and Major Renovations Core and Shell Development Schools Retail Data Centers Warehouses and Dist. Centers Hospitality Healthcare Required LEED strategies are called ____ and optional LEED strategies are ca...
    (0)
  • $13.99
  • + learn more
LEED Final Exam LATEST SOLUTION 2024/25 GUARANTEED GRADE A+
  • LEED Final Exam LATEST SOLUTION 2024/25 GUARANTEED GRADE A+

  • Exam (elaborations) • 15 pages • 2024
  • Green Associate The LEED ___ credential denotes general knowledge of green design, construction, and operations. Biogas ___ is generated from decomposing organic matter, such as food or animal waste, which is processed in an anaerobic digester. elimination of waste Lean process improvement is the principle of continuously improving any process through the ___ in every step of manufacturing. sustainability A(n) ___ director would be responsible for activities such as creating energy effici...
    (0)
  • $11.99
  • + learn more
LEED BD+C EXAM 2024  WITH 100% CORRECT ANSWERS
  • LEED BD+C EXAM 2024 WITH 100% CORRECT ANSWERS

  • Exam (elaborations) • 19 pages • 2024
  • When calculating occupied areas in an area of a building, what spaces must be excluded? - correct answer Underground or structured parking Mechanical spaces are included How do you calculate default occupancy counts for Core and Shell projects? - correct answer Using gross floor area, not net or leasable floor area Are hotel guests visitors or regular occupants of the building? - correct answer Regular occupants Can boats and mobile homes be certified under LEED? - correct answer No. ...
    (0)
  • $16.49
  • + learn more
LEED AP BD+C V4: LEED PROCESS (IP) EXAM 2024 WITH 100% CORRECT ANSWERS
  • LEED AP BD+C V4: LEED PROCESS (IP) EXAM 2024 WITH 100% CORRECT ANSWERS

  • Exam (elaborations) • 21 pages • 2024
  • The LEED reviewer response from a preliminary review indicates a project will be 1 point short of LEED Platinum. What should the project team do if they still want to pursue LEED Platinum? A. Exclude 10% of the gross floor area to try to improve the project's energy performance B. Install extra bicycle racks to earn exemplary performance for LT Credit Bicycle Facilities C. Submit new or revised documentation for credits that were denied or require more information, or attempt additional cr...
    (0)
  • $14.49
  • + learn more
GBES LEED Green Associate Questions and Answer | Latest  Update 2024/2025
  • GBES LEED Green Associate Questions and Answer | Latest Update 2024/2025

  • Exam (elaborations) • 97 pages • 2024
  • Available in package deal
  • What are the Minimum Program Requirements (MPR) for a LEED project? ~~> 1. Must be in a permanent location on existing land 2. Must use a reasonable site boundary 3. Must comply with the project size requirements 1. to give clear guidance to customers 2. to protect the integrity of the LEED program 3. to reduce complications that occur during the LEED Certification process ~~> Goals of MPRs related to ventilation, controlling air contaminant levels, humidity, and temperature with...
    (0)
  • $13.79
  • + learn more
LEED EXAM QUESTIONS AND ANSWERS
  • LEED EXAM QUESTIONS AND ANSWERS

  • Exam (elaborations) • 57 pages • 2023
  • What are the Minimum Program Requirements for a LEED project? - Answer- 1. Must be in a permanent location on existing land. 2. Must use a reasonable site boundary. 3. Must comply with the project size requirements. What is ASHRAE 62.1 related to? - Answer- ASHRAE 62.1 is related to ventilation, controlling air contaminant levels, humidity, and temperature within a space. What is ASHRAE 55 related to? - Answer- ASHRAE 55 is related to the comfort criteria of specific design conditions th...
    (0)
  • $15.49
  • + learn more
LEED Green Associate Exam 1 Questions With Answers
  • LEED Green Associate Exam 1 Questions With Answers

  • Exam (elaborations) • 23 pages • 2024
  • LEED Green Associate Exam 1 Questions With Answers Natural refrigerants are... Less efficient 3 Phases of LEED Integrative Process 1. Design and Construction (Implementation) 2. Occupancy, Operations and Performance Feedback 3. Discovery LEED Charrette Intensive, muitiparty workshop that brings people from different disciplines and backgrounds together to produce specific deliverables LEED Impact Categories (7) 1. Reverse contribution to climate change 2. Enhance individua...
    (0)
  • $11.09
  • + learn more
LEED Green Associate Exam 1 Questions With Answers
  • LEED Green Associate Exam 1 Questions With Answers

  • Exam (elaborations) • 23 pages • 2024
  • LEED Green Associate Exam 1 Questions With Answers Natural refrigerants are... Less efficient 3 Phases of LEED Integrative Process 1. Design and Construction (Implementation) 2. Occupancy, Operations and Performance Feedback 3. Discovery LEED Charrette Intensive, muitiparty workshop that brings people from different disciplines and backgrounds together to produce specific deliverables LEED Impact Categories (7) 1. Reverse contribution to climate change 2. Enhance individua...
    (0)
  • $10.89
  • + learn more
LEED Green Associate Sample  Exam Questions and Answer |  Latest Update 2024/2025
  • LEED Green Associate Sample Exam Questions and Answer | Latest Update 2024/2025

  • Exam (elaborations) • 18 pages • 2024
  • Available in package deal
  • What rules should be used when selecting a LEED rating system when more than one system may apply? ~~> 40/60 Use the rating system that is most applicable To verify the compliance of a credit or prerequisite, a qualified member of the project team submits this ~~> Credit Forms This source consumes the largest amount of energy in buildings ~~> Space Heating Legal protection of the ozone layer in the US is provided by this ~~> Montreal Protocol 2009 LEED rating systems, ex...
    (0)
  • $10.49
  • + learn more
Nccer Plumbing Level 1 Exam Questions with 100% correct Answers
  • Nccer Plumbing Level 1 Exam Questions with 100% correct Answers

  • Exam (elaborations) • 13 pages • 2023
  • The modern word for plumber is derived from the Latin word for - ANSWER-A person who works with lead LEED applies to all areas of the profession, except - ANSWER-Renovation Water that comes from laundry and bathtubs and reused in known as - ANSWER-Graywater Suggested national plumbing standards are called - ANSWER-Model codes You are offered a job by another contractor before you have fulfilled your current obligations. The professional response is to - ANSWER-Ask the contractor to w...
    (0)
  • $10.39
  • 6x sold
  • + learn more