Osha 30 crane safety exam - Study guides, Class notes & Summaries
Looking for the best study guides, study notes and summaries about Osha 30 crane safety exam? On this page you'll find 92 study documents about Osha 30 crane safety exam.
Page 3 out of 92 results
Sort by
-
OECP Exam Questions With 100% Correct Answers Latest Update 2024/2025 (VERIFIED)
- Exam (elaborations) • 23 pages • 2024
-
- $14.99
- + learn more
OECP Exam Questions With 100% Correct Answers 2024/2025 (VERIFIED) The shaded area on a load chart 
indicates _______? 
A structural chart 
3. The minimum distance to a power 
line of unknown voltage is ? 
50' 
4. When hoisting personnel and have 
known voltage, can you use Table A 
and get closer than 20'? 
Never! 
5. What is the minimum tale swing 
clearance requirement 
2' 
6. What kind of rigger is required for 
A/D? 
Qualified Rigger 
7. Signal training is now required in 
the constructi...
-
OSHA 30 CONSTRUCTION FINAL EXAM
- Exam (elaborations) • 75 pages • 2024
-
- $14.49
- + learn more
OSHA 30 CONSTRUCTION FINAL EXAM 
 
1.	OSHA requires training to be provided within one year of when a safety and health program is first established 
 
A.	True 
B.	False (correct answer) 
 
 
The minimum safe distance for equipment operating in proximity to energized power lines that contain up to 50,000 volts is 
 
A.	25 feet 
B.	5 feet 
C.	10 feet (correct answer) 
D.	50 feet 
 
 
The 	GFCI fits into the standard electrical outlet box to protect ground faults. 
 
A.	Disposable 
B.	Receptacle (...
-
NCCCO Overhead Crane Exam Questions Marking Scheme New Update (A+ Pass)
- Exam (elaborations) • 8 pages • 2024
-
- $10.99
- + learn more
NCCCO Overhead Crane Exam Questions Marking Scheme New Update (A+ Pass) 
 
Overhead cranes with more than one hoisting unit shall have? - Answers -Its rated load marked on it. 
 
How often does O.S.H.A. require a written wire rope inspection? - Answers -Once a month 
 
What is the purpose of the "E" (Emergency) stop on an overhead crane? - Answers -Removes power to entire crane. 
 
Most loads should be rigged to within how many degrees of level? - Answers -5 
 
According to ASME B30.2, what is...
-
Osha 30 Crane safety Final Exam Prep Questions & Answers 2024.
- Exam (elaborations) • 3 pages • 2024
- Available in package deal
-
- $10.49
- + learn more
Osha 30 Crane safety Final Exam Prep Questions & Answers ards for crane safety can be found in - correct answer a. 29 cfr 19 subpart cc 
 
which of the following is an employer requirement - correct answer d. all of the above 
 
you must assure your crane is stable by each except - correct answer b on-board seismograph 
 
load charts must - correct answer b. indicate rated lifting capacity ad be visible to operator 
 
an annual inspection of each crane is - correct answer d all of the above 
 
c...
-
NCCCO PT EXAM QUESTIONS AND ANSWERS LATEST UPDATED 2024/2025 (100% Correct & Graded)
- Exam (elaborations) • 11 pages • 2024
- Available in package deal
-
- $15.49
- + learn more
NCCCO PT EXAM QUESTIONS AND ANSWERS LATEST UPDATED 2024/2025 (100% Correct & Graded) Which unsafe condition could result when a wedge socket is attached directly to a load hook, 
using 6x19 IWRC? 
(A) Spinning of the load (B) Decreased line pull (C) Decreased safe working load (D) Structural 
failure correct answers (A) Spinning of the load 
Which if the following will indicates intemal damage or ultimately core failure in rotationresistant rope? 
(A) Strand bird caging (B) Dianeter reduction (C...
Make study stress less painful
-
NCCCO CORE EXAM 2023-2024 ACTUAL EXAM QUESTIONS AND CORRECT ANSWERS VERIFIED ANSWERS GRADED A+
- Exam (elaborations) • 22 pages • 2023
-
- $12.99
- + learn more
NCCCO CORE EXAM ACTUAL EXAM 
QUESTIONS AND CORRECT ANSWERS 
VERIFIED ANSWERS GRADED A+ 
If taking sides strain on a boom what concerns the operator the most - ANSWER-Boom 
damage 
If a crane load chart has capacities listed in the shaded area this means that - 
ANSWER-If overloaded structural confidence will be compromised 
As the layers of rope on a drum increase the allowable line Pull wil - ANSWERDecrease 
Of the following actions which one will most likely cause a side load condition - 
ANS...
-
OSHA 30 CRANE SAFETY WRITTEN EXAM ACTUAL QUESTIONS AND ANSWERS 2023
- Exam (elaborations) • 3 pages • 2023
-
- $9.49
- + learn more
OSHA 30 CRANE SAFETY WRITTEN EXAM ACTUAL QUESTIONS AND ANSWERS 2023
-
OSHA 30 Final Exam |Question and Answer| 100% Correct 2024
- Exam (elaborations) • 31 pages • 2024
- Available in package deal
-
- $9.99
- + learn more
OSHA 30 Final Exam |Question and 
Answer| 100% Correct 2024 
Those who work on a crane or near crane operations must be trained. Which of the following is 
true for this training? *Ans* D. All of the above 
Certain inspections of crane equipment may be made by a(n) ___________ person; however, 
crane inspections are typically required to be made by a(n) __________ person. 
*Ans* Competent, qualified 
After safety-related modifications have been made to crane equipment, the equipment must be ...
-
NCCCO CORE EXAM 2024 REAL EXAM QUESTIONS WITH VERIFIED ANSWERS RATED A+
- Exam (elaborations) • 40 pages • 2024
-
- $21.79
- + learn more
NCCCO CORE EXAM 2024 REAL EXAM QUESTIONS WITH VERIFIED ANSWERS RATED A+ 
 
Jib forestay and backstay pendant lines - Answer- Of equal length or the backstay pendant lines should be longer 
 
Jib capacity increases as the angle to the ground decreases - Answer- False 
 
Whenever operating a crane around a newly constructed building which of these conditions could be dangerous - Answer- Un compacted soil 
 
The ground pressure under outriggers higher than it is under a crawler track because of a ...
-
OECP Exam Questions With 100% Correct Answers, Latest Updated 2024/2025 (GRADED)
- Exam (elaborations) • 23 pages • 2024
-
- $15.49
- + learn more
What are the four different types of 
crane signals? 
Hand 
Voice 
Audible 
New 
2. The shaded area on a load chart 
indicates _______? 
A structural chart 
3. The minimum distance to a power 
line of unknown voltage is ? 
50' 
4. When hoisting personnel and have 
known voltage, can you use Table A 
and get closer than 20'? 
Never! 
5. What is the minimum tale swing 
clearance requirement 
2' 
6. What kind of rigger is required for 
A/D? 
Qualified Rigger 
7. Signal training is now required i...
Study stress? For sellers on Stuvia, these are actually golden times. KA-CHING! Earn from your study resources too and start uploading now. Discover all about earning on Stuvia