Grab sampling - Study guides, Class notes & Summaries

Looking for the best study guides, study notes and summaries about Grab sampling? On this page you'll find 149 study documents about Grab sampling.

Page 3 out of 149 results

Sort by

ACI CONCRETE FIELD TESTING  TECHNICIANS GRADE 1 (IN CANADA) Correctly Answered Questions| UpToDate |  Already Graded A+
  • ACI CONCRETE FIELD TESTING TECHNICIANS GRADE 1 (IN CANADA) Correctly Answered Questions| UpToDate | Already Graded A+

  • Exam (elaborations) • 24 pages • 2024
  • Available in package deal
  • The standard practice describes the _____ _____ and _____ required to obtain a representative sample of fresh concrete and to assess its tractability to the structure it represents. ☑: procedures, location and sample size The procedures used in sampling shall include the use of every precaution that will assist in obtaining samples that are truly representative of the _____and _______ of the concrete. ☑: nature, conditions Intermittent scooping of the sample in shovelfuls or bucket...
    (0)
  • $12.49
  • + learn more
ACI CONCRETE FIELD TESTING TECHNICIANS GRADE 1 (IN CANADA), WITH COMPLETE SOLUTION.
  • ACI CONCRETE FIELD TESTING TECHNICIANS GRADE 1 (IN CANADA), WITH COMPLETE SOLUTION.

  • Exam (elaborations) • 10 pages • 2024
  • Available in package deal
  • ACI CONCRETE FIELD TESTING TECHNICIANS GRADE 1 (IN CANADA), WITH COMPLETE SOLUTION. The standard practice describes the _____ _____ and _____ required to obtain a representative sample of fresh concrete and to assess its tractability to the structure it represents. procedures, location and sample size The procedures used in sampling shall include the use of every precaution that will assist in obtaining samples that are truly representative of the _____and _______ of the concrete. nature a...
    (0)
  • $12.99
  • + learn more
Cnim  practice questions(1000+) questions and answers 2024
  • Cnim practice questions(1000+) questions and answers 2024

  • Exam (elaborations) • 121 pages • 2024
  • Available in package deal
  • During a scoliosis surgery, you recognize a gradual latency increase of 3.5 msec in the PTN cortical response, the subcortical response appears to be shifted out almost as much. All response amplitudes are unchanged. What is the appropriate action to take? a. Ignore the change, it means nothing. b. Inform the surgeon immediately that changes consistent with spinal cord injury may have occurred. Recommend a wake up test. c. Check the latencies of the PF and MN responses to see if they are also sh...
    (0)
  • $23.99
  • + learn more
Cnim 1000 practice questions Fixed
  • Cnim 1000 practice questions Fixed

  • Exam (elaborations) • 97 pages • 2024
  • Available in package deal
  • Cnim 1000 practice questions Fixed During a scoliosis surgery, you recognize a gradual latency increase of 3.5 msec in the PTN cortical response, the subcortical response appears to be shifted out almost as much. All response amplitudes are unchanged. What is the appropriate action to take? a. Ignore the change, it means nothing. b. Inform the surgeon immediately that changes consistent with spinal cord injury may have occurred. Recommend a wake up test. c. Check the latencies of the PF an...
    (0)
  • $7.99
  • + learn more
ACI CONCRETE FIELD TESTING TECHNICIANS GRADE 1 (IN CANADA) EXAM QUESTIONS AND ANSWERS
  • ACI CONCRETE FIELD TESTING TECHNICIANS GRADE 1 (IN CANADA) EXAM QUESTIONS AND ANSWERS

  • Exam (elaborations) • 14 pages • 2024
  • Available in package deal
  • ACI CONCRETE FIELD TESTING TECHNICIANS GRADE 1 (IN CANADA) EXAM QUESTIONS AND ANSWERS The standard practice describes the _____ _____ and _____ required to obtain a representative sample of fresh concrete and to assess its tractability to the structure it represents. - Answer- procedures, location and sample size The procedures used in sampling shall include the use of every precaution that will assist in obtaining samples that are truly representative of the _____and _______ of the concr...
    (0)
  • $12.49
  • + learn more
CCIL 2024 QUESTIONS WITH COMPLETE  SOLUTIONS ALREADY PASSED AND VERIFIED
  • CCIL 2024 QUESTIONS WITH COMPLETE SOLUTIONS ALREADY PASSED AND VERIFIED

  • Exam (elaborations) • 13 pages • 2024
  • Available in package deal
  • Sampling from a mixer/truck agitator- Where is sample taken? - CORRECT ANSWER Between 10% and 90% (Not when testing with Super P) How is a sample taken when sampling plastic concrete? - CORRECT ANSWER Either pass a receptacle completely through a discharge stream OR divert a discharge stream completely into a sampling container. How many grab samples are needed when testing for uniformity of samples? - CORRECT ANSWER 3 What size sample is needed when casting 3 100mm x 200mm cyl...
    (0)
  • $13.49
  • + learn more
CCIL Exam Study Guide | Questions and Correct Answers | Latest Update 2024/2025 | 100% Pass
  • CCIL Exam Study Guide | Questions and Correct Answers | Latest Update 2024/2025 | 100% Pass

  • Exam (elaborations) • 11 pages • 2024
  • CCIL Exam Study Guide | Questions and Correct Answers | Latest Update 2024/2025 | 100% Pass Sampling from a mixer/truck agitator- Where is sample taken? - Answer -Between 10% and 90% (Not when testing with Super P) How is a sample taken when sampling plastic concrete? - Answer -Either pass a receptacle completely through a discharge stream OR divert a discharge stream completely into a sampling container. How many grab samples are needed when testing for uniformity of samples? - Answer...
    (0)
  • $11.99
  • + learn more
CCIL EXAM | QUESTIONS & 100%  CORRECT ANSWERS (VERIFIED) | LATEST  UPDATE | GRADEA+
  • CCIL EXAM | QUESTIONS & 100% CORRECT ANSWERS (VERIFIED) | LATEST UPDATE | GRADEA+

  • Exam (elaborations) • 8 pages • 2024
  • Available in package deal
  • CCIL EXAM | QUESTIONS & 100% CORRECT ANSWERS (VERIFIED) | LATEST UPDATE | GRADEA+ Between what percentages must you sample a concrete truck? Correct Answer: 10% and 90% What is grab sampling? Correct Answer: Securing at one point of the discharge as fast as possible. Tamping rod size for 100 x 200mm cylinders Correct Answer: 10 +/- 1mm in diameter, between 450 mm and 600 mm Minimum sample required for 150 x 300mm cylinder? Correct Answer: 30L How long do you have to obtain, transpo...
    (0)
  • $10.49
  • + learn more
wastewater grade 1 exam Treatment updated 20-24/2025
  • wastewater grade 1 exam Treatment updated 20-24/2025

  • Exam (elaborations) • 8 pages • 2024
  • wastewater grade 1 exam Treatment updated 20-24/2025 domestic wastewater Comes from schools, homes, hospitals, businesses, light industrial facilities. population equivalents 100 lbs wastewater per day, .2 lbs TSS/day, .17 BOD/day industrial wastewater Comes from industries. Compatible wastes can be processed by the plant. Incompatible wastes are toxic to the plant. sanitary wastewater The combined domestic and industrial waste waters from community. storm water Water t...
    (0)
  • $10.29
  • + learn more
ACI Concrete Field Testing Technician - Grade 1 (Canada) 100% Accurate.
  • ACI Concrete Field Testing Technician - Grade 1 (Canada) 100% Accurate.

  • Exam (elaborations) • 10 pages • 2024
  • Available in package deal
  • The standard practice describes the _____ _____ and _____ required to obtain a representative sample of fresh concrete and to assess its tractability to the structure it represents. - ANSWER procedures, location and sample size The procedures used in sampling shall include the use of every precaution that will assist in obtaining samples that are truly representative of the _____and _______ of the concrete. - ANSWER nature, conditions Intermittent scooping of the sample in shovelfuls or bu...
    (0)
  • $14.99
  • + learn more